- 11:57, 1 July 2019 diff hist 0 Phase I - Vision →Task 4 - Obtain City Council Approval-Preliminary Plans
- 11:39, 1 July 2019 diff hist 0 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 11:28, 1 July 2019 diff hist +452 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 08:42, 1 July 2019 diff hist −126 Phase I - Vision →Task 1 - Prepare Preliminary Engineering Study/Cost Estimate
- 08:39, 1 July 2019 diff hist +3 Phase I - Vision →Task 1 - Prepare Preliminary Engineering Study/Cost Estimate
- 08:32, 1 July 2019 diff hist +206 Phase I - Vision →Task 1 - Prepare Preliminary Engineering Study/Cost Estimate
- 08:21, 28 June 2019 diff hist +2 Phase I - Vision →Task 1 - Prepare Preliminary Engineering Study/Cost Estimate
- 08:19, 28 June 2019 diff hist +1 Phase I - Vision →Introduction
- 08:17, 28 June 2019 diff hist +12 Phase I - Vision
- 07:37, 28 June 2019 diff hist −1 References current
- 07:36, 28 June 2019 diff hist 0 References
- 07:31, 28 June 2019 diff hist +17 References
- 17:01, 27 June 2019 diff hist +1 List of Initials and Acronyms →Acronyms current
- 16:00, 27 June 2019 diff hist −14 List of Initials and Acronyms →Acronyms
- 15:59, 27 June 2019 diff hist −20 List of Initials and Acronyms →Acronyms
- 15:48, 25 June 2019 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of "File:IV-5j.docx"
- 15:47, 25 June 2019 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of "File:IV-5c.docx"
- 15:46, 25 June 2019 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of "File:IV-5b.docx"
- 15:45, 25 June 2019 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of "File:IV-5a.docx"
- 11:09, 6 May 2019 diff hist 0 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 11:07, 6 May 2019 diff hist +3 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:22, 17 April 2019 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of "File:IV-5f.docx"
- 13:21, 17 April 2019 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of "File:IV-5f.docx"
- 13:19, 17 April 2019 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of "File:IV-5e.docx"
- 10:12, 17 April 2019 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of "File:IV-5f.docx"
- 10:11, 17 April 2019 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of "File:IV-5e.docx"
- 15:34, 10 April 2019 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of "File:IV-5j.docx"
- 15:32, 10 April 2019 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of "File:IV-5i.docx"
- 15:30, 10 April 2019 diff hist 0 File:IV-5h.docx Irina Idelson uploaded a new version of "File:IV-5h.docx"
- 15:29, 10 April 2019 diff hist 0 File:IV-5g.docx Irina Idelson uploaded a new version of "File:IV-5g.docx"
- 08:23, 10 April 2019 diff hist 0 File:IV-5d.docx Irina Idelson uploaded a new version of "File:IV-5d.docx"
- 08:22, 10 April 2019 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of "File:IV-5c.docx"
- 08:19, 10 April 2019 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of "File:IV-5b.docx"
- 08:16, 10 April 2019 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of "File:IV-5a.docx"
- 16:56, 9 April 2019 diff hist 0 File:IV-2a.docx Irina Idelson uploaded a new version of "File:IV-2a.docx"
- 16:54, 9 April 2019 diff hist 0 File:IV-2a.docx Irina Idelson uploaded a new version of "File:IV-2a.docx"
- 09:50, 9 April 2019 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 15:06, 28 March 2019 diff hist −91 Main Page →Special Pages
- 15:04, 28 March 2019 diff hist +17 Approved Materials
- 14:58, 28 March 2019 diff hist +284 N Template:Traffic Materials Use Created page with "{| style="background:#D4FFFF; color:#0000FF" border="0 "cellpadding="5" width="100%" |- |60px||<font face="Georgia"><i>Traffic Items Materials: '''Only..." current
- 14:38, 28 March 2019 diff hist +268 Approved Materials
- 14:30, 28 March 2019 diff hist +288 Approved Materials
- 12:33, 28 March 2019 diff hist +90 Approved Materials
- 11:41, 28 March 2019 diff hist +164 Approved Materials
- 14:04, 27 March 2019 diff hist +1 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 14:03, 27 March 2019 diff hist +21 N File:Restoration Agreement template 08.02.2017.docx Restoration Agreement current
- 14:01, 27 March 2019 diff hist 0 File:Restoration Agreement template 08.02.2017.doc Irina Idelson uploaded a new version of "File:Restoration Agreement template 08.02.2017.doc" current
- 11:24, 27 March 2019 diff hist −8 Approved Materials - Traffic Signals
- 11:23, 27 March 2019 diff hist −14 Approved Materials - Traffic Control
- 11:22, 27 March 2019 diff hist +1 Approved Materials - Fiber Optics
- 11:21, 27 March 2019 diff hist −1 Approved Materials - ITS
- 11:21, 27 March 2019 diff hist −1 Approved Materials - Pavement Marking
- 11:21, 27 March 2019 diff hist −1 Approved Materials - Signing
- 11:20, 27 March 2019 diff hist −13 Approved Materials - Streetlighting
- 11:19, 27 March 2019 diff hist −74 Approved Materials - Specialty Items
- 11:17, 27 March 2019 diff hist +29 Approved Materials - Signing
- 11:13, 27 March 2019 diff hist +30 Approved Materials - Pavement Marking
- 11:11, 27 March 2019 diff hist +29 Approved Materials - ITS
- 11:08, 27 March 2019 diff hist +10 Template:PQLReturn current
- 11:07, 27 March 2019 diff hist −2 Template:Return to AML current
- 10:58, 27 March 2019 diff hist −41 Approved Materials - Fiber Optics
- 10:46, 27 March 2019 diff hist +262 N Template:Return to AML Created page with "---- {| width="800px" border="0" cellpadding="4" cellspacing="0"; border-collapse: collapse;" |+ | align="right"|'''Approved Materials''' | align="right..."
