Search results

Jump to navigation Jump to search
  • ...l Zone Sign (S1-1) and Plaques (S4-3P, S4-7P) and END SCHOOL ZONE Sign (S5-2)=== ...o identify the beginning point(s) of the designated school zone.[[Image:S5-2.JPG|right]]
    11 KB (1,884 words) - 10:02, 31 March 2021
  • ...ve a full set of final bid documents, including plan sheets, no later than 2:00 p.m. on this day. The Contract Specialist will upload the bidding docume *'''Week 5 - Tuesday''' - Bid opening, held at 2:00 p.m. in City Hall. Bids must be provided through QuestCDN.com.
    4 KB (663 words) - 14:05, 9 July 2020
  • [[Image:R1-2.png|right]] A “Yield” (R1-2) sign shall be used to assign right-of-way at the entrance to a roundabout.
    10 KB (1,540 words) - 10:01, 31 March 2021
  • {| class="wikitable" border="2"
    294 bytes (36 words) - 14:34, 27 October 2015
  • | align="center" style="background:#f0f0f0;"|'''Is TL-2 available?''' |rowspan="2"|[http://www.highwayguardrail.com/ '''Trinity Industries, Inc.''']
    4 KB (578 words) - 16:58, 9 April 2020
  • ...inal_Design#Task_No._2_-_Execute_Utility_Agreements|'''Phase III, Task No. 2.''']] The Project Manager shall work with Finance to generate and send the == Task No. 2 - Complete Property Owner Assessments ==
    8 KB (1,208 words) - 08:25, 20 March 2023
  • |2/1/01 {{PQLNote|Type USE-2 or RHH or RHW-2 600 volt}}
    14 KB (1,920 words) - 15:47, 2 May 2023
  • |Minimum 2 sandbags (1 per support leg) ...gaps between sections<br>Vertical plane without obstructions<br>Lower rail 2” or less above ground<br>Upper rail not less than 32” high}}
    25 KB (3,412 words) - 10:55, 2 June 2023
  • ...P-18Beads.pdf|P-18 +4 Blend<sup>1</sup>]]<br><br>AASHTO 247 M Type II<sup>2</sup> |[[Media:TRF PQL PM MEM Potters P-18Beads.pdf|2/12/20]]
    17 KB (2,471 words) - 10:42, 31 May 2023
  • | rowspan="2" |[[602]]
    3 KB (464 words) - 11:03, 16 January 2024
  • ...;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; <SPAN style="FONT-SIZE: 12pt">2 &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; P
    16 KB (2,342 words) - 16:27, 8 April 2010
  • ...2to24-CtPlenumCable.pdf|Tight-Buffered Interlocking Armored Plenum Cable (2 - 24 Fiber) Nomenclature]]<br>[[Media:TRF PQL FO CAT Corning 24-CtPlenumCab ...o24-CtRiserCable.pdf|MIC Tight-Buffered, Interlocking Armored Riser Cable (2 - 24 Fiber) Nomenclature]]<br>[[Media:TRF PQL FO CAT Corning 24CtRiserCable
    35 KB (5,088 words) - 10:51, 2 May 2024
  • ...e legend may be AXLE WEIGHT LIMIT XX TONS or AXLE WEIGHT LIMIT XX LBS (R12-2). ...section within two years, such person, upon conviction, shall be fined 2 1/2 times the applicable amount from the above fine schedule.
    11 KB (1,714 words) - 13:10, 6 May 2021
  • ...an volume entering the intersection from all approaches averages more than 2,000 units per day; ...ear period, or that three or more such crashes have been reported within a 2-year period.
    14 KB (2,214 words) - 10:04, 31 March 2021
  • '''<font color="red">Last Revised 6/2/2023</font>'''<br> ...lank and the edge of the first and last letter in the legend and suffix. A 2" space shall be placed between the street name and the hundred block or suf
    8 KB (1,229 words) - 15:11, 2 June 2023
  • # Assume 1'-6" of a 2'-0" curb and gutter is usable for parking.<br> ...-street parking in the downtown Overland Park district shall be limited to 2 or 3-hour parking unless otherwise posted as short-term (5 or 15 minute) pa
    17 KB (2,668 words) - 09:46, 17 March 2020
  • *Project manager requests current Title Report (no more than 2 to 3 months old), to include property owners, situs address, mailing addres
    3 KB (529 words) - 16:17, 25 June 2021
  • 2. Contract Specialist will prepare a draft of the Bidding Documents for revi ...he estimate is provided to the City Clerk or to the Contract Specialist by 2:00 p.m. the day of the bid opening. The engineer’s estimate should be si
    8 KB (1,290 words) - 13:33, 8 July 2020
  • |rowspan="2" | Tensar||SediMax-FR Filtration Roll
    4 KB (551 words) - 14:59, 1 June 2023
  • | style="text-align: center;" | [[Media:Sec1060.pdf|'''1060''']] || 2" X 2" SIGN POST ANCHORS ||| LNFT | style="text-align: center;" | [[Media:Sec1060.pdf|'''1060''']] || 2-1/4" X 2-1/4" ANCHOR SLEEVES ||| LNFT
    24 KB (3,025 words) - 15:06, 22 March 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)