- 08:44, 27 March 2019 diff hist +362 Approved Materials - Erosion and Sediment Control
- 08:41, 27 March 2019 diff hist +63 N Preapproved Materials Sediment Control Irina Idelson moved page Preapproved Materials Sediment Control to Approved Materials - Erosion and Sediment Control current
- 08:41, 27 March 2019 diff hist 0 m Approved Materials - Erosion and Sediment Control Irina Idelson moved page Preapproved Materials Sediment Control to Approved Materials - Erosion and Sediment Control
- 08:23, 27 March 2019 diff hist +111 Approved Materials - Guardrail →Wood Posts
- 08:21, 27 March 2019 diff hist +110 Approved Materials - Guardrail →Non-Metallic Offset Blocks for Guardrail
- 08:19, 27 March 2019 diff hist +111 Approved Materials - Guardrail →Deep Beam Guardrail
- 08:16, 27 March 2019 diff hist +894 Approved Materials - Guardrail →Guardrail Terminal Systems
- 08:14, 27 March 2019 diff hist +44 N Preapproved Materials Guardrail Irina Idelson moved page Preapproved Materials Guardrail to Approved Materials - Guardrail current
- 08:14, 27 March 2019 diff hist 0 m Approved Materials - Guardrail Irina Idelson moved page Preapproved Materials Guardrail to Approved Materials - Guardrail
- 08:04, 27 March 2019 diff hist +45 N Preapproved Materials Geotextile Irina Idelson moved page Preapproved Materials Geotextile to Approved Materials - Geotextile current
- 08:04, 27 March 2019 diff hist 0 m Approved Materials - Geotextile Irina Idelson moved page Preapproved Materials Geotextile to Approved Materials - Geotextile
- 08:02, 27 March 2019 diff hist +49 N Preapproved Materials Storm Drainage Irina Idelson moved page Preapproved Materials Storm Drainage to Approved Materials - Storm Drainage current
- 08:02, 27 March 2019 diff hist 0 m Approved Materials - Storm Drainage Irina Idelson moved page Preapproved Materials Storm Drainage to Approved Materials - Storm Drainage
- 07:59, 27 March 2019 diff hist +56 Approved Materials - Concrete Work →Curing Compound
- 07:57, 27 March 2019 diff hist +48 N Preapproved Materials Concrete Work Irina Idelson moved page Preapproved Materials Concrete Work to Approved Materials - Concrete Work current
- 07:57, 27 March 2019 diff hist 0 m Approved Materials - Concrete Work Irina Idelson moved page Preapproved Materials Concrete Work to Approved Materials - Concrete Work
- 07:53, 27 March 2019 diff hist +47 N Preapproved Materials Bridge Items Irina Idelson moved page Preapproved Materials Bridge Items to Approved Materials - Bridge Items current
- 07:53, 27 March 2019 diff hist 0 m Approved Materials - Bridge Items Irina Idelson moved page Preapproved Materials Bridge Items to Approved Materials - Bridge Items
- 07:46, 27 March 2019 diff hist +50 N Preapproved Materials Traffic Signals Irina Idelson moved page Preapproved Materials Traffic Signals to Approved Materials - Traffic Signals current
- 07:46, 27 March 2019 diff hist 0 m Approved Materials - Traffic Signals Irina Idelson moved page Preapproved Materials Traffic Signals to Approved Materials - Traffic Signals
- 07:43, 27 March 2019 diff hist +50 N Preapproved Materials Traffic Control Irina Idelson moved page Preapproved Materials Traffic Control to Approved Materials - Traffic Control current
- 07:43, 27 March 2019 diff hist 0 m Approved Materials - Traffic Control Irina Idelson moved page Preapproved Materials Traffic Control to Approved Materials - Traffic Control
- 07:41, 27 March 2019 diff hist +49 N Preapproved Materials Streetlighting Irina Idelson moved page Preapproved Materials Streetlighting to Approved Materials - Streetlighting current
- 07:41, 27 March 2019 diff hist 0 m Approved Materials - Streetlighting Irina Idelson moved page Preapproved Materials Streetlighting to Approved Materials - Streetlighting
- 07:39, 27 March 2019 diff hist +42 N Preapproved Materials Signing Irina Idelson moved page Preapproved Materials Signing to Approved Materials - Signing current
- 07:39, 27 March 2019 diff hist 0 m Approved Materials - Signing Irina Idelson moved page Preapproved Materials Signing to Approved Materials - Signing
- 07:37, 27 March 2019 diff hist +51 N Preapproved Materials Pavement Marking Irina Idelson moved page Preapproved Materials Pavement Marking to Approved Materials - Pavement Marking current
- 07:37, 27 March 2019 diff hist 0 m Approved Materials - Pavement Marking Irina Idelson moved page Preapproved Materials Pavement Marking to Approved Materials - Pavement Marking
- 07:30, 27 March 2019 diff hist +38 N Preapproved Materials ITS Irina Idelson moved page Preapproved Materials ITS to Approved Materials - ITS current
- 07:30, 27 March 2019 diff hist 0 m Approved Materials - ITS Irina Idelson moved page Preapproved Materials ITS to Approved Materials - ITS