- 10:34, 27 March 2019 diff hist +71 Approved Materials - Fiber Optics
- 10:26, 27 March 2019 diff hist +3 Approved Materials
- 10:25, 27 March 2019 diff hist +40 N Project Submittal Forms Irina Idelson moved page Project Submittal Forms to Contractor Submittal Forms current
- 10:25, 27 March 2019 diff hist 0 m Contractor Submittal Forms Irina Idelson moved page Project Submittal Forms to Contractor Submittal Forms
- 10:24, 27 March 2019 diff hist −28 Approved Materials - Erosion and Sediment Control →Erosion Control Blanket & Turf Reinforcement Mat
- 10:23, 27 March 2019 diff hist −28 Approved Materials - Guardrail →Wood Posts
- 10:22, 27 March 2019 diff hist −28 Approved Materials - Guardrail →Non-Metallic Offset Blocks for Guardrail
- 10:22, 27 March 2019 diff hist −28 Approved Materials - Guardrail →Deep Beam Guardrail
- 10:21, 27 March 2019 diff hist −56 Approved Materials - Bridge Items
- 10:20, 27 March 2019 diff hist −26 Approved Materials - Concrete Work →Curing Compound
- 09:44, 27 March 2019 diff hist −81 Approved Materials - Signing →Ground Mounted Tubular Delineator
- 09:43, 27 March 2019 diff hist −3 Approved Materials - Signing
- 09:42, 27 March 2019 diff hist −3 Approved Materials - Pavement Marking
- 09:40, 27 March 2019 diff hist +33 Approved Materials - ITS
- 09:34, 27 March 2019 diff hist −36 Approved Materials - ITS
- 09:30, 27 March 2019 diff hist +33 Approved Materials - Fiber Optics
- 09:26, 27 March 2019 diff hist −14 Approved Materials - Erosion and Sediment Control
- 09:22, 27 March 2019 diff hist −8 Approved Materials - Geotextile
- 09:21, 27 March 2019 diff hist −14 Approved Materials - Storm Drainage
- 09:17, 27 March 2019 diff hist −6 Approved Materials - Guardrail
- 09:16, 27 March 2019 diff hist +33 Approved Materials - Bridge Items
- 09:15, 27 March 2019 diff hist +6 Approved Materials - Bridge Items →Abutment Strip Drain
- 09:15, 27 March 2019 diff hist −1 Approved Materials - Bridge Items →Bridge Backwall Protection System
- 09:14, 27 March 2019 diff hist +61 Approved Materials - Bridge Items →Bridge Backwall Protection System
- 09:12, 27 March 2019 diff hist +60 Approved Materials - Bridge Items →Abutment Strip Drain
- 09:10, 27 March 2019 diff hist −15 Approved Materials - Concrete Work
- 09:05, 27 March 2019 diff hist −3 Main Page →Traffic Engineering Information
- 08:59, 27 March 2019 diff hist −33 Approved Materials
- 08:59, 27 March 2019 diff hist +32 N Preapproved Materials Irina Idelson moved page Preapproved Materials to Approved Materials current
- 08:59, 27 March 2019 diff hist 0 m Approved Materials Irina Idelson moved page Preapproved Materials to Approved Materials
- 08:48, 27 March 2019 diff hist −6 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 08:48, 27 March 2019 diff hist +6 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 08:47, 27 March 2019 diff hist +124 Approved Materials - Erosion and Sediment Control →Erosion Control Blanket & Turf Reinforcement Mat
- 08:44, 27 March 2019 diff hist +362 Approved Materials - Erosion and Sediment Control
- 08:41, 27 March 2019 diff hist +63 N Preapproved Materials Sediment Control Irina Idelson moved page Preapproved Materials Sediment Control to Approved Materials - Erosion and Sediment Control current
- 08:41, 27 March 2019 diff hist 0 m Approved Materials - Erosion and Sediment Control Irina Idelson moved page Preapproved Materials Sediment Control to Approved Materials - Erosion and Sediment Control
- 08:23, 27 March 2019 diff hist +111 Approved Materials - Guardrail →Wood Posts
- 08:21, 27 March 2019 diff hist +110 Approved Materials - Guardrail →Non-Metallic Offset Blocks for Guardrail
- 08:19, 27 March 2019 diff hist +111 Approved Materials - Guardrail →Deep Beam Guardrail
- 08:16, 27 March 2019 diff hist +894 Approved Materials - Guardrail →Guardrail Terminal Systems
- 08:14, 27 March 2019 diff hist +44 N Preapproved Materials Guardrail Irina Idelson moved page Preapproved Materials Guardrail to Approved Materials - Guardrail current
- 08:14, 27 March 2019 diff hist 0 m Approved Materials - Guardrail Irina Idelson moved page Preapproved Materials Guardrail to Approved Materials - Guardrail
- 08:04, 27 March 2019 diff hist +45 N Preapproved Materials Geotextile Irina Idelson moved page Preapproved Materials Geotextile to Approved Materials - Geotextile current
- 08:04, 27 March 2019 diff hist 0 m Approved Materials - Geotextile Irina Idelson moved page Preapproved Materials Geotextile to Approved Materials - Geotextile
- 08:02, 27 March 2019 diff hist +49 N Preapproved Materials Storm Drainage Irina Idelson moved page Preapproved Materials Storm Drainage to Approved Materials - Storm Drainage current
- 08:02, 27 March 2019 diff hist 0 m Approved Materials - Storm Drainage Irina Idelson moved page Preapproved Materials Storm Drainage to Approved Materials - Storm Drainage
- 07:59, 27 March 2019 diff hist +56 Approved Materials - Concrete Work →Curing Compound
- 07:57, 27 March 2019 diff hist +48 N Preapproved Materials Concrete Work Irina Idelson moved page Preapproved Materials Concrete Work to Approved Materials - Concrete Work current
- 07:57, 27 March 2019 diff hist 0 m Approved Materials - Concrete Work Irina Idelson moved page Preapproved Materials Concrete Work to Approved Materials - Concrete Work
- 07:53, 27 March 2019 diff hist +47 N Preapproved Materials Bridge Items Irina Idelson moved page Preapproved Materials Bridge Items to Approved Materials - Bridge Items current
- 07:53, 27 March 2019 diff hist 0 m Approved Materials - Bridge Items Irina Idelson moved page Preapproved Materials Bridge Items to Approved Materials - Bridge Items
- 07:46, 27 March 2019 diff hist +50 N Preapproved Materials Traffic Signals Irina Idelson moved page Preapproved Materials Traffic Signals to Approved Materials - Traffic Signals current
