User contributions for Bruce Wacker
Results for Bruce Wacker talk block log uploads logs
A user with 8,460 edits. Account created on 11 June 2012.
8 April 2021
- 17:0017:00, 8 April 2021 diff hist +165 Approved Materials - Streetlighting →Screw-In Pole Foundations
- 16:5916:59, 8 April 2021 diff hist 0 N File:TRF PQL SL PHOT ABChance Screw-inFoundations SideBasePlate.JPG No edit summary current
- 16:5716:57, 8 April 2021 diff hist 0 N File:TRF PQL SL PHOT ABChance Screw-inFoundations TopBasePlate.JPG No edit summary current
- 16:5616:56, 8 April 2021 diff hist +9 Approved Materials - Streetlighting →Screw-In Pole Foundations
- 16:5216:52, 8 April 2021 diff hist 0 N File:TRF PQL SL CAT ABChance TypeF2Screw-inFoundationATKC.pdf No edit summary
- 16:5116:51, 8 April 2021 diff hist 0 N File:TRF PQL SL CAT ABChance TypeF1Screw-inFoundationATKC.pdf No edit summary
- 16:5116:51, 8 April 2021 diff hist 0 N File:TRF PQL SL CAT ABChance TypeT1Screw-inFoundationATKC.pdf No edit summary
- 16:5016:50, 8 April 2021 diff hist 0 N File:TRF PQL SL CAT ABChance TypeRScrew-inFoundationATKC.pdf No edit summary
7 April 2021
- 17:0217:02, 7 April 2021 diff hist +895 Approved Materials - Streetlighting →Cable Retainer Device
- 17:0117:01, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 6InchCableRetainer Label.jpg No edit summary current
- 17:0017:00, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 6InchCableRetainer Edge.jpg No edit summary current
- 16:5916:59, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 6InchCableRetainer Bottom.jpg No edit summary current
- 16:5916:59, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 6InchCableRetainer Top.jpg No edit summary current
- 16:5716:57, 7 April 2021 diff hist 0 File:TRF PQL SL PHOT Pelco 4InchCableRetainer Label.jpg Bruce Wacker uploaded a new version of File:TRF PQL SL PHOT Pelco 4InchCableRetainer Label.jpg current
- 16:5616:56, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 4InchCableRetainer Label.jpg No edit summary
- 16:5516:55, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 4InchCableRetainer Edge.jpg No edit summary current
- 16:5416:54, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 4InchCableRetainer Bottom.jpg No edit summary current
- 16:5216:52, 7 April 2021 diff hist 0 File:TRF PQL SL PHOT Pelco 4InchCableRetainer Top.jpg Bruce Wacker uploaded a new version of File:TRF PQL SL PHOT Pelco 4InchCableRetainer Top.jpg current
- 16:4916:49, 7 April 2021 diff hist 0 File:TRF PQL SL PHOT Pelco 4InchCableRetainer Top.jpg Bruce Wacker uploaded a new version of File:TRF PQL SL PHOT Pelco 4InchCableRetainer Top.jpg
- 16:4516:45, 7 April 2021 diff hist 0 N File:TRF PQL SL PHOT Pelco 4InchCableRetainer Top.jpg No edit summary
- 16:3916:39, 7 April 2021 diff hist 0 N File:TRF PQL SL CAT Pelco 6InchCableRetainer.pdf No edit summary current
- 16:3716:37, 7 April 2021 diff hist 0 N File:TRF PQL SL CAT Pelco 4InchCableRetainer.pdf No edit summary current
- 16:3516:35, 7 April 2021 diff hist +111 Approved Materials - Streetlighting →Cable Retainer Device
- 16:2616:26, 7 April 2021 diff hist +48 Approved Materials - Streetlighting →Cable Retainer Device
- 16:2616:26, 7 April 2021 diff hist −32 Approved Materials - Streetlighting →Anti-Theft Cable Devices
- 16:2516:25, 7 April 2021 diff hist −662 Approved Materials - Streetlighting →Anti-Theft Cable Device
- 16:2516:25, 7 April 2021 diff hist +4 Approved Materials - Streetlighting →Cable Theft Device
6 April 2021
- 09:5209:52, 6 April 2021 diff hist 0 Private Street Sign Design Guidelines →Signing Standards: current
- 09:5209:52, 6 April 2021 diff hist +40 Private Street Sign Design Guidelines →Signing Standards:
- 09:5209:52, 6 April 2021 diff hist 0 N File:Private Street Sign.JPG No edit summary current
- 09:5009:50, 6 April 2021 diff hist +3,901 N Private Street Sign Design Guidelines Created page with "'''City Guidelines Regarding the Installation of Signs on Private Streets'''<br>Traffic Services Division of the Department of Public Works == Governing Document Reference: =..."
- 09:4009:40, 6 April 2021 diff hist +64 Traffic Sign Design Guidelines No edit summary
2 April 2021
- 15:1015:10, 2 April 2021 diff hist −4 Approved Materials - Traffic Signals →Power Transfer Switches
- 15:0915:09, 2 April 2021 diff hist +14 Approved Materials - Traffic Signals →Power Transfer Switches
- 15:0815:08, 2 April 2021 diff hist −606 Approved Materials - Traffic Signals →Power Transfer Switches
- 15:0015:00, 2 April 2021 diff hist +157 Approved Materials - Traffic Signals →Power Transfer Switches
- 14:5914:59, 2 April 2021 diff hist 0 N File:TRF PQL TS CAT Clary PowerTransferSwitchMountingBracket.pdf No edit summary current
- 14:5614:56, 2 April 2021 diff hist 0 N File:TRF PQL TS MEM Clary PowerTransferSwitch.pdf No edit summary
- 14:4714:47, 2 April 2021 diff hist +55 Approved Materials - Traffic Signals →Power Transfer Switches
- 14:4714:47, 2 April 2021 diff hist 0 N File:TRF PQL TS CAT Clary PowerTransferSwitch.pdf No edit summary
- 14:4714:47, 2 April 2021 diff hist +4 Approved Materials - Traffic Signals →Power Transfer Switches
- 14:4614:46, 2 April 2021 diff hist +70 N File:TRF PQL TS CAT Clary PowerTransferSwitch Front.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch Front.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch Front.JPG current Tag: New redirect
- 14:4614:46, 2 April 2021 diff hist 0 m File:TRF PQL TS PHOT Clary PowerTransferSwitch Front.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch Front.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch Front.JPG current
- 14:4614:46, 2 April 2021 diff hist +80 N File:TRF PQL TS CAT Clary PowerTransferSwitch PowerConnection.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch PowerConnection.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch PowerConnection.JPG current Tag: New redirect
- 14:4614:46, 2 April 2021 diff hist 0 m File:TRF PQL TS PHOT Clary PowerTransferSwitch PowerConnection.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch PowerConnection.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch PowerConnection.JPG current
- 14:4614:46, 2 April 2021 diff hist +68 N File:TRF PQL TS CAT Clary PowerTransferSwitch UPS.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch UPS.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch UPS.JPG current Tag: New redirect
- 14:4614:46, 2 April 2021 diff hist 0 m File:TRF PQL TS PHOT Clary PowerTransferSwitch UPS.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch UPS.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch UPS.JPG current
- 14:4514:45, 2 April 2021 diff hist +70 N File:TRF PQL TS CAT Clary PowerTransferSwitch Label.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch Label.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch Label.JPG current Tag: New redirect
- 14:4514:45, 2 April 2021 diff hist 0 m File:TRF PQL TS PHOT Clary PowerTransferSwitch Label.JPG Bruce Wacker moved page File:TRF PQL TS CAT Clary PowerTransferSwitch Label.JPG to File:TRF PQL TS PHOT Clary PowerTransferSwitch Label.JPG current
- 14:4214:42, 2 April 2021 diff hist +383 Approved Materials - Traffic Signals →Power Transfer Switches
- 14:4214:42, 2 April 2021 diff hist 0 N File:TRF PQL TS PHOT Clary PowerTransferSwitch Label.JPG No edit summary
- 14:4114:41, 2 April 2021 diff hist 0 N File:TRF PQL TS PHOT Clary PowerTransferSwitch UPS.JPG No edit summary
