Difference between revisions of "Approved Materials - Storm Drainage"
Jump to navigation
Jump to search
Zach Matteo (talk | contribs) |
Zach Matteo (talk | contribs) |
||
Line 200: | Line 200: | ||
|align="center"|B | |align="center"|B | ||
|align="center"|P3 | |align="center"|P3 | ||
|align="center"| | |align="center"|HK TSS 185 | ||
|rowspan="2" align="center"|5/5/2017 | |rowspan="2" align="center"|5/5/2017 | ||
|rowspan="2"| | |rowspan="2"| | ||
Line 209: | Line 209: | ||
|- | |- | ||
|rowspan="2"|Forterra | |||
|rowspan="2"| | |rowspan="2" align="center"|48” | ||
|| | |rowspan="2" align="center"|C | ||
|rowspan="2" align="center"| | |align="center"|P3 | ||
| | |align="center"|HK TSS 185 | ||
|rowspan="2" align="center"| | |rowspan="2" align="center"|5/5/2017 | ||
|rowspan="2"| | |rowspan="2"| | ||
|- | |- | ||
|| | |align="center"|CX4 | ||
|align="center"|Press Seal 25/32 | |||
|- | |- | ||
|rowspan="2"| | |||
|| | |rowspan="2"|Forterra | ||
|rowspan="2" align="center"| | |rowspan="2" align="center"|54” | ||
| | |rowspan="2" align="center"|C | ||
|rowspan="2" align="center"| | |align="center"|P3 | ||
|rowspan="2"| | |align="center"|HK TSS 185 | ||
|rowspan="2" align="center"|5/5/2017 | |||
|rowspan="2"| | |||
|- | |- | ||
|| | |align="center"|CX4 | ||
|align="center"|Press Seal 25/32 | |||
|- | |- | ||
| | |||
| | |Forterra | ||
|align="center"|60", 66" | |||
| | |align="center"|C | ||
| | |align="center"|CX4 | ||
| | |align="center"|Press Seal 25/32 | ||
|align="center"|5/5/2017 | |||
| | |||
|- | |- | ||
|| | |||
|Forterra | |||
|align="center"|72", 78" | |||
|align="center"|C | |||
|align="center"|CX4 | |||
|align="center"|Press Seal 27/32 | |||
|align="center"|5/5/2017 | |||
| | |||
|- | |- | ||
| | |||
|| | |Forterra | ||
| | |align="center"|84", 90" | ||
| | |align="center"|B | ||
| | |align="center"|CX4 | ||
|align="center"|Press Seal 1 | |||
|align="center"|5/5/2017 | |||
| | |||
|- | |- | ||
|| | |||
|Forterra | |||
|align="center"|96", 144" | |||
|align="center"|B | |||
|align="center"|CX4 | |||
|align="center"|Press Seal 1-3/32 | |||
|align="center"|5/5/2017 | |||
| | |||
|- | |- | ||
| | |Forterra | ||
| | |align="center"|108", 120" | ||
|align="center"|B | |||
|align="center"|CX4 | |||
|align="center"|Press Seal 1-1/16 | |||
|align="center"|5/5/2017 | |||
| | |||
| | |||
| | |||
| | |||
| | |||
| | |||
|- | |- | ||
== Underdrains == | == Underdrains == |
Revision as of 14:55, 4 May 2017
Return to Preapproved Materials
Inlet Frames
Applicable Specification:
Overland Park Standard Details |
Manufacturer | Product Name or Number | Approval Date | Comment | Catalog Cut Links |
EJ Group, Inc. | Curb Inlet 10” Throat | 4/27/2017 | Curb Inlet 10” Frame | |
Shawnee Steel & Welding Inc. | Curb Inlet 10” Throat | 4/27/2017 | Curb Inlet 10” Frame | |
Shawnee Steel & Welding Inc. | Area Inlet 10” Throat | 4/27/2017 | Area Inlet 10” Frame |
Manhole Steps
Applicable Specification:
Overland Park Standard Details (Precast Manhole Detail) Overland Park Construction Specifications - Chapter 33 |