- 07:46, 27 March 2019 diff hist 0 m Approved Materials - Traffic Signals Irina Idelson moved page Preapproved Materials Traffic Signals to Approved Materials - Traffic Signals
- 07:43, 27 March 2019 diff hist +50 N Preapproved Materials Traffic Control Irina Idelson moved page Preapproved Materials Traffic Control to Approved Materials - Traffic Control current
- 07:43, 27 March 2019 diff hist 0 m Approved Materials - Traffic Control Irina Idelson moved page Preapproved Materials Traffic Control to Approved Materials - Traffic Control
- 07:41, 27 March 2019 diff hist +49 N Preapproved Materials Streetlighting Irina Idelson moved page Preapproved Materials Streetlighting to Approved Materials - Streetlighting current
- 07:41, 27 March 2019 diff hist 0 m Approved Materials - Streetlighting Irina Idelson moved page Preapproved Materials Streetlighting to Approved Materials - Streetlighting
- 07:39, 27 March 2019 diff hist +42 N Preapproved Materials Signing Irina Idelson moved page Preapproved Materials Signing to Approved Materials - Signing current
- 07:39, 27 March 2019 diff hist 0 m Approved Materials - Signing Irina Idelson moved page Preapproved Materials Signing to Approved Materials - Signing
- 07:37, 27 March 2019 diff hist +51 N Preapproved Materials Pavement Marking Irina Idelson moved page Preapproved Materials Pavement Marking to Approved Materials - Pavement Marking current
- 07:37, 27 March 2019 diff hist 0 m Approved Materials - Pavement Marking Irina Idelson moved page Preapproved Materials Pavement Marking to Approved Materials - Pavement Marking
- 07:30, 27 March 2019 diff hist +38 N Preapproved Materials ITS Irina Idelson moved page Preapproved Materials ITS to Approved Materials - ITS current
- 07:30, 27 March 2019 diff hist 0 m Approved Materials - ITS Irina Idelson moved page Preapproved Materials ITS to Approved Materials - ITS
- 07:28, 27 March 2019 diff hist +47 N Preapproved Materials Fiber Optics Irina Idelson moved page Preapproved Materials Fiber Optics to Approved Materials - Fiber Optics current
- 07:28, 27 March 2019 diff hist 0 m Approved Materials - Fiber Optics Irina Idelson moved page Preapproved Materials Fiber Optics to Approved Materials - Fiber Optics
- 07:19, 27 March 2019 diff hist +50 N Preapproved Materials Specialty Items Irina Idelson moved page Preapproved Materials Specialty Items to Approved Materials - Specialty Items current
- 07:19, 27 March 2019 diff hist 0 m Approved Materials - Specialty Items Irina Idelson moved page Preapproved Materials Specialty Items to Approved Materials - Specialty Items
- 16:46, 26 March 2019 diff hist 0 m Approved Materials -Test Irina Idelson moved page Approved Materials to Approved Materials -Test current
- 16:09, 26 March 2019 diff hist −6 Approved Materials - Traffic Signals
- 15:23, 21 March 2019 diff hist +33 Contractor Submittal Forms
- 15:11, 21 March 2019 diff hist +28 N Category:Approved Materials Created page with "Category: Approved Materials" current
- 08:58, 21 March 2019 diff hist +12 Contractor Submittal Forms →Storm Water
- 08:58, 21 March 2019 diff hist +24 Contractor Submittal Forms →Roadway Materials
- 08:54, 21 March 2019 diff hist −97 Contractor Submittal Forms
- 08:14, 21 March 2019 diff hist +222 Contractor Submittal Forms →Traffic Materials
- 15:22, 20 March 2019 diff hist 0 Approved Materials -Test
- 11:00, 20 March 2019 diff hist +12 N File:Gregory Industries Inc MGS.pdf Catalog Link current
- 10:27, 20 March 2019 diff hist +20 Contractor Submittal Forms →Traffic Materials
- 10:26, 20 March 2019 diff hist +56 Contractor Submittal Forms →Traffic Materials
- 10:17, 20 March 2019 diff hist +1 Contractor Submittal Forms →Traffic Materials
- 10:16, 20 March 2019 diff hist +275 Contractor Submittal Forms →Traffic Materials
- 10:11, 20 March 2019 diff hist +54 Contractor Submittal Forms →Traffic Materials
- 10:08, 20 March 2019 diff hist −50 Contractor Submittal Forms →Traffic Materials
- 09:58, 20 March 2019 diff hist +3 Contractor Submittal Forms →Roadway Materials
- 09:56, 20 March 2019 diff hist 0 Contractor Submittal Forms →Traffic Materials
- 09:52, 20 March 2019 diff hist +63 Contractor Submittal Forms
- 09:49, 20 March 2019 diff hist +104 Contractor Submittal Forms →Traffic Materials
- 09:40, 20 March 2019 diff hist −3 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 09:39, 20 March 2019 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 07:46, 20 March 2019 diff hist −24 Template:PQL-CSF current
- 15:06, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:55, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:29, 19 March 2019 diff hist −2 Approved Materials -Test
- 14:24, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:01, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:00, 19 March 2019 diff hist +24 Template:PQL-CSF
- 13:42, 19 March 2019 diff hist −9 Template:PQL-CSF
- 13:35, 19 March 2019 diff hist −1 Approved Materials -Test
- 13:14, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:55, 19 March 2019 diff hist −9 Template:PQLReturn
- 12:44, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:43, 19 March 2019 diff hist −72 Approved Materials - Fiber Optics
- 12:24, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:20, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:14, 19 March 2019 diff hist −36 Approved Materials -Test
- 10:36, 19 March 2019 diff hist +2 Approved Materials -Test
- 10:34, 19 March 2019 diff hist −1 Approved Materials -Test
- 10:34, 19 March 2019 diff hist −2 Approved Materials -Test
- 11:48, 12 March 2019 diff hist −1 Approved Materials -Test
- 11:47, 12 March 2019 diff hist −1 Approved Materials -Test