- 14:4014:40, 2 April 2021 diff hist 0 N File:TRF PQL TS PHOT Clary PowerTransferSwitch PowerConnection.JPG No edit summary
- 14:3914:39, 2 April 2021 diff hist 0 N File:TRF PQL TS PHOT Clary PowerTransferSwitch Front.JPG No edit summary
31 March 2021
- 10:0410:04, 31 March 2021 diff hist −25 Yield Sign Design Guidelines →Governing Document Reference: current
- 10:0310:03, 31 March 2021 diff hist −25 Street Name Sign Design Guidelines →Governing Document Reference:
- 10:0210:02, 31 March 2021 diff hist −25 School Zone Sign Design Guidelines →Governing Document Reference:
- 10:0210:02, 31 March 2021 diff hist −25 Speed Limit Sign Design Guidelines →Governing Document Reference:
- 10:0110:01, 31 March 2021 diff hist −25 Roundabout Sign Design Guidelines →Governing Document Reference:
- 10:0110:01, 31 March 2021 diff hist +30 Object Marker Sign Design Guidelines →Governing Document Reference:
- 10:0010:00, 31 March 2021 diff hist +30 No U-Turn Sign Design Guidelines →Governing Document Reference: current
- 10:0010:00, 31 March 2021 diff hist +30 No Outlet Sign Design Guidelines →Governing Document Reference:
- 10:0010:00, 31 March 2021 diff hist +30 Keep Right Sign Design Guidelines →Governing Document Reference: current
- 10:0010:00, 31 March 2021 diff hist +30 Hospital Sign Design Guidelines →Governing Document Reference: current
- 09:5909:59, 31 March 2021 diff hist +30 General Information / Miscellaneous Information Design Guidelines →Governing Document Reference: current
- 09:5909:59, 31 March 2021 diff hist +30 End of Roadway Markers Design Guidelines →Governing Document Reference: current
- 09:5909:59, 31 March 2021 diff hist +30 Emergency Vehicle and Emergency Signal Sign Design Guidelines →Governing Document Reference: current
- 09:5909:59, 31 March 2021 diff hist +30 Do Not Block Intersection Sign Design Guidelines →Governing Document Reference: current
- 09:5809:58, 31 March 2021 diff hist +30 Disabled Parking Sign Design Guidelines →Governing Document Reference:
- 09:5809:58, 31 March 2021 diff hist +30 Destination Guide Sign Design Guidelines →Governing Document Reference: current
- 09:5809:58, 31 March 2021 diff hist +30 Deer Crossing Sign Design Guidelines →Governing Document Reference: current
- 09:5709:57, 31 March 2021 diff hist +30 Deaf or Blind Child Sign Design Guidelines →Governing Document Reference: current
- 09:5609:56, 31 March 2021 diff hist +30 Cultural Interest Area Guide Signs Design Guidelines →Governing Document Reference:
- 09:5509:55, 31 March 2021 diff hist −55 Object Marker Sign Design Guidelines →Governing Document Reference:
- 09:5509:55, 31 March 2021 diff hist −55 No U-Turn Sign Design Guidelines →Governing Document Reference:
- 09:5409:54, 31 March 2021 diff hist −55 No Outlet Sign Design Guidelines →Governing Document Reference:
- 09:5409:54, 31 March 2021 diff hist 0 Keep Right Sign Design Guidelines →Governing Document Reference:
- 09:5309:53, 31 March 2021 diff hist −55 Hospital Sign Design Guidelines →Governing Document Reference:
- 09:5309:53, 31 March 2021 diff hist −55 General Information / Miscellaneous Information Design Guidelines →Governing Document Reference:
- 09:5309:53, 31 March 2021 diff hist −55 End of Roadway Markers Design Guidelines →Governing Document Reference:
- 09:5309:53, 31 March 2021 diff hist −55 Emergency Vehicle and Emergency Signal Sign Design Guidelines →Governing Document Reference:
- 09:5209:52, 31 March 2021 diff hist −55 Do Not Block Intersection Sign Design Guidelines →Governing Document Reference:
- 09:5209:52, 31 March 2021 diff hist −55 Disabled Parking Sign Design Guidelines →Governing Document Reference:
- 09:5209:52, 31 March 2021 diff hist −55 Destination Guide Sign Design Guidelines →Governing Document Reference:
- 09:5109:51, 31 March 2021 diff hist −55 Deer Crossing Sign Design Guidelines →Governing Document Reference:
- 09:5109:51, 31 March 2021 diff hist −55 Deaf or Blind Child Sign Design Guidelines →Governing Document Reference:
- 09:5009:50, 31 March 2021 diff hist −55 Cultural Interest Area Guide Signs Design Guidelines →Governing Document Reference:
- 09:3009:30, 31 March 2021 diff hist 0 Keep Right Sign Design Guidelines →Governing Document Reference:
- 09:2809:28, 31 March 2021 diff hist −55 Keep Right Sign Design Guidelines →Governing Document Reference:
23 March 2021
- 16:3516:35, 23 March 2021 diff hist +132 Approved Materials - Traffic Signals →1C CPU Module
- 16:3416:34, 23 March 2021 diff hist 0 N File:TRF PQL TS PHOT Econolite 1CModule Side.JPG No edit summary current
- 16:3316:33, 23 March 2021 diff hist 0 N File:TRF PQL TS PHOT Econolite 1CModule Front.JPG No edit summary current
18 March 2021
- 08:3608:36, 18 March 2021 diff hist +46 Approved Materials - Streetlighting →Anti-Theft Cable Device
16 March 2021
15 March 2021
- 15:5415:54, 15 March 2021 diff hist +64 Approved Materials - Streetlighting →Anti-Theft Cable Device
- 15:5315:53, 15 March 2021 diff hist +29 Approved Materials - Streetlighting →Anti-Theft Cable Device
- 15:5215:52, 15 March 2021 diff hist +33 Approved Materials - Streetlighting →Breakaway Pole Devices
- 15:5015:50, 15 March 2021 diff hist +522 Approved Materials - Streetlighting →Break-away Couplings
11 March 2021
- 15:4415:44, 11 March 2021 diff hist 0 N File:TRF PQL TS CAT ASCO SurgeProtectionDevice.pdf No edit summary current
- 15:3515:35, 11 March 2021 diff hist +105 Approved Materials - Traffic Signals →Presence Radar Detectors
- 15:3515:35, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply SurgeProtection.JPG No edit summary current
- 15:3215:32, 11 March 2021 diff hist +403 Approved Materials - Traffic Signals →Presence Radar Detectors
- 15:3215:32, 11 March 2021 diff hist +75 N File:TRF PQL TS CAT Iteris RadarDetectionSystem CCU Side.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem CCU Side.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem CCU Side.JPG current Tag: New redirect
- 15:3215:32, 11 March 2021 diff hist 0 m File:TRF PQL TS PHOT Iteris RadarDetectionSystem CCU Side.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem CCU Side.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem CCU Side.JPG current
- 15:3215:32, 11 March 2021 diff hist +78 N File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply.JPG current Tag: New redirect
- 15:3215:32, 11 March 2021 diff hist 0 m File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply.JPG current
- 15:3115:31, 11 March 2021 diff hist +83 N File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply Side.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply Side.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply Side.JPG current Tag: New redirect
- 15:3115:31, 11 March 2021 diff hist 0 m File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply Side.JPG Bruce Wacker moved page File:TRF PQL TS CAT Iteris RadarDetectionSystem PowerSupply Side.JPG to File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply Side.JPG current
- 15:3015:30, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem Bracket.JPG No edit summary current
- 15:2815:28, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply Side.JPG No edit summary
- 15:2715:27, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem PowerSupply.JPG No edit summary
- 15:2615:26, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem CCU Side.JPG No edit summary
- 15:2515:25, 11 March 2021 diff hist 0 N File:TRF PQL TS PHOT Iteris RadarDetectionSystem CCU.JPG No edit summary current