- 07:28, 27 March 2019 diff hist +47 N Preapproved Materials Fiber Optics Irina Idelson moved page Preapproved Materials Fiber Optics to Approved Materials - Fiber Optics current
- 07:28, 27 March 2019 diff hist 0 m Approved Materials - Fiber Optics Irina Idelson moved page Preapproved Materials Fiber Optics to Approved Materials - Fiber Optics
- 07:19, 27 March 2019 diff hist +50 N Preapproved Materials Specialty Items Irina Idelson moved page Preapproved Materials Specialty Items to Approved Materials - Specialty Items current
- 07:19, 27 March 2019 diff hist 0 m Approved Materials - Specialty Items Irina Idelson moved page Preapproved Materials Specialty Items to Approved Materials - Specialty Items
- 16:46, 26 March 2019 diff hist 0 m Approved Materials -Test Irina Idelson moved page Approved Materials to Approved Materials -Test current
- 16:09, 26 March 2019 diff hist −6 Approved Materials - Traffic Signals
- 15:23, 21 March 2019 diff hist +33 Contractor Submittal Forms
- 15:11, 21 March 2019 diff hist +28 N Category:Approved Materials Created page with "Category: Approved Materials" current
- 08:58, 21 March 2019 diff hist +12 Contractor Submittal Forms →Storm Water
- 08:58, 21 March 2019 diff hist +24 Contractor Submittal Forms →Roadway Materials
- 08:54, 21 March 2019 diff hist −97 Contractor Submittal Forms
- 08:14, 21 March 2019 diff hist +222 Contractor Submittal Forms →Traffic Materials
- 15:22, 20 March 2019 diff hist 0 Approved Materials -Test
- 11:00, 20 March 2019 diff hist +12 N File:Gregory Industries Inc MGS.pdf Catalog Link current
- 10:27, 20 March 2019 diff hist +20 Contractor Submittal Forms →Traffic Materials
- 10:26, 20 March 2019 diff hist +56 Contractor Submittal Forms →Traffic Materials
- 10:17, 20 March 2019 diff hist +1 Contractor Submittal Forms →Traffic Materials
- 10:16, 20 March 2019 diff hist +275 Contractor Submittal Forms →Traffic Materials
- 10:11, 20 March 2019 diff hist +54 Contractor Submittal Forms →Traffic Materials
- 10:08, 20 March 2019 diff hist −50 Contractor Submittal Forms →Traffic Materials
- 09:58, 20 March 2019 diff hist +3 Contractor Submittal Forms →Roadway Materials
- 09:56, 20 March 2019 diff hist 0 Contractor Submittal Forms →Traffic Materials
- 09:52, 20 March 2019 diff hist +63 Contractor Submittal Forms
- 09:49, 20 March 2019 diff hist +104 Contractor Submittal Forms →Traffic Materials
- 09:40, 20 March 2019 diff hist −3 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 09:39, 20 March 2019 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 07:46, 20 March 2019 diff hist −24 Template:PQL-CSF current
- 15:06, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:55, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:29, 19 March 2019 diff hist −2 Approved Materials -Test
- 14:24, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:01, 19 March 2019 diff hist −1 Approved Materials -Test
- 14:00, 19 March 2019 diff hist +24 Template:PQL-CSF
- 13:42, 19 March 2019 diff hist −9 Template:PQL-CSF
- 13:35, 19 March 2019 diff hist −1 Approved Materials -Test
- 13:14, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:55, 19 March 2019 diff hist −9 Template:PQLReturn
- 12:44, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:43, 19 March 2019 diff hist −72 Approved Materials - Fiber Optics
- 12:24, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:20, 19 March 2019 diff hist −1 Approved Materials -Test
- 12:14, 19 March 2019 diff hist −36 Approved Materials -Test
- 10:36, 19 March 2019 diff hist +2 Approved Materials -Test
- 10:34, 19 March 2019 diff hist −1 Approved Materials -Test
- 10:34, 19 March 2019 diff hist −2 Approved Materials -Test
- 11:48, 12 March 2019 diff hist −1 Approved Materials -Test
- 11:47, 12 March 2019 diff hist −1 Approved Materials -Test
- 11:23, 12 March 2019 diff hist +912 Approved Materials -Test
- 11:19, 12 March 2019 diff hist −476 Approved Materials -Test Replaced content with "== Roadway Construction =="
- 15:24, 11 March 2019 diff hist +3 Approved Materials
- 15:22, 11 March 2019 diff hist −3 Approved Materials
- 15:22, 11 March 2019 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 11:37, 4 March 2019 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 12:21, 6 February 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf" current
- 12:20, 6 February 2019 diff hist 0 File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf" current
- 12:18, 6 February 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf" current
- 12:17, 6 February 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf"
- 16:14, 30 January 2019 diff hist +105 Approved Materials - Storm Drainage →Sealants - Manhole