- 11:23, 12 March 2019 diff hist +912 Approved Materials -Test
- 11:19, 12 March 2019 diff hist −476 Approved Materials -Test Replaced content with "== Roadway Construction =="
- 15:24, 11 March 2019 diff hist +3 Approved Materials
- 15:22, 11 March 2019 diff hist −3 Approved Materials
- 15:22, 11 March 2019 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 11:37, 4 March 2019 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 12:21, 6 February 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf" current
- 12:20, 6 February 2019 diff hist 0 File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf" current
- 12:18, 6 February 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf" current
- 12:17, 6 February 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf"
- 16:14, 30 January 2019 diff hist +105 Approved Materials - Storm Drainage →Sealants - Manhole
- 16:11, 30 January 2019 diff hist +36 Approved Materials - Storm Drainage →Inlet Frames
- 16:07, 30 January 2019 diff hist +20 Approved Materials - Storm Drainage →Inlet Frames
- 16:06, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Manhole Steps
- 16:06, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Manhole Rings & Lids
- 16:05, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Underdrains
- 16:04, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Underdrains
- 16:04, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Class III Concrete Pipe
- 16:03, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Manhole Rings & Lids
- 16:03, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Manhole Steps
- 16:01, 30 January 2019 diff hist +12 Approved Materials - Guardrail →Deep Beam Guardrail
- 16:00, 30 January 2019 diff hist −40 Approved Materials - Erosion and Sediment Control →Filter Sock
- 15:59, 30 January 2019 diff hist −40 Approved Materials - Erosion and Sediment Control →Biodegradable Logs
- 15:59, 30 January 2019 diff hist −2 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 15:59, 30 January 2019 diff hist −38 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 15:57, 30 January 2019 diff hist 0 Approved Materials - Concrete Work →Curing Compound
- 15:56, 30 January 2019 diff hist 0 Approved Materials - Concrete Work →Curing Compound
- 15:52, 30 January 2019 diff hist −8 Approved Materials - Concrete Work →Expansion Joint Material
- 15:52, 30 January 2019 diff hist +12 Approved Materials - Concrete Work →Median Pavers
- 15:51, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →Pavement Repair
- 15:51, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:50, 30 January 2019 diff hist −32 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:49, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Median Pavers
- 15:49, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →Expansion Joint Material
- 15:48, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Expansion Joint Material
- 15:48, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Curing Compound
- 10:24, 29 January 2019 diff hist 0 Approved Materials - Bridge Items
- 10:02, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf"
- 09:58, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf"
- 09:57, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf"
- 09:54, 28 January 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf"
- 11:32, 10 January 2019 diff hist +91 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:31, 10 January 2019 diff hist +16 N File:Thoroughfare Interim Sections Jan-2019.pdf Interim Sections
- 11:31, 10 January 2019 diff hist +107 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:29, 10 January 2019 diff hist +24 N File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Ultimate 2-lane Sections
- 11:28, 10 January 2019 diff hist +121 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:27, 10 January 2019 diff hist +31 N File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Ultimate 4- and 3-lane Sections
- 11:25, 10 January 2019 diff hist +161 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 17:21, 7 January 2019 diff hist −15 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:31, 7 January 2019 diff hist −285 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:29, 7 January 2019 diff hist −43 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:24, 7 January 2019 diff hist +40 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:17, 7 January 2019 diff hist +165 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:08, 7 January 2019 diff hist +639 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:07, 4 January 2019 diff hist +52 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:06, 4 January 2019 diff hist 0 N File:Design deviations.docx current
- 10:05, 4 January 2019 diff hist +53 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:01, 4 January 2019 diff hist 0 N File:Design exceptions.docx
- 09:59, 4 January 2019 diff hist +457 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:17, 2 January 2019 diff hist +1 Stop Sign Design Guidelines →Governing Document Reference: current
- 11:16, 2 January 2019 diff hist +12 Stop Sign Design Guidelines →Governing Document Reference:
- 11:10, 2 January 2019 diff hist −5 Stop Sign Design Guidelines →Governing Document Reference:
- 11:07, 2 January 2019 diff hist 0 Stop Sign Design Guidelines →Governing Document Reference:
- 11:07, 2 January 2019 diff hist +6 Stop Sign Design Guidelines →Governing Document Reference:
- 11:06, 2 January 2019 diff hist +102 Stop Sign Design Guidelines →Governing Document Reference:
- 11:04, 2 January 2019 diff hist +79 Stop Sign Design Guidelines →Governing Document Reference:
- 11:01, 2 January 2019 diff hist −54 Stop Sign Design Guidelines →Governing Document Reference:
- 10:52, 2 January 2019 diff hist +84 Stop Sign Design Guidelines →Governing Document Reference:
- 10:48, 2 January 2019 diff hist +8 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:32, 2 January 2019 diff hist +4 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 10:30, 2 January 2019 diff hist +57 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 10:28, 2 January 2019 diff hist +16 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 09:51, 2 January 2019 diff hist +16 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 07:30, 26 October 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 10:28, 10 October 2018 diff hist +186 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:47, 8 October 2018 diff hist +114 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:42, 8 October 2018 diff hist +29 N File:III-11a-2c eBid Certification Form KDOT.docx Certification for eBid - KDOT current
- 15:36, 8 October 2018 diff hist 0 File:III-11a-6a Notice to Bidders KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-6a Notice to Bidders KDOT.docx" current
- 15:33, 8 October 2018 diff hist 0 File:III-11a-10a Table of Contents KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-10a Table of Contents KDOT.docx" current
- 15:26, 8 October 2018 diff hist 0 File:III-11a-6 2 eBid-Notice to Bidders.docx Irina Idelson uploaded a new version of "File:III-11a-6 2 eBid-Notice to Bidders.docx" current
- 15:21, 8 October 2018 diff hist 0 File:III-11a-6b Notice to Bidders-CDBG.docx Irina Idelson uploaded a new version of "File:III-11a-6b Notice to Bidders-CDBG.docx" current
- 10:01, 1 October 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 14:13, 25 September 2018 diff hist −1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:11, 25 September 2018 diff hist +34 N File:IV-6 Engineers Estimate.docx A Template for Engineer's Estimate current
- 14:02, 25 September 2018 diff hist 0 File:V-14b cetificate of subcontract work and payment.xlsx Irina Idelson uploaded a new version of "File:V-14b cetificate of subcontract work and payment.xlsx" current
- 13:57, 25 September 2018 diff hist 0 File:V-14a Pay estimate with DBE.xlsx Irina Idelson uploaded a new version of "File:V-14a Pay estimate with DBE.xlsx" current
- 16:30, 24 September 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 08:18, 20 September 2018 diff hist −189 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 10:05, 17 September 2018 diff hist +55 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 09:58, 17 September 2018 diff hist +60 N File:KDOT Form 1010LP.xlsx Certificate of Subcontract Work and Pavement - 2017 Revision current
- 08:41, 17 September 2018 diff hist +13 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 16:08, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 26 - Receive Final Acceptance from KDOT
- 16:07, 14 September 2018 diff hist −117 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:02, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:01, 14 September 2018 diff hist −67 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:00, 14 September 2018 diff hist −41 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 15:56, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 15:55, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:46, 14 September 2018 diff hist +73 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:44, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:41, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:34, 14 September 2018 diff hist +94 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:28, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:22, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:22, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:14, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:13, 14 September 2018 diff hist −2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:11, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:05, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:02, 14 September 2018 diff hist +82 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:53, 14 September 2018 diff hist −69 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 14:44, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 14:22, 14 September 2018 diff hist +9 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 14:18, 14 September 2018 diff hist +54 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:13, 14 September 2018 diff hist −10 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:08, 14 September 2018 diff hist −2 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:52, 14 September 2018 diff hist +8 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:49, 14 September 2018 diff hist −5 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:43, 14 September 2018 diff hist +2 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:42, 14 September 2018 diff hist +47 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:40, 14 September 2018 diff hist −6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:35, 14 September 2018 diff hist +6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:33, 14 September 2018 diff hist −12 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 13:14, 14 September 2018 diff hist +3 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +1 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +55 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:39, 14 September 2018 diff hist −2 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:31, 14 September 2018 diff hist +6 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:30, 14 September 2018 diff hist +129 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:21, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 