- 14:5014:50, 11 March 2021 diff hist 0 File:TRF PQL TS MEM Iteris RadarDetectionSystem.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM Iteris RadarDetectionSystem.pdf current
- 14:4814:48, 11 March 2021 diff hist 0 Approved Materials - Traffic Signals →Presence Radar Detectors
22 February 2021
- 11:5911:59, 22 February 2021 diff hist 0 File:TRF PQL SL CAT Myers 4CircuitControllerCabinet.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL CAT Myers 4CircuitControllerCabinet.pdf
17 February 2021
- 17:5217:52, 17 February 2021 diff hist +68 Approved Materials - Traffic Signals →Presence Radar Detectors
- 17:5117:51, 17 February 2021 diff hist 0 N File:TRF PQL TS MEM Iteris RadarDetectionSystem.pdf No edit summary
- 17:3817:38, 17 February 2021 diff hist +175 Approved Materials - Traffic Signals →Presence Radar Detectors
- 17:3817:38, 17 February 2021 diff hist 0 N File:TRF PQL TS CAT Iteris SensorMountingBracket.pdf No edit summary current
- 17:3517:35, 17 February 2021 diff hist 0 N File:TRF PQL TS CAT Iteris RadarDetectionSystem.pdf No edit summary current
- 17:2617:26, 17 February 2021 diff hist +49 Approved Materials - Traffic Signals →Presence Radar Detectors
- 17:1317:13, 17 February 2021 diff hist +247 Approved Materials - Traffic Signals →Presence Radar Detectors
2 February 2021
- 17:0117:01, 2 February 2021 diff hist +209 Approved Materials - Signing →Sign Brackets for Parking Lot Sign Bollard
- 17:0117:01, 2 February 2021 diff hist 0 N File:TRF PQL PS MEM SafetySign PipePostMountingBracket.pdf No edit summary current
- 17:0117:01, 2 February 2021 diff hist 0 N File:TRF PQL PS MEM XcessoriesSqured PipePostMountingBracket.pdf No edit summary current
- 17:0017:00, 2 February 2021 diff hist 0 N File:TRF PQL PS CAT XcessoriesSqured PipePostMountingBracket.docx.pdf No edit summary current
- 16:3916:39, 2 February 2021 diff hist +64 Approved Materials - Signing →Sign Brackets for Parking Lot Sign Bollard
- 16:3116:31, 2 February 2021 diff hist 0 N File:TRF PQL PS CAT SafetySign PipePostMountingBracket.pdf No edit summary current
- 16:2716:27, 2 February 2021 diff hist 0 Approved Materials - Signing →Sign Brackets for Parking Lot Sign Bollard
- 16:2616:26, 2 February 2021 diff hist +134 Approved Materials - Signing →Sign Brackets for Parking Lot Sign Bollard
- 16:0316:03, 2 February 2021 diff hist +529 Approved Materials - Signing →Mounting Brackets
- 15:4715:47, 2 February 2021 diff hist +2 Approved Materials - Streetlighting No edit summary
- 15:4415:44, 2 February 2021 diff hist +576 Approved Materials - Streetlighting →Cable
14 January 2021
- 15:1415:14, 14 January 2021 diff hist +54 Approved Materials - Fiber Optics →Ethernet Switch Rack
- 15:1315:13, 14 January 2021 diff hist 0 N File:TRF PQL FO MEM CISCO EthernetSwitchRack.pdf No edit summary current
- 15:0715:07, 14 January 2021 diff hist −1 Approved Materials - Fiber Optics →Ethernet Switches
- 14:5814:58, 14 January 2021 diff hist +26 Approved Materials - Fiber Optics →Ethernet Switch Power Supply
- 14:5614:56, 14 January 2021 diff hist +998 Approved Materials - Fiber Optics →Ethernet Switches
- 14:5614:56, 14 January 2021 diff hist 0 N File:TRF PQL FO PHOT MeanWell EthernetSwitchPowerSupply Side.jpg No edit summary current
- 14:5514:55, 14 January 2021 diff hist 0 N File:TRF PQL FO PHOT MeanWell EthernetSwitchPowerSupply Back.jpg No edit summary current
- 14:5414:54, 14 January 2021 diff hist 0 N File:TRF PQL FO PHOT MeanWell EthernetSwitchPowerSupply Front.jpg No edit summary current
- 14:5314:53, 14 January 2021 diff hist 0 N File:TRF PQL FO MEM MeanWell EthernetSwitchPowerSupply.pdf No edit summary current
- 14:4914:49, 14 January 2021 diff hist 0 N File:TRF PQL FO CAT MeanWell EthernetSwitchPowerSupply.pdf No edit summary current
- 14:4814:48, 14 January 2021 diff hist 0 File:TRF PQL FO MEM Cisco EthernetSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Cisco EthernetSwitch.pdf current
13 January 2021
- 15:1815:18, 13 January 2021 diff hist −951 Approved Materials - Signing →Illuminated Street Name Signs
12 January 2021
- 16:1816:18, 12 January 2021 diff hist 0 File:TRF PQL PM MEM Preform PreformedThermoplastic.pdf Bruce Wacker uploaded a new version of File:TRF PQL PM MEM Preform PreformedThermoplastic.pdf
- 16:1516:15, 12 January 2021 diff hist +93 Approved Materials - Pavement Marking →Preformed Thermoplastic
- 16:1416:14, 12 January 2021 diff hist 0 N File:TRF PQL PM CAT Preoform PreformedThermoPrimer.pdf No edit summary current
- 12:4812:48, 12 January 2021 diff hist 0 Approved Materials - Streetlighting →Support Spacers
- 12:4812:48, 12 January 2021 diff hist 0 File:TRF PQL SL MEM RebarSupportProducts RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL MEM RebarSupportProducts RebarSupportSpacers.pdf current
- 12:4812:48, 12 January 2021 diff hist 0 File:TRF PQL SL MEM Pieresearch RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL MEM Pieresearch RebarSupportSpacers.pdf current
- 12:4712:47, 12 January 2021 diff hist 0 File:TRF PQL SL MEM FoundationTechnologies RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL MEM FoundationTechnologies RebarSupportSpacers.pdf current
- 12:4112:41, 12 January 2021 diff hist 0 File:TRF PQL TS MEM RebarSupportProducts RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM RebarSupportProducts RebarSupportSpacers.pdf current
- 12:4112:41, 12 January 2021 diff hist 0 File:TRF PQL TS MEM Pieresearch RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM Pieresearch RebarSupportSpacers.pdf current
- 12:4012:40, 12 January 2021 diff hist 0 File:TRF PQL TS MEM FoundationTechnologies RebarSupportSpacers.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM FoundationTechnologies RebarSupportSpacers.pdf current
- 12:3512:35, 12 January 2021 diff hist +39 Approved Materials - Traffic Signals →Support Spacers
- 12:3412:34, 12 January 2021 diff hist +39 Approved Materials - Traffic Signals →Support Spacers
- 12:2612:26, 12 January 2021 diff hist +43 Approved Materials - Traffic Signals →Support Spacers
- 10:2010:20, 12 January 2021 diff hist +290 Approved Materials - Streetlighting →Support Spacers
- 10:1710:17, 12 January 2021 diff hist +394 Approved Materials - Streetlighting →Support Spacers
- 10:1710:17, 12 January 2021 diff hist 0 N File:TRF PQL SL MEM FoundationTechnologies RebarSupportSpacers.pdf No edit summary
- 10:1710:17, 12 January 2021 diff hist 0 N File:TRF PQL SL CAT FoundationTechnologies SupportBoots.pdf No edit summary current
- 10:1610:16, 12 January 2021 diff hist 0 N File:TRF PQL SL CAT FoundationTechnologies DrillShaftWheels.pdf No edit summary current
- 10:1310:13, 12 January 2021 diff hist +299 Approved Materials - Traffic Signals →Support Spacers
- 09:5609:56, 12 January 2021 diff hist +72 Approved Materials - Traffic Signals →Support Spacers
- 09:5509:55, 12 January 2021 diff hist 0 N File:TRF PQL TS MEM FoundationTechnologies RebarSupportSpacers.pdf No edit summary
- 09:4909:49, 12 January 2021 diff hist +322 Approved Materials - Traffic Signals →Support Spacers
- 09:4809:48, 12 January 2021 diff hist 0 N File:TRF PQL TS CAT FoundationTechnologies SupportBoots.pdf No edit summary current
- 09:4609:46, 12 January 2021 diff hist 0 N File:TRF PQL TS CAT FoundationTechnologies DrillShaftWheels.pdf No edit summary current
7 January 2021
- 17:3317:33, 7 January 2021 diff hist −387 Approved Materials - Signing →Wing Mounting Brackets