- 16:11, 30 January 2019 diff hist +36 Approved Materials - Storm Drainage →Inlet Frames
- 16:07, 30 January 2019 diff hist +20 Approved Materials - Storm Drainage →Inlet Frames
- 16:06, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Manhole Steps
- 16:06, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Manhole Rings & Lids
- 16:05, 30 January 2019 diff hist +6 Approved Materials - Storm Drainage →Underdrains
- 16:04, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Underdrains
- 16:04, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Class III Concrete Pipe
- 16:03, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Manhole Rings & Lids
- 16:03, 30 January 2019 diff hist −32 Approved Materials - Storm Drainage →Manhole Steps
- 16:01, 30 January 2019 diff hist +12 Approved Materials - Guardrail →Deep Beam Guardrail
- 16:00, 30 January 2019 diff hist −40 Approved Materials - Erosion and Sediment Control →Filter Sock
- 15:59, 30 January 2019 diff hist −40 Approved Materials - Erosion and Sediment Control →Biodegradable Logs
- 15:59, 30 January 2019 diff hist −2 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 15:59, 30 January 2019 diff hist −38 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 15:57, 30 January 2019 diff hist 0 Approved Materials - Concrete Work →Curing Compound
- 15:56, 30 January 2019 diff hist 0 Approved Materials - Concrete Work →Curing Compound
- 15:52, 30 January 2019 diff hist −8 Approved Materials - Concrete Work →Expansion Joint Material
- 15:52, 30 January 2019 diff hist +12 Approved Materials - Concrete Work →Median Pavers
- 15:51, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →Pavement Repair
- 15:51, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:50, 30 January 2019 diff hist −32 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:49, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Median Pavers
- 15:49, 30 January 2019 diff hist +6 Approved Materials - Concrete Work →Expansion Joint Material
- 15:48, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Expansion Joint Material
- 15:48, 30 January 2019 diff hist −38 Approved Materials - Concrete Work →Curing Compound
- 10:24, 29 January 2019 diff hist 0 Approved Materials - Bridge Items
- 10:02, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf"
- 09:58, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf"
- 09:57, 28 January 2019 diff hist 0 File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf"
- 09:54, 28 January 2019 diff hist 0 File:Thoroughfare Interim Sections Jan-2019.pdf Irina Idelson uploaded a new version of "File:Thoroughfare Interim Sections Jan-2019.pdf"
- 11:32, 10 January 2019 diff hist +91 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:31, 10 January 2019 diff hist +16 N File:Thoroughfare Interim Sections Jan-2019.pdf Interim Sections
- 11:31, 10 January 2019 diff hist +107 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:29, 10 January 2019 diff hist +24 N File:Thoroughfare Ultimate 2-Lane Sections Jan-2019.pdf Ultimate 2-lane Sections
- 11:28, 10 January 2019 diff hist +121 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 11:27, 10 January 2019 diff hist +31 N File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2019.pdf Ultimate 4- and 3-lane Sections
- 11:25, 10 January 2019 diff hist +161 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 17:21, 7 January 2019 diff hist −15 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:31, 7 January 2019 diff hist −285 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:29, 7 January 2019 diff hist −43 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:24, 7 January 2019 diff hist +40 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:17, 7 January 2019 diff hist +165 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:08, 7 January 2019 diff hist +639 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:07, 4 January 2019 diff hist +52 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:06, 4 January 2019 diff hist 0 N File:Design deviations.docx current
- 10:05, 4 January 2019 diff hist +53 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:01, 4 January 2019 diff hist 0 N File:Design exceptions.docx
- 09:59, 4 January 2019 diff hist +457 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:17, 2 January 2019 diff hist +1 Stop Sign Design Guidelines →Governing Document Reference: current
- 11:16, 2 January 2019 diff hist +12 Stop Sign Design Guidelines →Governing Document Reference:
- 11:10, 2 January 2019 diff hist −5 Stop Sign Design Guidelines →Governing Document Reference:
- 11:07, 2 January 2019 diff hist 0 Stop Sign Design Guidelines →Governing Document Reference:
- 11:07, 2 January 2019 diff hist +6 Stop Sign Design Guidelines →Governing Document Reference:
- 11:06, 2 January 2019 diff hist +102 Stop Sign Design Guidelines →Governing Document Reference:
- 11:04, 2 January 2019 diff hist +79 Stop Sign Design Guidelines →Governing Document Reference:
- 11:01, 2 January 2019 diff hist −54 Stop Sign Design Guidelines →Governing Document Reference:
- 10:52, 2 January 2019 diff hist +84 Stop Sign Design Guidelines →Governing Document Reference:
- 10:48, 2 January 2019 diff hist +8 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:32, 2 January 2019 diff hist +4 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 10:30, 2 January 2019 diff hist +57 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 10:28, 2 January 2019 diff hist +16 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 09:51, 2 January 2019 diff hist +16 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 07:30, 26 October 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 10:28, 10 October 2018 diff hist +186 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:47, 8 October 2018 diff hist +114 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:42, 8 October 2018 diff hist +29 N File:III-11a-2c eBid Certification Form KDOT.docx Certification for eBid - KDOT current
- 15:36, 8 October 2018 diff hist 0 File:III-11a-6a Notice to Bidders KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-6a Notice to Bidders KDOT.docx" current
- 15:33, 8 October 2018 diff hist 0 File:III-11a-10a Table of Contents KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-10a Table of Contents KDOT.docx" current
- 15:26, 8 October 2018 diff hist 0 File:III-11a-6 2 eBid-Notice to Bidders.docx Irina Idelson uploaded a new version of "File:III-11a-6 2 eBid-Notice to Bidders.docx" current
- 15:21, 8 October 2018 diff hist 0 File:III-11a-6b Notice to Bidders-CDBG.docx Irina Idelson uploaded a new version of "File:III-11a-6b Notice to Bidders-CDBG.docx" current
- 10:01, 1 October 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 14:13, 25 September 2018 diff hist −1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:11, 25 September 2018 diff hist +34 N File:IV-6 Engineers Estimate.docx A Template for Engineer's Estimate current
- 14:02, 25 September 2018 diff hist 0 File:V-14b cetificate of subcontract work and payment.xlsx Irina Idelson uploaded a new version of "File:V-14b cetificate of subcontract work and payment.xlsx" current
- 13:57, 25 September 2018 diff hist 0 File:V-14a Pay estimate with DBE.xlsx Irina Idelson uploaded a new version of "File:V-14a Pay estimate with DBE.xlsx" current
- 16:30, 24 September 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 08:18, 20 September 2018 diff hist −189 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 10:05, 17 September 2018 diff hist +55 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 09:58, 17 September 2018 diff hist +60 N File:KDOT Form 1010LP.xlsx Certificate of Subcontract Work and Pavement - 2017 Revision current
- 08:41, 17 September 2018 diff hist +13 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 16:08, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 26 - Receive Final Acceptance from KDOT
- 16:07, 14 September 2018 diff hist −117 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:02, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:01, 14 September 2018 diff hist −67 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:00, 14 September 2018 diff hist −41 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 15:56, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 15:55, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:46, 14 September 2018 diff hist +73 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:44, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:41, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:34, 14 September 2018 diff hist +94 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:28, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:22, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:22, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:14, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:13, 14 September 2018 diff hist −2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:11, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:05, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:02, 14 September 2018 diff hist +82 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:53, 14 September 2018 diff hist −69 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 14:44, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 14:22, 14 September 2018 diff hist +9 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 