10:16, 14 September 2018 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:15, 14 September 2018 diff hist +77 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:08, 14 September 2018 diff hist +25 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:02, 14 September 2018 diff hist +49 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:50, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 09:33, 14 September 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:19, 14 September 2018 diff hist +17 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 09:03, 14 September 2018 diff hist −58 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 16:13, 13 September 2018 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:12, 13 September 2018 diff hist −5 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 16 - Schedule Fourth Utility Meeting
- 16:09, 13 September 2018 diff hist −3 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:16, 13 September 2018 diff hist −12 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:55, 13 September 2018 diff hist +2 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:54, 13 September 2018 diff hist +7 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:30, 13 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:46, 6 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:43, 6 September 2018 diff hist −162 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:41, 6 September 2018 diff hist 0 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 16:40, 6 September 2018 diff hist −1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:39, 6 September 2018 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:35, 6 September 2018 diff hist −15 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:22, 6 September 2018 diff hist +16 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 16:20, 6 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:19, 6 September 2018 diff hist −78 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:11, 6 September 2018 diff hist −37 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:06, 6 September 2018 diff hist +89 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:00, 6 September 2018 diff hist −43 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 16:45, 5 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:40, 5 September 2018 diff hist −98 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 15:07, 5 September 2018 diff hist −1 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 15:06, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 14:55, 5 September 2018 diff hist −77 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:43, 5 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:36, 5 September 2018 diff hist −2 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:35, 5 September 2018 diff hist −8 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:34, 5 September 2018 diff hist +3 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:32, 5 September 2018 diff hist −5 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:28, 5 September 2018 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:27, 5 September 2018 diff hist −27 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:22, 5 September 2018 diff hist +29 N File:III-11a-2a Bid items (eBid).xlsx Bid Items for electronic bids current
- 14:03, 5 September 2018 diff hist +24 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:01, 5 September 2018 diff hist −17 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 13:44, 5 September 2018 diff hist +1 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 12:02, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 11:32, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 11:22, 5 September 2018 diff hist +6 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:21, 5 September 2018 diff hist +12 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:20, 5 September 2018 diff hist +15 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 11:15, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 29 - Continue Environmental Process
- 11:14, 5 September 2018 diff hist +8 Phase II - Preliminary Design →Task No. 27 - Schedule Field Check Meeting
- 10:54, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:47, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 10:46, 5 September 2018 diff hist +3 Phase II - Preliminary Design →Task No. 12 - Other Agency Agreements (if Applicable)
- 10:45, 5 September 2018 diff hist +2 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 10:44, 5 September 2018 diff hist +8 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 10:24, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 08:35, 5 September 2018 diff hist −12 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 08:31, 5 September 2018 diff hist −6 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 08:31, 5 September 2018 diff hist −6 Phase I - Vision →Task 12 - Obtain Priority Evaluation from KDOT
- 08:25, 5 September 2018 diff hist +12 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 08:18, 5 September 2018 diff hist +67 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 15:40, 4 September 2018 diff hist −5 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:38, 4 September 2018 diff hist +39 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:36, 4 September 2018 diff hist +62 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:33, 4 September 2018 diff hist −2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 15:33, 4 September 2018 diff hist +4 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 15:28, 4 September 2018 diff hist +30 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:23, 4 September 2018 diff hist −9 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:20, 4 September 2018 diff hist −7 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 15:17, 4 September 2018 diff hist +115 Phase IV - Pre-Construction →Task No. 16 - Receive Bid Approval from KDOT