- 17:2917:29, 7 January 2021 diff hist +593 Approved Materials - Signing →Wing Mounting Brackets
- 17:2917:29, 7 January 2021 diff hist 0 N File:TRF PQL PS PHOT XcessoriesSquared WingBracket Assembly.JPG No edit summary current
- 17:2817:28, 7 January 2021 diff hist 0 N File:TRF PQL PS PHOT XcessoriesSquared WingBracket Channel.JPG No edit summary current
- 17:2617:26, 7 January 2021 diff hist 0 N File:TRF PQL PS PHOT XcessoriesSquared WingBracket Bracket&Channel.JPG No edit summary current
- 17:2517:25, 7 January 2021 diff hist 0 N File:TRF PQL PS PHOT XcessoriesSquared WingBracket Bracket.JPG No edit summary current
- 17:2517:25, 7 January 2021 diff hist 0 N File:TRF PQL PS MEM XcessoriesSquared WingBracket.pdf No edit summary current
- 17:2417:24, 7 January 2021 diff hist 0 File:TRF PQL PS CAT XcessoriesSquared WingBracket.pdf Bruce Wacker uploaded a new version of File:TRF PQL PS CAT XcessoriesSquared WingBracket.pdf current
- 17:2317:23, 7 January 2021 diff hist 0 N File:TRF PQL PS CAT XcessoriesSquared WingBracket.pdf No edit summary
- 16:0916:09, 7 January 2021 diff hist +44 Approved Materials - Signing →Parking Lot Sign Bollard
- 15:5315:53, 7 January 2021 diff hist −8 Approved Materials - Signing →Sign Banding
- 15:5315:53, 7 January 2021 diff hist −8 Approved Materials - Signing →Round Pole Mounting Bracket
- 11:0311:03, 7 January 2021 diff hist +45 Approved Materials - Streetlighting →Type 2 Junction Box
- 11:0311:03, 7 January 2021 diff hist +45 Approved Materials - Streetlighting →Type 1 Junction Box
- 11:0211:02, 7 January 2021 diff hist +45 Approved Materials - Fiber Optics →Type 2 Fiber Optic Service Box
- 11:0211:02, 7 January 2021 diff hist +45 Approved Materials - Fiber Optics →Type 1 Fiber Optic Service Box
- 11:0111:01, 7 January 2021 diff hist +22 Approved Materials - Streetlighting →Type 2 Junction Box
- 11:0111:01, 7 January 2021 diff hist +22 Approved Materials - Streetlighting →Type 1 Junction Box
- 11:0011:00, 7 January 2021 diff hist −1 Approved Materials - Fiber Optics →Type 1 Fiber Optic Service Box
- 11:0011:00, 7 January 2021 diff hist −1 Approved Materials - Fiber Optics →Type 2 Fiber Optic Service Box
- 10:5910:59, 7 January 2021 diff hist +23 Approved Materials - Fiber Optics →Type 2 Fiber Optic Service Box
- 10:5910:59, 7 January 2021 diff hist +23 Approved Materials - Fiber Optics →Type 1 Fiber Optic Service Box
4 January 2021
- 15:5715:57, 4 January 2021 diff hist −584 Approved Materials - Traffic Signals →Countdown Pedestrian LED
- 15:5115:51, 4 January 2021 diff hist −157 Approved Materials - Traffic Signals →Bi-Modal Green/Yellow LED Arrow
- 15:3615:36, 4 January 2021 diff hist +206 Approved Materials - Traffic Signals →Green Ball LED
- 15:3615:36, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls GreenBallLabel.jpg No edit summary current
- 15:3515:35, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls GreenBallBack.jpg No edit summary current
- 15:3415:34, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls GreenBall.jpg No edit summary current
- 15:3215:32, 4 January 2021 diff hist +209 Approved Materials - Traffic Signals →Yellow Ball LED
- 15:3215:32, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls YellowBallLabel.jpg No edit summary current
- 15:3115:31, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls YellowBallBack.jpg No edit summary current
- 15:3015:30, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls YellowBall.jpg No edit summary current
- 15:2115:21, 4 January 2021 diff hist +61 N File:TRF PQL PHOT Dialight LEDArrows RedBall.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBall.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBall.jpg current Tag: New redirect
- 15:2115:21, 4 January 2021 diff hist 0 m File:TRF PQL PHOT Dialight LEDBalls RedBall.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBall.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBall.jpg current
- 15:2115:21, 4 January 2021 diff hist +65 N File:TRF PQL PHOT Dialight LEDArrows RedBallBack.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBallBack.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBallBack.jpg current Tag: New redirect
- 15:2115:21, 4 January 2021 diff hist 0 m File:TRF PQL PHOT Dialight LEDBalls RedBallBack.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBallBack.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBallBack.jpg current
- 15:2015:20, 4 January 2021 diff hist +66 N File:TRF PQL PHOT Dialight LEDArrows RedBallLabel.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBallLabel.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBallLabel.jpg current Tag: New redirect
- 15:2015:20, 4 January 2021 diff hist 0 m File:TRF PQL PHOT Dialight LEDBalls RedBallLabel.jpg Bruce Wacker moved page File:TRF PQL PHOT Dialight LEDArrows RedBallLabel.jpg to File:TRF PQL PHOT Dialight LEDBalls RedBallLabel.jpg current
- 15:2015:20, 4 January 2021 diff hist −3 Approved Materials - Traffic Signals →Red Ball LED
- 15:1015:10, 4 January 2021 diff hist +215 Approved Materials - Traffic Signals →Yellow LED Arrow
- 15:1015:10, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows YellowArrowLabel.jpg No edit summary current
- 15:0915:09, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows YellowArrowBack.jpg No edit summary current
- 15:0815:08, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows YellowArrow.jpg No edit summary current
- 15:0615:06, 4 January 2021 diff hist +203 Approved Materials - Traffic Signals →Red Ball LED
- 15:0615:06, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls RedBallLabel.jpg No edit summary
- 15:0515:05, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls RedBallBack.jpg No edit summary
- 15:0415:04, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDBalls RedBall.jpg No edit summary
- 14:5914:59, 4 January 2021 diff hist +70 Approved Materials - Traffic Signals →Red LED Arrow
- 14:5914:59, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows RedArrowLabel.jpg No edit summary current
- 14:5814:58, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows RedArrowBack.jpg No edit summary current
- 14:5714:57, 4 January 2021 diff hist 0 N File:TRF PQL PHOT Dialight LEDArrows RedArrow.jpg No edit summary current
23 December 2020
- 17:4817:48, 23 December 2020 diff hist +78 Approved Materials - Traffic Signals →Yellow Ball LED
- 17:4717:47, 23 December 2020 diff hist 0 N File:TRF PQL TS PHOT Leotek LEDYellowBall Label.jpg No edit summary current
- 17:4617:46, 23 December 2020 diff hist 0 N File:TRF PQL TS PHOT Leotek LEDYellowBall Back.jpg No edit summary current
- 17:4617:46, 23 December 2020 diff hist 0 N File:TRF PQL TS PHOT Leotek LEDYellowBall Front.jpg No edit summary current
- 17:1117:11, 23 December 2020 diff hist +416 Approved Materials - Pavement Marking →Preformed Thermoplastic
- 17:1017:10, 23 December 2020 diff hist 0 N File:TRF PQL PM PHOT Preoform PreformedThermo WhiteYellow.JPG No edit summary current
- 17:1017:10, 23 December 2020 diff hist 0 N File:TRF PQL PM PHOT Preoform PreformedThermo YellowIndicators.JPG No edit summary current
- 17:0917:09, 23 December 2020 diff hist 0 N File:TRF PQL PM PHOT Preoform PreformedThermo Yellow.JPG No edit summary current
- 17:0817:08, 23 December 2020 diff hist 0 N File:TRF PQL PM PHOT Preoform PreformedThermo WhiteIndicators.JPG No edit summary current
- 17:0817:08, 23 December 2020 diff hist 0 N File:TRF PQL PM PHOT Preoform PreformedThermo White.JPG No edit summary current
