Uploads by Joe Archer
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
15:50, 19 April 2018 | II-9a.docx (file) | 17 KB | bridge design information | 1 | |
11:19, 16 April 2018 | V-13h.xls (file) | 29 KB | Random number generator for Fly Ash testing | 2 | |
09:37, 16 April 2018 | V-13j.xls (file) | 67 KB | Random number generator for Concrete testing | 1 | |
09:36, 16 April 2018 | V-13i.xls (file) | 50 KB | Random number generator for Asphalt testing | 1 | |
09:35, 16 April 2018 | V-13g.xls (file) | 29 KB | Random number generator for Earthwork testing | 1 | |
16:29, 9 February 2018 | V-14 Pay estimate without DBE.xlsx (file) | 643 KB | Template w/instructions for creating a Monthly Pay Estimate | 1 | |
08:59, 2 January 2018 | Streetlighting removal procedure during construction.pdf (file) | 46 KB | Streetlighting Removal Procedure During Construction | 3 | |
08:58, 2 January 2018 | Streetlighting removal procedure during design.pdf (file) | 14 KB | Streetlighting Removal Procedure During Design | 4 | |
08:55, 13 September 2017 | KCP&L Electrical Service Application Traffic Signal.pdf (file) | 69 KB | KCP&L Commercial & Industrial Electrical Service Application for Traffic Signal Control Centers. | 1 | |
08:48, 13 September 2017 | KCP&L Electrical Service Application Streetlighting.pdf (file) | 72 KB | KCP&L Commercial & Industrial Electrical Service Application for Streetlighing Control Centers | 1 | |
14:30, 6 December 2016 | III-9c.pdf (file) | 39 KB | Letter from CARS accepting plans | 1 | |
09:56, 16 November 2016 | I-10f.xls (file) | 137 KB | Cars Summary Sheet | 2 | |
09:54, 16 November 2016 | I-10e.doc (file) | 44 KB | Cars Form "A" | 1 | |
09:04, 16 November 2016 | I-1.pdf (file) | 22 KB | Standard Bid Items | 3 | |
08:32, 15 August 2016 | Verizon Inquiries.pdf (file) | 358 KB | Verizon Memo | 1 | |
07:53, 27 June 2016 | II-3o June 2016.xlsx (file) | 24 KB | is a list of Consulting Firms | 1 | |
16:19, 8 March 2016 | III-13a Design Summary Doc OP.pdf (file) | 16 KB | Example Design Summary Document | 2 | |
13:23, 8 March 2016 | Form 1313.xlsx (file) | 52 KB | KDOT Form 1313 Payment Request | 2 | |
13:08, 8 March 2016 | III-22c.pdf (file) | 585 KB | "Consultant Selection Guide for Construction Engineering on LPA Projects". | 3 | |
11:48, 8 March 2016 | 17.0 Bridge Design 12-2014.pdf (file) | 931 KB | 17.0 Bridge Design 12-2014 of KDOT LPA Project Development Manual | 1 | |
11:19, 8 March 2016 | I-13c.docx (file) | 16 KB | sample transmittal letter for KDOT form 1302 | 1 | |
14:36, 18 February 2016 | Final Plan Review Checklist.docx (file) | 83 KB | Final Plan Review Checklist | 3 | |
16:44, 12 November 2015 | III-11a-2a Bid-KDOT.docx (file) | 26 KB | Bid (KDOT Projects) | 5 | |
09:07, 10 November 2015 | Using MakeSpec-Instructions.doc (file) | 26 KB | Instructions for using the program MakeSpec | 3 | |
09:04, 10 November 2015 | Using MakeSpec-Consultant Instructions.doc (file) | 27 KB | Consultant instructions for using the program MakeSpec | 2 | |
16:34, 2 November 2015 | 15.0 LPA-Administered Procedures 12-2014.pdf (file) | 2.51 MB | 1 | ||
16:29, 2 November 2015 | 06.0 Right of Way 12-2014.pdf (file) | 1,005 KB | 1 | ||
16:25, 2 November 2015 | 05.0 Road Design 12-2014.pdf (file) | 1.92 MB | 1 | ||
16:18, 2 November 2015 | 08.0 CE Consultant Selection and Agreement 12-2014.pdf (file) | 183 KB | 1 | ||
16:17, 2 November 2015 | 03.0 PE Consultant Selection and Agreement 12-2014.pdf (file) | 183 KB | 1 | ||
16:13, 2 November 2015 | 04.0 Environmental 12-2014.pdf (file) | 154 KB | 1 | ||
16:10, 2 November 2015 | 02.0 PROGRAMMING 12-2014.pdf (file) | 298 KB | 1 | ||
16:22, 22 October 2015 | II-24e.docx (file) | 15 KB | listing of contact information and addresses for the ECA agencies | 1 | |
11:29, 21 October 2015 | I-13a.xlsx (file) | 55 KB | KDOT Form 1302 | 1 | |
14:00, 23 September 2015 | II-3o September 2015.xlsx (file) | 24 KB | list of Consulting Firms | 1 | |
15:51, 22 September 2015 | Form1307.pdf (file) | 190 KB | 2 | ||
08:29, 27 July 2015 | Sample letter to KCP&L informing.docx (file) | 19 KB | sample letter to KCP&L informing to adjust billing | 2 | |
14:07, 1 June 2015 | II-3o May 2015.xlsx (file) | 24 KB | List of Consulting Firms | 2 | |
16:26, 4 May 2015 | II-3o April 2015.xlsx (file) | 24 KB | List of Consulting Firms | 2 | |
08:30, 3 April 2015 | V-11c.docx (file) | 43 KB | transmittal letter to the contractor for completed submittals review | 1 | |
08:01, 23 March 2015 | KCP&L Electrical Service Application.docx (file) | 39 KB | KCP&L Commercial & Industrial Electrical Service Application | 1 | |
17:03, 6 March 2015 | KCP&L DWG 130.1-12.pdf (file) | 256 KB | KCP&L clearance from signal or streetlight poles to utility lines | 1 | |
10:09, 15 January 2015 | Tract File Checklist.docx (file) | 19 KB | Tract File Checklist | 1 | |
10:06, 1 December 2014 | Sample letter to Black & McDonald holding.docx (file) | 18 KB | sample letter to Black & McDonald holding release of removal of streetlights | 2 | |
09:52, 1 December 2014 | Sample letter to Black & McDonald releasing.docx (file) | 18 KB | sample letter to Black & McDonald releasing the removal of streetlights to construction | 1 | |
09:38, 1 December 2014 | Sample letter requesting streetlight removal proposals.docx (file) | 16 KB | sample letter requesting streetlight removal proposals | 1 | |
10:41, 20 November 2014 | Commerical Building Permit Application.pdf (file) | 94 KB | Commerical Building Permit Application | 1 | |
09:26, 20 November 2014 | Atmos Energy Cover Letter Sample.docx (file) | 17 KB | Atmos Energy Cover Letter Sample | 1 | |
09:26, 20 November 2014 | Atmos Energy Elevated Pressure Request Form.pdf (file) | 9 KB | Atmos Energy Elevated Pressure Request Form | 1 | |
09:24, 20 November 2014 | Atmos Energy new meter set application.xlsx (file) | 20 KB | Atmos Energy new meter set application | 1 |