- 15:15, 4 September 2018 diff hist +32 N File:IV-16b checklist for authority to award.pdf Checklist for Authority to Award current
- 14:39, 4 September 2018 diff hist +56 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 14:33, 4 September 2018 diff hist +108 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 14:27, 4 September 2018 diff hist −6 Template:LPA citation current
- 13:35, 4 September 2018 diff hist +2 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 13:34, 4 September 2018 diff hist −3 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 12:05, 4 September 2018 diff hist +20 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 12:03, 4 September 2018 diff hist +34 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 12:00, 4 September 2018 diff hist −4 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 11:58, 4 September 2018 diff hist +4 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:54, 4 September 2018 diff hist +92 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:46, 4 September 2018 diff hist +1 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:43, 4 September 2018 diff hist +68 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:42, 4 September 2018 diff hist −1 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:41, 4 September 2018 diff hist +140 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:31, 4 September 2018 diff hist +1 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 11:23, 4 September 2018 diff hist +261 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 11:07, 4 September 2018 diff hist +55 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 10:59, 4 September 2018 diff hist +3 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 10:58, 4 September 2018 diff hist −11 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 10:13, 4 September 2018 diff hist −9 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:36, 4 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:32, 4 September 2018 diff hist −64 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:31, 4 September 2018 diff hist +59 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:28, 4 September 2018 diff hist +31 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:22, 4 September 2018 diff hist +10 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:12, 4 September 2018 diff hist +4 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:10, 4 September 2018 diff hist +17 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:08, 4 September 2018 diff hist +102 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:02, 4 September 2018 diff hist +113 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:01, 4 September 2018 diff hist +390 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 08:37, 4 September 2018 diff hist +407 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications
- 08:28, 4 September 2018 diff hist −2 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 16:22, 31 August 2018 diff hist +113 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 16:15, 31 August 2018 diff hist −1 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 16:14, 31 August 2018 diff hist −90 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:58, 31 August 2018 diff hist +6 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:58, 31 August 2018 diff hist +31 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:34, 31 August 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:28, 31 August 2018 diff hist +216 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:15, 31 August 2018 diff hist +20 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractors/DBE Firms
- 15:03, 31 August 2018 diff hist −6 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 15:02, 31 August 2018 diff hist −71 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:20, 31 August 2018 diff hist −1 Phase IV - Pre-Construction →Introduction
- 11:03, 31 August 2018 diff hist −6 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 09:56, 31 August 2018 diff hist +7 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:55, 31 August 2018 diff hist +196 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:13, 31 August 2018 diff hist +188 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:08, 31 August 2018 diff hist +719 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 08:26, 31 August 2018 diff hist −3 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:38, 29 August 2018 diff hist +184 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:26, 29 August 2018 diff hist +157 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:15, 29 August 2018 diff hist +48 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:56, 29 August 2018 diff hist +330 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:49, 29 August 2018 diff hist +6 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:49, 29 August 2018 diff hist −35 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:47, 29 August 2018 diff hist +145 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:31, 29 August 2018 diff hist +354 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:23, 29 August 2018 diff hist −74 Phase V - Construction →Task No. 12 - On-Going Inspections
- 14:21, 29 August 2018 diff hist +263 Phase V - Construction →Task No. 12 - On-Going Inspections
- 14:12, 29 August 2018 diff hist −4 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:11, 29 August 2018 diff hist +18 N File:Sample Hold letter to Black & McDonald.pdf Sample hold letter current