- 17:0217:02, 23 December 2020 diff hist +171 Approved Materials - Pavement Marking →Preformed Thermoplastic
- 17:0217:02, 23 December 2020 diff hist 0 N File:TRF PQL PM MEM Preform PreformedThermoplastic.pdf No edit summary
- 16:5316:53, 23 December 2020 diff hist 0 N File:TRF PQL PM CAT Preoform PreformedThermo.pdf No edit summary current
- 16:5316:53, 23 December 2020 diff hist 0 N File:TRF PQL PM BRO Preform PreformedThermo.pdf No edit summary current
- 16:4716:47, 23 December 2020 diff hist +14 Approved Materials - Pavement Marking →Preformed Thermoplastic
- 16:4616:46, 23 December 2020 diff hist +987 Approved Materials - Pavement Marking →Preformed Thermoplastic
18 December 2020
- 18:0018:00, 18 December 2020 diff hist +21 Approved Materials - Traffic Signals →CNG Power Cable 1-3c #2AWG
- 17:5417:54, 18 December 2020 diff hist −199 Approved Materials - Traffic Signals →Multi-conductor 7c#14 and 2c#14
- 17:4317:43, 18 December 2020 diff hist +238 Streetlight Design Manual →Pole Locations:
- 12:2212:22, 18 December 2020 diff hist 0 Approved Materials - Specialty Items →Decorative Bases for Pedestrian Poles
- 12:2112:21, 18 December 2020 diff hist +2 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:2012:20, 18 December 2020 diff hist −1 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:1912:19, 18 December 2020 diff hist +61 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:1812:18, 18 December 2020 diff hist +528 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:1712:17, 18 December 2020 diff hist 0 N File:TRF PQL SI CAT Valmont MastArmPoleSterlingBase.pdf No edit summary current
- 12:1612:16, 18 December 2020 diff hist 0 N File:TRF PQL SI CAT Valmont MastArmPoleWashingtonBase.pdf No edit summary current
- 12:1512:15, 18 December 2020 diff hist 0 N File:TRF PQL SI CAT Valmont MastArmPoleContourBase.pdf No edit summary current
- 12:1112:11, 18 December 2020 diff hist 0 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
16 December 2020
- 17:1017:10, 16 December 2020 diff hist +2 Approved Materials - Traffic Signals →Multi-conductor 7c#14 and 2c#14
- 17:1017:10, 16 December 2020 diff hist 0 N File:TRF PQL TS CAT Belden MultiConductorSignalCable2c.pdf No edit summary current
- 17:0917:09, 16 December 2020 diff hist 0 N File:TRF PQL TS CAT Belden MultiConductorSignalCable7c.pdf No edit summary current
- 16:4716:47, 16 December 2020 diff hist −36 Approved Materials - Traffic Signals →Multi-conductor 7c#14 and 2c#14
17 November 2020
- 14:0814:08, 17 November 2020 diff hist −49 Approved Materials - Streetlighting →Multi-tap Connectors
16 November 2020
- 14:1514:15, 16 November 2020 diff hist +259 Pavement Marking Design Manual →Crosswalk and Stop Line Usage
10 November 2020
- 09:2709:27, 10 November 2020 diff hist +56 Approved Materials - Streetlighting →Multi-tap Connectors
- 09:1909:19, 10 November 2020 diff hist +29 Approved Materials - Streetlighting →Multi-tap Connectors
- 09:1709:17, 10 November 2020 diff hist +20 Approved Materials - Streetlighting →Multi-tap Connectors
9 November 2020
- 17:5717:57, 9 November 2020 diff hist +443 Approved Materials - Streetlighting →Multi-tap Connectors
26 October 2020
- 10:1510:15, 26 October 2020 diff hist +182 Pavement Marking Design Manual →Edge Lines on Bridges
- 09:5009:50, 26 October 2020 diff hist −2 Pavement Marking Design Manual →Bicycle Lane Symbols
- 09:4909:49, 26 October 2020 diff hist +9 Pavement Marking Design Manual →Bicycle Lane Symbols
- 09:4809:48, 26 October 2020 diff hist +13 Pavement Marking Design Manual →Bicycle Lane Symbols
- 09:4509:45, 26 October 2020 diff hist +137 Pavement Marking Design Manual →Bicycle Lane Lines
9 October 2020
- 08:4908:49, 9 October 2020 diff hist +129 Streetlight Design Manual →Partial Lighting
- 08:4808:48, 9 October 2020 diff hist +191 Streetlight Design Manual →Partial Lighting
- 08:4508:45, 9 October 2020 diff hist +548 Streetlight Design Manual →Partial Lighting
- 08:4308:43, 9 October 2020 diff hist −440 Streetlight Design Manual → Pavement Classification:
- 08:4208:42, 9 October 2020 diff hist +440 Streetlight Design Manual → Pavement Classification:
- 08:3508:35, 9 October 2020 diff hist +19 Streetlight Design Manual → Pavement Classification:
8 October 2020
- 15:1315:13, 8 October 2020 diff hist 0 File:TRF PQL PS MEM ImpactRecoverySystems ParkingLotSignBollard.pdf Bruce Wacker uploaded a new version of File:TRF PQL PS MEM ImpactRecoverySystems ParkingLotSignBollard.pdf
- 15:0515:05, 8 October 2020 diff hist −64 Approved Materials - Signing →Parking Lot Sign Bollard
- 15:0515:05, 8 October 2020 diff hist 0 Approved Materials - Signing →Parking Lot Sign Bollard
- 15:0415:04, 8 October 2020 diff hist +4 Approved Materials - Signing →Parking Lot Sign Bollard
2 October 2020
- 17:1617:16, 2 October 2020 diff hist −618 Approved Materials - Fiber Optics →Ethernet Switches
- 17:1217:12, 2 October 2020 diff hist 0 File:TRF PQL FO MEM Cisco EthernetSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Cisco EthernetSwitch.pdf
- 17:1117:11, 2 October 2020 diff hist 0 N File:TRF PQL FO CAT Cisco IE3200datasheet.pdf No edit summary current
20 August 2020
- 16:2716:27, 20 August 2020 diff hist 0 Approved Materials - Streetlighting →LED Lamps
- 16:2616:26, 20 August 2020 diff hist 0 File:TRF PQL SL MEM Keystone LEDLamp.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL MEM Keystone LEDLamp.pdf
- 16:2616:26, 20 August 2020 diff hist 0 File:TRF PQL SL CAT Keystone LEDLamp.pdf Bruce Wacker uploaded a new version of File:TRF PQL SL CAT Keystone LEDLamp.pdf
19 August 2020
- 13:2113:21, 19 August 2020 diff hist −38 Approved Materials - Traffic Signals →Multi-conductor 7c#14 and 2c#14
- 13:2013:20, 19 August 2020 diff hist −139 Approved Materials - Traffic Signals →CNG Power Cable 1-3c #2AWG
13 August 2020
- 10:2210:22, 13 August 2020 diff hist +56 Approved Materials - ITS →CCTV Camera Equipment
- 10:2110:21, 13 August 2020 diff hist 0 File:TRF PQL ITS MEM Panasonic MountingBracket.pdf Bruce Wacker uploaded a new version of File:TRF PQL ITS MEM Panasonic MountingBracket.pdf current
- 10:1710:17, 13 August 2020 diff hist +56 Approved Materials - ITS →CCTV Camera Mounting Bracket
- 10:1710:17, 13 August 2020 diff hist 0 N File:TRF PQL ITS MEM Panasonic MountingBracket.pdf No edit summary
- 10:1110:11, 13 August 2020 diff hist +147 Approved Materials - ITS →CCTV Camera Mounting Bracket
- 10:1010:10, 13 August 2020 diff hist 0 N File:TRF PQL ITS CAT Panasonic PoleMountAdapter.pdf No edit summary current
- 10:1010:10, 13 August 2020 diff hist 0 N File:TRF PQL ITS CAT Panasonic MountingBracket.pdf No edit summary current
- 10:0710:07, 13 August 2020 diff hist +50 Approved Materials - ITS →CCTV Camera
- 10:0710:07, 13 August 2020 diff hist 0 N File:TRF PQL ITS CAT Trendnet PoEInjector.pdf No edit summary current
- 10:0610:06, 13 August 2020 diff hist +92 Approved Materials - ITS →CCTV Camera Mounting Bracket
- 10:0510:05, 13 August 2020 diff hist +250 Approved Materials - ITS →CCTV Camera
- 10:0410:04, 13 August 2020 diff hist 0 N File:TRF PQL ITS CAT Panasonic CCTVCamera.pdf No edit summary current
12 August 2020
- 17:1217:12, 12 August 2020 diff hist 0 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 17:1217:12, 12 August 2020 diff hist +68 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 17:1117:11, 12 August 2020 diff hist 0 N File:TRF PQL TS PHOT PDC LoadSwitch Side.jpg No edit summary current