Manufacturer | Product Name or Number | Approval Date | Comment | Catalog Cut Links |
American Step | ML-13 | 3/27/2017 | ML-13 | |
American Step | ML-10 | 3/27/2017 | ML-10 | |
MA Industries | PS1-PF | 3/27/2017 | PS1-PF | |
MA Industries | PS2-PF | 3/27/2017 | PS2-PF |
Manhole Rings & Lids
Applicable Specification:
Overland Park Standard Details (Manhole Casting Detail) Overland Park Construction Specifications - Chapter 33 |
Manufacturer | Product Name or Number | Type | Approval Date | Comment | Catalog Cut Links |
Castings from overseas shall have the coupon as required in AASHTO M-306 for testing. | |||||
EJ Group, Inc. | 1501 A and Z | Medium Duty | 4/7/2017 | 1501 | |
1502 A and Z | Heavy Duty | 4/7/2017 | 1502 | ||
Clay and Bailey | N2161-CSTSWR | Medium Duty | 4/13/2017 | N2161-CSTSWR | |
N2160-CSTSWR | Heavy Duty | 4/13/2017 | N2160-CSTSWR | ||
Sigma | - | Medium Duty | - | pending | |
- | Heavy Duty | - | pending |
Sealants - Manhole
Applicable Specification:
Johnson County Wastewater Standard Details |
Manufacturer | Product Name or Number | Approval Date | Comment | Catalog Cut Links |
Hamilton Kent | No. 2 | 4/13/2017 | Kent Seal No. 2 | |
Trelleborg | Bidco – C56 Butyl | 4/13/2017 | C56 Sealant | |
Press-Seal Corp. | Pro-Stik | 4/13/2017 | Pro-Stik |
Sealants - RCBs & Non-circular Pipe
Manufacturer | Product Name or Number | Approval Date | Comment | Catalog Cut Links |
Blackhawk | Mastic | 4/14/2017 | BH5401 | |
Mar-Mac Manufacturing | Mac-Wrap | 4/14/2017 | Mac-Wrap |
Class III Concrete Pipe
Applicable Specification:
Overland Park Construction Specifications - Chapter 31 |
Underdrains
Applicable Specification:
Manufacturer | Pipe Size | Wall Size | Joint Design | Gaskets | Approval Date | Catalog Cut Links |
Pretech | 15”-36” | B | Profile | Hamilton Kent - Tylox Super Seal | 5/5/2017 | |
Forsheda | ||||||
Pretech | 42”-78” | B/C | Profile | Hamilton Kent - Tylox Super Seal | 5/5/2017 | |
Forsheda | ||||||
Forterra | 12" | C | P4 | HK TSS135 | 5/5/2017 | |
Forterra | 15"-18" | B/C | P4 | HK TSS135 | 5/5/2017 | |
Forterra | 21" | B/C | CX4 | Press Seal 21/32 | 5/5/2017 | |
Forterra | 24"-36" | B/C | P4 | HK TSS135 | 5/5/2017 | |
Forterra | 42” | B | P3 | HK TSS 185 | 5/5/2017 | |
C | CX4 | Press Seal 25/32 | ||||
Forterra | 48” | C | P3 | HK TSS 185 | 5/5/2017 | |
CX4 | Press Seal 25/32 | |||||
Forterra | 54” | C | P3 | HK TSS 185 | 5/5/2017 | |
CX4 | Press Seal 25/32 | |||||
Forterra | 60", 66" | C | CX4 | Press Seal 25/32 | 5/5/2017 | |
Forterra | 72", 78" | C | CX4 | Press Seal 27/32 | 5/5/2017 | |
Forterra | 84", 90" | B | CX4 | Press Seal 1 | 5/5/2017 | |
Forterra | 96", 144" | B | CX4 | Press Seal 1-3/32 | 5/5/2017 | |
Forterra | 108", 120" | B | CX4 | Press Seal 1-1/16 | 5/5/2017 |
Overland Park Construction Specifications - Chapter 34 KDOT 822 and 1907 with modifications |
Manufacturer | Product Name or Number | Type | Approval Date | Comment | Catalog Cut Links |
Contech | A-2000 | H | 3/29/2017 | A-2000 | |
ADS | N-12 | T | 3/29/2017 | N-12 | |
ADS | AdvanEDGE | T (Alt.) | 4/14/2017 | AdvanEDGE |