- 14:06, 29 August 2018 diff hist −11 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:06, 29 August 2018 diff hist +22 N File:Sample Letter to KCP&L.pdf Sample letter to KCP&L current
- 14:02, 29 August 2018 diff hist +13 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:01, 29 August 2018 diff hist +37 N File:Sample Release to Construction letter to Black & McDonald.pdf Sample release to construction letter current
- 11:10, 29 August 2018 diff hist +99 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 11:08, 29 August 2018 diff hist +175 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 10:57, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 10:56, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 10:54, 29 August 2018 diff hist −3 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:53, 29 August 2018 diff hist +30 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:47, 29 August 2018 diff hist +6 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:39, 29 August 2018 diff hist +29 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:37, 29 August 2018 diff hist +12 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:35, 29 August 2018 diff hist +30 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 10:34, 29 August 2018 diff hist +52 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 10:27, 29 August 2018 diff hist +59 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 09:19, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 3 - Submit Cash Flow Projection to City Finance Department
- 09:19, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 2 - Submit Agency Cash Flow Projection
- 09:02, 29 August 2018 diff hist +26 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:01, 29 August 2018 diff hist +27 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:00, 29 August 2018 diff hist +27 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 08:59, 29 August 2018 diff hist −31 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 08:55, 29 August 2018 diff hist +2 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:49, 29 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 08:48, 29 August 2018 diff hist +12 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:47, 29 August 2018 diff hist −90 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:46, 29 August 2018 diff hist +90 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:42, 29 August 2018 diff hist +82 Phase III - Final Design →Task No. 15 - PS&E Review
- 08:32, 29 August 2018 diff hist +84 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 08:21, 29 August 2018 diff hist +101 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 07:48, 29 August 2018 diff hist +6 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 07:46, 29 August 2018 diff hist +27 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 07:37, 29 August 2018 diff hist +6 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:37, 29 August 2018 diff hist 0 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:36, 29 August 2018 diff hist +112 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:33, 29 August 2018 diff hist +55 N File:15.0 LPA-Administered Procedures 2018.pdf Chapter 15 of the KDOT's LPA Project Development Manual current
- 07:30, 29 August 2018 diff hist +10 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:29, 29 August 2018 diff hist −4 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:28, 29 August 2018 diff hist +120 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 16:59, 28 August 2018 diff hist −6 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 16:57, 28 August 2018 diff hist +6 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:56, 28 August 2018 diff hist −6 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:55, 28 August 2018 diff hist +41 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:54, 28 August 2018 diff hist +6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:54, 28 August 2018 diff hist +135 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:50, 28 August 2018 diff hist +50 N File:7.0 Status of Utilities 2018.pdf Chapter 7 of KDOT's LPA Project Development Manual current
- 16:46, 28 August 2018 diff hist +67 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 16:41, 28 August 2018 diff hist +16 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:32, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:31, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:30, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:28, 28 August 2018 diff hist −4 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:27, 28 August 2018 diff hist +52 N File:6.0 Right of Way 2018.pdf Chapter 6.0 of KDOT's LPA Project Development Manual current
- 16:17, 28 August 2018 diff hist +25 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:16, 28 August 2018 diff hist +148 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 16:15, 28 August 2018 diff hist +147 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 14:13, 28 August 2018 diff hist +17 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 14:12, 28 August 2018 diff hist +46 N File:II-32i.dot Irina Idelson moved page File:II-32i.dot to File:II-34i appraisal review.dot current
- 14:12, 28 August 2018 diff hist 0 m File:II-34i appraisal review.dot Irina Idelson moved page File:II-32i.dot to File:II-34i appraisal review.dot current
- 13:57, 28 August 2018 diff hist +87 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:52, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:51, 28 August 2018 diff hist +37 N File:II-34h Ranking sheet rw proposals.pdf Ranking Sheet for Appraisal Proposals current