- 08:3208:32, 12 August 2020 diff hist +50 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 08:3208:32, 12 August 2020 diff hist 0 N File:TRF PQL TS PHOT PDC LoadSwitch.jpg No edit summary current
- 08:3008:30, 12 August 2020 diff hist +67 Approved Materials - Traffic Signals →Flash Transfer Relay
- 08:3008:30, 12 August 2020 diff hist 0 N File:TRF PQL TS PHOT Reno FlashTransferRelay Back.jpg No edit summary current
- 08:2808:28, 12 August 2020 diff hist +58 Approved Materials - Traffic Signals →Flash Transfer Relay
- 08:2808:28, 12 August 2020 diff hist 0 N File:TRF PQL TS PHOT Reno FlashTransferRelay.jpg No edit summary current
- 08:2608:26, 12 August 2020 diff hist +69 Approved Materials - Traffic Signals →Flash Transfer Relay
- 08:2408:24, 12 August 2020 diff hist 0 N File:TRF PQL TS PHOT Struthers-Dunn FlashTransferRelay.jpg No edit summary current
11 August 2020
- 17:0017:00, 11 August 2020 diff hist +16 Approved Materials - Traffic Signals →Flash Transfer Relay
- 16:5916:59, 11 August 2020 diff hist +16 Approved Materials - Traffic Signals →Vehicle Detectors (Loops)
- 16:5916:59, 11 August 2020 diff hist +16 Approved Materials - Traffic Signals →Pre-formed Detector Loop
- 16:5816:58, 11 August 2020 diff hist +16 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 16:5716:57, 11 August 2020 diff hist +16 Approved Materials - Traffic Signals →Flasher Unit
- 16:3916:39, 11 August 2020 diff hist −169 Approved Materials - Traffic Signals →Switchpack / Load Switch
10 August 2020
- 14:5614:56, 10 August 2020 diff hist +2 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 14:5614:56, 10 August 2020 diff hist 0 File:TRF PQL TS CAT PDC LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT PDC LoadSwitch.pdf current
- 14:5614:56, 10 August 2020 diff hist 0 File:TRF PQL TS MEM PDC LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM PDC LoadSwitch.pdf current
- 14:5214:52, 10 August 2020 diff hist 0 File:TRF PQL TS CAT GDI LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT GDI LoadSwitch.pdf current
- 14:4914:49, 10 August 2020 diff hist 0 File:TRF PQL TS MEM GDI LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS MEM GDI LoadSwitch.pdf current
- 14:4514:45, 10 August 2020 diff hist 0 File:TRF PQL TS CAT GDI LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT GDI LoadSwitch.pdf
- 14:4214:42, 10 August 2020 diff hist +33 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 14:4114:41, 10 August 2020 diff hist +2 Approved Materials - Traffic Signals →Switchpack / Load Switch
- 14:3514:35, 10 August 2020 diff hist 0 File:TRF PQL TS CAT Reno FlasherUnit.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT Reno FlasherUnit.pdf current
- 13:5413:54, 10 August 2020 diff hist 0 File:TRF PQL TS CAT Reno LoadSwitch.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT Reno LoadSwitch.pdf current
- 13:4613:46, 10 August 2020 diff hist +21 Approved Materials - Traffic Signals →Flasher Unit
- 13:4613:46, 10 August 2020 diff hist +18 Approved Materials - Traffic Signals →Pre-formed Detector Loop
- 13:4513:45, 10 August 2020 diff hist +20 Approved Materials - Traffic Signals →Flash Transfer Relay
6 August 2020
- 13:4913:49, 6 August 2020 diff hist +11 Approved Materials - Traffic Signals →Power Distribution Assembly (PDA)
- 13:3713:37, 6 August 2020 diff hist −230 Approved Materials - Traffic Signals →Flash Transfer Relay
- 09:4909:49, 6 August 2020 diff hist +4 Approved Materials - Traffic Signals →Flash Transfer Relay
- 09:4809:48, 6 August 2020 diff hist 0 N File:TRF PQL TS MEM Struthers-Dunn FlashTransferRelay.pdf No edit summary current
- 09:3909:39, 6 August 2020 diff hist +101 Approved Materials - Traffic Signals →Flash Transfer Relay
- 09:3809:38, 6 August 2020 diff hist 0 N File:TRF PQL TS CAT Struthers-Dunn FlashTransferRelay.pdf No edit summary current
30 July 2020
- 09:5509:55, 30 July 2020 diff hist +458 Approved Materials - Signing →Blank-Out Signs
- 09:5409:54, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign SignFace.JPG No edit summary current
- 09:5409:54, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign Label.JPG No edit summary current
- 09:5309:53, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign InsideBack.JPG No edit summary current
- 09:5209:52, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign Hasps.JPG No edit summary current
- 09:5209:52, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign Gasket.JPG No edit summary current
- 09:5009:50, 30 July 2020 diff hist 0 N File:TRF PQL PS PHOT SignalTech BlankoutSign Drivers.JPG No edit summary current
- 09:2609:26, 30 July 2020 diff hist +53 Approved Materials - Signing →Blank-Out Signs
- 09:2609:26, 30 July 2020 diff hist 0 N File:TRF PQL PS MEM SignalTech BlankoutSign.pdf No edit summary current
- 09:1609:16, 30 July 2020 diff hist 0 Approved Materials - Signing →Blank-Out Signs
- 09:1609:16, 30 July 2020 diff hist +128 Approved Materials - Signing →Blank-Out Signs
- 09:1509:15, 30 July 2020 diff hist 0 N File:TRF PQL PS CAT SignalTech BlankoutSign.pdf No edit summary current
21 July 2020
- 13:4513:45, 21 July 2020 diff hist +85 Approved Materials - Traffic Signals →Video Detection Systems
- 13:4413:44, 21 July 2020 diff hist 0 N File:TRF PQL TS CAT Gridsmart MountingBracket.pdf No edit summary current
26 June 2020
- 16:5016:50, 26 June 2020 diff hist +1 Approved Materials - Specialty Items →Residential Streetlight Small Cell Pole Adapter Arm
- 16:4916:49, 26 June 2020 diff hist +831 Approved Materials - Specialty Items →Streetlighting Speciality Items
- 16:4816:48, 26 June 2020 diff hist 0 N File:TRF PQL SI MEM Sentry SmallPoleArmAdapterArm.pdf No edit summary current
- 16:4116:41, 26 June 2020 diff hist 0 N File:TRF PQL SI CAT Sentry SmallPoleArmAdapterArm.pdf No edit summary current
5 June 2020
- 16:3616:36, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 8inchSpliceEnclosure.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 8inchSpliceEnclosure.pdf current
- 16:3016:30, 5 June 2020 diff hist 0 Approved Materials - Fiber Optics →Splice Enclosures
- 16:3016:30, 5 June 2020 diff hist 0 N File:TRF PQL FO MEM Tyco SpliceEnclosure.pdf No edit summary current
- 16:2816:28, 5 June 2020 diff hist +46 Approved Materials - Fiber Optics →Splice Enclosures
- 16:2116:21, 5 June 2020 diff hist 0 File:TRF PQL FO MEM Corning LooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning LooseTubeCable.pdf current
- 16:2016:20, 5 June 2020 diff hist 0 File:TRF PQL FO MEM Corning RiserCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning RiserCable.pdf current
- 16:1316:13, 5 June 2020 diff hist 0 File:TRF PQL FO MEM Corning RiserCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning RiserCable.pdf
- 16:1116:11, 5 June 2020 diff hist −1 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 16:1116:11, 5 June 2020 diff hist +4 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 16:1016:10, 5 June 2020 diff hist −1 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 15:5915:59, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 48CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 48CtLooseTubeCable.pdf current
- 15:5115:51, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 72CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 72CtLooseTubeCable.pdf current
- 15:5015:50, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 48CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 48CtLooseTubeCable.pdf
- 15:5015:50, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 36CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 36CtLooseTubeCable.pdf current
- 15:4915:49, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 24CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 24CtLooseTubeCable.pdf current
- 15:4915:49, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 12CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 12CtLooseTubeCable.pdf current
- 15:4515:45, 5 June 2020 diff hist −56 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 15:4015:40, 5 June 2020 diff hist 0 File:TRF PQL FO CAT Corning 144CtLooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO CAT Corning 144CtLooseTubeCable.pdf current
- 15:3715:37, 5 June 2020 diff hist +59 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 15:3615:36, 5 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning FastActLooseTubeCable.pdf No edit summary current
- 15:3315:33, 5 June 2020 diff hist +87 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 11:5711:57, 5 June 2020 diff hist +13 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 11:5511:55, 5 June 2020 diff hist +5 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 11:5411:54, 5 June 2020 diff hist +171 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 11:5311:53, 5 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 24CtRiserCable.pdf No edit summary current
- 11:5211:52, 5 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 12CtRiserCable.pdf No edit summary current
- 11:3411:34, 5 June 2020 diff hist 0 File:TRF PQL FO MEM Corning PlenumCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning PlenumCable.pdf current
- 10:5410:54, 5 June 2020 diff hist 0 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 10:5210:52, 5 June 2020 diff hist +1 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 10:5110:51, 5 June 2020 diff hist −26 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 10:5010:50, 5 June 2020 diff hist −79 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 10:4910:49, 5 June 2020 diff hist +1 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 10:4810:48, 5 June 2020 diff hist +78 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 10:4610:46, 5 June 2020 diff hist −1 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 10:4310:43, 5 June 2020 diff hist −86 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 10:3710:37, 5 June 2020 diff hist 0 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 10:3110:31, 5 June 2020 diff hist +2 Approved Materials - Fiber Optics →Splice Enclosures
- 10:3110:31, 5 June 2020 diff hist +6 Approved Materials - Fiber Optics →Splice Enclosures
- 10:2810:28, 5 June 2020 diff hist −60 Approved Materials - Fiber Optics →Splice Enclosures
- 10:2710:27, 5 June 2020 diff hist −1 Approved Materials - Fiber Optics →Splice Enclosures
2 June 2020
- 15:3515:35, 2 June 2020 diff hist 0 File:TRF PQL FO MEM Corning LooseTubeCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning LooseTubeCable.pdf
- 15:2515:25, 2 June 2020 diff hist 0 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
1 June 2020
- 14:5414:54, 1 June 2020 diff hist 0 File:TRF PQL FO MEM Corning PlenumCable.pdf Bruce Wacker uploaded a new version of File:TRF PQL FO MEM Corning PlenumCable.pdf
- 14:5214:52, 1 June 2020 diff hist +48 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 14:5114:51, 1 June 2020 diff hist 0 N File:TRF PQL FO MEM Corning RiserCable.pdf No edit summary
- 14:4814:48, 1 June 2020 diff hist +120 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 14:4814:48, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 36to144-CtRiserCable.pdf No edit summary current
- 14:4714:47, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 2to24-CtRiserCable.pdf No edit summary current
- 14:4614:46, 1 June 2020 diff hist +212 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 14:2414:24, 1 June 2020 diff hist +3 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 14:2414:24, 1 June 2020 diff hist +140 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 14:2414:24, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 36to144-CtPlenumCable.pdf No edit summary current
- 14:2214:22, 1 June 2020 diff hist +131 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 14:2014:20, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 2to24-CtPlenumCable.pdf No edit summary current
- 14:1914:19, 1 June 2020 diff hist +49 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 14:1814:18, 1 June 2020 diff hist 0 N File:TRF PQL FO MEM Corning PlenumCable.pdf No edit summary
- 14:0214:02, 1 June 2020 diff hist +275 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 14:0214:02, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 6-CtPlenumCable.pdf No edit summary current
- 14:0114:01, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 12-CtPlenumCable.pdf No edit summary current
- 14:0114:01, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 24-CtPlenumCable.pdf No edit summary current
- 14:0014:00, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 72-CtPlenumCable.pdf No edit summary current
- 13:5913:59, 1 June 2020 diff hist 0 N File:TRF PQL FO CAT Corning 96-CtPlenumCable.pdf No edit summary current
- 13:4513:45, 1 June 2020 diff hist +54 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 13:1113:11, 1 June 2020 diff hist +27 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 13:0913:09, 1 June 2020 diff hist +27 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 13:0813:08, 1 June 2020 diff hist +21 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 11:5911:59, 1 June 2020 diff hist +2 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
- 11:5911:59, 1 June 2020 diff hist −233 Approved Materials - Fiber Optics →Fiber Optic Riser Cable
- 11:5911:59, 1 June 2020 diff hist −238 Approved Materials - Fiber Optics →Fiber Optic Plenum Cable
20 May 2020
- 14:5614:56, 20 May 2020 diff hist +802 Approved Materials - Traffic Signals →Video Detection Systems
- 14:5514:55, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem CableHarnessEnd.JPG No edit summary current
- 14:5414:54, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem RJ45Connector.JPG No edit summary current
- 14:5314:53, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem ProcessorFrontClosed.JPG No edit summary current
- 14:5214:52, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem JunctionBoxInterior.JPG No edit summary current
- 14:5114:51, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem CameraConnection.JPG No edit summary current
- 14:5014:50, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem PoleAssembly.JPG No edit summary current
- 14:4914:49, 20 May 2020 diff hist 0 N File:TRF PQL TS PHOT Gridsmart VideoDetectionSystem CameraSideView.JPG No edit summary current
- 14:4814:48, 20 May 2020 diff hist 0 N File:TRF PQL TS TS CAT Gridsmart SDLCCable.pdf No edit summary current
- 12:0712:07, 20 May 2020 diff hist +1 Approved Materials - Traffic Signals →Video Detection Systems
- 12:0712:07, 20 May 2020 diff hist +105 Approved Materials - Traffic Signals →Video Detection Systems
- 12:0612:06, 20 May 2020 diff hist 0 File:TRF PQL TS CAT Gridsmart FisheyeCamera.pdf Bruce Wacker uploaded a new version of File:TRF PQL TS CAT Gridsmart FisheyeCamera.pdf current
- 12:0612:06, 20 May 2020 diff hist 0 N File:TRF PQL TS CAT Gridsmart FisheyeCameraAssembly.pdf No edit summary current