14:18, 14 September 2018 diff hist +54 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:13, 14 September 2018 diff hist −10 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:08, 14 September 2018 diff hist −2 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:52, 14 September 2018 diff hist +8 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:49, 14 September 2018 diff hist −5 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:43, 14 September 2018 diff hist +2 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:42, 14 September 2018 diff hist +47 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:40, 14 September 2018 diff hist −6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:35, 14 September 2018 diff hist +6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:33, 14 September 2018 diff hist −12 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 13:14, 14 September 2018 diff hist +3 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +1 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +55 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:39, 14 September 2018 diff hist −2 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:31, 14 September 2018 diff hist +6 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:30, 14 September 2018 diff hist +129 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:21, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 10:16, 14 September 2018 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:15, 14 September 2018 diff hist +77 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:08, 14 September 2018 diff hist +25 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:02, 14 September 2018 diff hist +49 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:50, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 09:33, 14 September 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:19, 14 September 2018 diff hist +17 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 09:03, 14 September 2018 diff hist −58 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 16:13, 13 September 2018 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:12, 13 September 2018 diff hist −5 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 16 - Schedule Fourth Utility Meeting
- 16:09, 13 September 2018 diff hist −3 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:16, 13 September 2018 diff hist −12 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:55, 13 September 2018 diff hist +2 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:54, 13 September 2018 diff hist +7 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:30, 13 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:46, 6 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:43, 6 September 2018 diff hist −162 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:41, 6 September 2018 diff hist 0 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 16:40, 6 September 2018 diff hist −1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:39, 6 September 2018 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:35, 6 September 2018 diff hist −15 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:22, 6 September 2018 diff hist +16 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 16:20, 6 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:19, 6 September 2018 diff hist −78 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:11, 6 September 2018 diff hist −37 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:06, 6 September 2018 diff hist +89 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:00, 6 September 2018 diff hist −43 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 16:45, 5 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:40, 5 September 2018 diff hist −98 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 15:07, 5 September 2018 diff hist −1 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 15:06, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 14:55, 5 September 2018 diff hist −77 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:43, 5 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:36, 5 September 2018 diff hist −2 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:35, 5 September 2018 diff hist −8 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:34, 5 September 2018 diff hist +3 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:32, 5 September 2018 diff hist −5 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:28, 5 September 2018 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:27, 5 September 2018 diff hist −27 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance