File list

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size User Description Versions
14:44, 28 September 2020 Project Cost Memo.pdf (file) 58 KB Irina Idelson Project Cost Estimate memo 1
09:20, 25 September 2020 TRF PQL PS MEM Trinity SignPostSleeve.pdf (file) 125 KB Brian Geiger File uploaded with MsUpload 1
09:18, 25 September 2020 TRF PQL PS MEM Trinity SignPostAnchor.pdf (file) 124 KB Brian Geiger File uploaded with MsUpload 1
14:26, 24 September 2020 TRF PQL PS MEM Trinity SignPost.pdf (file) 123 KB Brian Geiger File uploaded with MsUpload 2
14:23, 24 September 2020 TRF PQL PS CAT Trinity SignPost.pdf (file) 1.95 MB Brian Geiger File uploaded with MsUpload 1
11:15, 24 September 2020 TRF PQL PS MEM XcessoriesSquared SquareToRoundAdapter.pdf (file) 124 KB Brian Geiger File uploaded with MsUpload 1
11:15, 24 September 2020 TRF PQL PS CAT XcessoriesSquared SquareToRoundAdapter.pdf (file) 178 KB Brian Geiger File uploaded with MsUpload 1
08:53, 21 September 2020 II-26 KCPL Account Setup Form - Traffic Signal.pdf (file) 144 KB Joe Archer KCPL Account Setup Form - Traffic Signal, changed to Evergy 4
08:53, 21 September 2020 II-26 KCPL Account Setup Form - Streetlighting.pdf (file) 144 KB Joe Archer KCPL Account Setup Form - Streetlighting, changed to Evergy 5
13:51, 31 August 2020 Sec301.pdf (file) 263 KB Joe Archer SUBGRADE CONSTRUCTION 2
13:50, 31 August 2020 Sec205.pdf (file) 260 KB Joe Archer EXCAVATION 4
11:32, 31 August 2020 Sec619.pdf (file) 242 KB Joe Archer ASPHALTIC PATCHING / PARTIAL DEPTH PATCHING 2
11:23, 31 August 2020 Sec915.pdf (file) 246 KB Joe Archer LAWN SPRINKLER SYSTEM REPAIR 1
08:43, 31 August 2020 III-11-1 Agreement.docx (file) 22 KB Irina Idelson Reverted to version as of 13:42, 5 September 2012 (CDT) 2
08:39, 31 August 2020 III-11a-6 Notice to Bidders (hard copy bids).docx (file) 21 KB Irina Idelson Notice to Bidders for Hard Copy Bids 1
08:26, 31 August 2020 III-11a-10b Table of Contents CDBG.docx (file) 21 KB Irina Idelson Table of Contents_CDBG 2
08:21, 31 August 2020 III-11a-10 Table of Contents.docx (file) 19 KB Irina Idelson Table of Contents 1
08:20, 31 August 2020 III-11a-9 Statutory Bond.docx (file) 22 KB Irina Idelson Statutory Bond 2
08:17, 31 August 2020 III-11a-8a Maintenance Bond.docx (file) 20 KB Irina Idelson Maintenance Bond 3
08:14, 31 August 2020 III-11a-8 Performance Bond.docx (file) 34 KB Irina Idelson Performance Bond 1
08:12, 31 August 2020 III-11a-7 Labor and Material Payment Bond.docx (file) 23 KB Irina Idelson Labor and Material Payment Bond 1
08:06, 31 August 2020 III-11a-2 Bid - use for hard copy bids.docx (file) 20 KB Irina Idelson Bid 1
07:44, 31 August 2020 III-11a-1 Agreement.docx (file) 22 KB Irina Idelson Agreement 2
17:08, 28 August 2020 Sec863.pdf (file) 246 KB Joe Archer SERVICE WATER LINE RELOCATION 1
16:51, 28 August 2020 Sec908.pdf (file) 361 KB Joe Archer TREE AND SHRUB PLANTING AND MAINTENANCE 1
16:44, 28 August 2020 Sec617.pdf (file) 274 KB Joe Archer METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED) 2
16:38, 28 August 2020 Sec613.pdf (file) 658 KB Joe Archer ULTRATHIN BONDED ASPHALT SURFACE (UBAS) 1
16:25, 28 August 2020 Sec886.pdf (file) 246 KB Joe Archer PRIVATE DRAINAGE SYSTEM CONNECTION 1
16:14, 28 August 2020 Sec884.pdf (file) 338 KB Joe Archer CONCRETE PATCHING 1
16:05, 28 August 2020 Sec401.pdf (file) 343 KB Joe Archer CONCRETE CONSTRUCTION 3
15:50, 28 August 2020 Sec866.pdf (file) 100 KB Joe Archer SANITARY SEWER ENCASEMENT 2
11:48, 28 August 2020 Sec818.pdf (file) 346 KB Joe Archer HDPE STORM SEWERS (PRIVATE) 1
11:37, 28 August 2020 Sec817.pdf (file) 386 KB Joe Archer STORM SEWERS 2
15:22, 25 August 2020 TRF PQL TS MEM Polara iN3Wire 3-WirePushButtonStation.pdf (file) 128 KB Brian Geiger File uploaded with MsUpload 1
15:09, 25 August 2020 TRF PQL TS CAT Polara iN3Wire DualMountsFlexible.pdf (file) 1 MB Brian Geiger File uploaded with MsUpload 1
15:07, 25 August 2020 TRF PQL TS CAT Polara Bulldog DualMountsFlexible.pdf (file) 1 MB Brian Geiger File uploaded with MsUpload 1
11:46, 18 August 2020 VI-1d project close out SMAC.docx (file) 46 KB Irina Idelson Project Close Out Form - SMAC 1
10:21, 13 August 2020 TRF PQL ITS MEM Panasonic MountingBracket.pdf (file) 85 KB Bruce Wacker   2
10:10, 13 August 2020 TRF PQL ITS CAT Panasonic PoleMountAdapter.pdf (file) 281 KB Bruce Wacker   1
10:10, 13 August 2020 TRF PQL ITS CAT Panasonic MountingBracket.pdf (file) 318 KB Bruce Wacker   1
10:07, 13 August 2020 TRF PQL ITS CAT Trendnet PoEInjector.pdf (file) 832 KB Bruce Wacker   1
10:04, 13 August 2020 TRF PQL ITS CAT Panasonic CCTVCamera.pdf (file) 424 KB Bruce Wacker   1
17:11, 12 August 2020 TRF PQL TS PHOT PDC LoadSwitch Side.jpg (file) 2.94 MB Bruce Wacker   1
08:32, 12 August 2020 TRF PQL TS PHOT PDC LoadSwitch.jpg (file) 2.41 MB Bruce Wacker   1
08:30, 12 August 2020 TRF PQL TS PHOT Reno FlashTransferRelay Back.jpg (file) 185 KB Bruce Wacker   1
08:28, 12 August 2020 TRF PQL TS PHOT Reno FlashTransferRelay.jpg (file) 187 KB Bruce Wacker   1
08:24, 12 August 2020 TRF PQL TS PHOT Struthers-Dunn FlashTransferRelay.jpg (file) 2.07 MB Bruce Wacker   1
14:56, 10 August 2020 TRF PQL TS CAT PDC LoadSwitch.pdf (file) 247 KB Bruce Wacker   2
14:56, 10 August 2020 TRF PQL TS MEM PDC LoadSwitch.pdf (file) 79 KB Bruce Wacker   2
14:52, 10 August 2020 TRF PQL TS CAT GDI LoadSwitch.pdf (file) 44 KB Bruce Wacker   3
First pagePrevious pageNext pageLast page