- 11:5311:53, 20 May 2020 diff hist +12 Approved Materials - Traffic Signals →Video Detection Systems
- 11:5211:52, 20 May 2020 diff hist 0 Approved Materials - Traffic Signals →Video Detection Systems
- 11:5111:51, 20 May 2020 diff hist +152 Approved Materials - Traffic Signals →Video Detection Systems
- 11:5011:50, 20 May 2020 diff hist 0 N File:TRF PQL TS CAT Gridsmart Processor.pdf No edit summary current
- 11:4811:48, 20 May 2020 diff hist 0 N File:TRF PQL TS CAT Gridsmart FisheyeCamera.pdf No edit summary
- 11:0211:02, 20 May 2020 diff hist +110 Approved Materials - Traffic Signals →Video Detection Systems
11 May 2020
- 17:2217:22, 11 May 2020 diff hist +4 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 17:2217:22, 11 May 2020 diff hist +15 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 17:2017:20, 11 May 2020 diff hist +154 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 17:1917:19, 11 May 2020 diff hist 0 N File:TRF PQL FO PHOT Corning TerminationDropCablePigtail.JPG No edit summary current
- 17:1817:18, 11 May 2020 diff hist 0 N File:TRF PQL FO CAT Corning TerminationDropCablePigtail.pdf No edit summary current
- 16:5116:51, 11 May 2020 diff hist +58 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 16:5116:51, 11 May 2020 diff hist 0 N File:TRF PQL FO MEM Corning TerminationDropCable.pdf No edit summary
- 16:4516:45, 11 May 2020 diff hist +229 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 16:4416:44, 11 May 2020 diff hist 0 N File:TRF PQL FO PHOT Corning CableHarnessConnector.JPG No edit summary current
- 16:4416:44, 11 May 2020 diff hist 0 N File:TRF PQL FO PHOT Corning CableHarness.JPG No edit summary current
- 16:4316:43, 11 May 2020 diff hist 0 N File:TRF PQL FO PHOT Corning IntegratedPanelHousing.JPG No edit summary current
- 16:4216:42, 11 May 2020 diff hist +30 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 15:2915:29, 11 May 2020 diff hist +110 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 15:2815:28, 11 May 2020 diff hist 0 N File:TRF PQL FO CAT Corning CableHarness.pdf No edit summary current
- 15:2715:27, 11 May 2020 diff hist 0 N File:TRF PQL FO CAT Corning IntegratedPanelHousing.pdf No edit summary current
- 15:2015:20, 11 May 2020 diff hist +8 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 15:1915:19, 11 May 2020 diff hist −2 Approved Materials - Fiber Optics →Termination Drop Cable Assemblies
- 15:1815:18, 11 May 2020 diff hist +19 Approved Materials - Fiber Optics →Termination Drop Cables
- 15:0915:09, 11 May 2020 diff hist 0 Approved Materials - Fiber Optics →Termination Drop Cables
- 15:0915:09, 11 May 2020 diff hist +119 Approved Materials - Fiber Optics →Termination Drop Cables
- 14:5114:51, 11 May 2020 diff hist +7 Approved Materials - Fiber Optics →Termination Drop Cables
- 14:5114:51, 11 May 2020 diff hist −2 Approved Materials - Fiber Optics →Termination Drop Cables
- 14:5114:51, 11 May 2020 diff hist +76 Approved Materials - Fiber Optics →Termination Drop Cables
- 14:4714:47, 11 May 2020 diff hist +10 Approved Materials - Fiber Optics →Termination Drop Cables
- 14:4514:45, 11 May 2020 diff hist −1,045 Approved Materials - Fiber Optics →Termination Drop Cables
22 April 2020
- 15:1915:19, 22 April 2020 diff hist 0 N File:TRF PQL SL DWG Pieresearch SupportBoots.pdf No edit summary current
- 15:1915:19, 22 April 2020 diff hist 0 N File:TRF PQL SL DWG Pieresearch DrillShaftWheels.pdf No edit summary current
- 15:1315:13, 22 April 2020 diff hist 0 N File:TRF PQL SL MEM RebarSupportProducts RebarSupportSpacers.pdf No edit summary
- 15:1315:13, 22 April 2020 diff hist 0 N File:TRF PQL SL CAT RebarSupportProducts SupportBoots.pdf No edit summary current
- 15:1215:12, 22 April 2020 diff hist 0 N File:TRF PQL SL CAT RebarSupportProducts DrillShaftWheels.pdf No edit summary current
- 15:1215:12, 22 April 2020 diff hist 0 Approved Materials - Streetlighting →Rebar Support Products
- 15:0915:09, 22 April 2020 diff hist 0 N File:TRF PQL SL MEM Pieresearch RebarSupportSpacers.pdf No edit summary
- 15:0915:09, 22 April 2020 diff hist 0 N File:TRF PQL SL CAT Pieresearch SupportBoots.pdf No edit summary current
- 15:0815:08, 22 April 2020 diff hist 0 N File:TRF PQL SL CAT Pieresearch DrillShaftWheels.pdf No edit summary current
- 15:0015:00, 22 April 2020 diff hist −24 Approved Materials - Streetlighting →Support Spacers
- 14:5714:57, 22 April 2020 diff hist 0 Approved Materials - Streetlighting →Support Spacers
- 14:5614:56, 22 April 2020 diff hist 0 Approved Materials - Streetlighting →Rebar Support Products
- 14:5214:52, 22 April 2020 diff hist +71 Approved Materials - Streetlighting →Support Spacers
- 14:5014:50, 22 April 2020 diff hist +1,372 Approved Materials - Streetlighting →Screw-In Pole Foundations
17 April 2020
- 13:1213:12, 17 April 2020 diff hist +158 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 13:1213:12, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 144CtLooseTubeCable.pdf No edit summary
- 13:1113:11, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 96CtLooseTubeCable.pdf No edit summary current
- 13:1013:10, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 72CtLooseTubeCable.pdf No edit summary
- 13:1013:10, 17 April 2020 diff hist +290 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 13:0913:09, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 48CtLooseTubeCable.pdf No edit summary
- 13:0813:08, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 36CtLooseTubeCable.pdf No edit summary
- 13:0713:07, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 24CtLooseTubeCable.pdf No edit summary
- 13:0613:06, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 12CtLooseTubeCable.pdf No edit summary
- 13:0513:05, 17 April 2020 diff hist 0 N File:TRF PQL FO CAT Corning 6CtLooseTubeCable.pdf No edit summary current
- 12:0812:08, 17 April 2020 diff hist +96 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 11:5511:55, 17 April 2020 diff hist +13 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 11:5111:51, 17 April 2020 diff hist +2 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 11:5011:50, 17 April 2020 diff hist +29 Approved Materials - Fiber Optics →Loose Tube Fiber Optic Cable
- 11:4111:41, 17 April 2020 diff hist −2 Approved Materials - Fiber Optics →Splice Enclosures
- 11:3411:34, 17 April 2020 diff hist +14 Approved Materials - Fiber Optics →Splice Enclosures
15 April 2020
- 10:5910:59, 15 April 2020 diff hist +4 Approved Materials - Pavement Marking →Thermoplastic
- 10:5910:59, 15 April 2020 diff hist +41 Approved Materials - Pavement Marking →Thermoplastic
- 08:5608:56, 15 April 2020 diff hist +58 Approved Materials - Pavement Marking →Thermoplastic
- 08:5608:56, 15 April 2020 diff hist 0 N File:TRF PQL PM MEM OzarkMaterials Thermoplastic.pdf No edit summary current
- 08:4708:47, 15 April 2020 diff hist +151 Approved Materials - Pavement Marking →Thermoplastic
- 08:4708:47, 15 April 2020 diff hist 0 N File:TRF PQL PM CAT OzarkMaterials Thermoplastic.pdf No edit summary current
10 April 2020
- 11:5811:58, 10 April 2020 diff hist +125 Streetlight Design Manual →Luminaire Selection:
- 11:5311:53, 10 April 2020 diff hist +88 Streetlight Design Manual →Luminaire Selection:
- 11:3911:39, 10 April 2020 diff hist 0 Streetlight Design Manual 4/10/20 - Added a Note under Luminaire Selection that the American Electric Lighting Autobahn fixture should be used for all design calculations.