User contributions for Mike Ross
Jump to navigation
Jump to search
- 06:42, 28 October 2011 diff hist +33 File:III-1g.pdf current
- 06:42, 28 October 2011 diff hist +33 File:III-1b.pdf current
- 06:42, 28 October 2011 diff hist +33 File:III-1c.pdf current
- 06:40, 28 October 2011 diff hist +32 File:IV-2g.dot
- 06:40, 28 October 2011 diff hist +30 File:IV-2a.dot current
- 06:39, 28 October 2011 diff hist +32 File:IV-2d.xlt current
- 06:39, 28 October 2011 diff hist +32 File:IV-17a.dot
- 06:39, 28 October 2011 diff hist +32 File:IV-5l.doc
- 06:38, 28 October 2011 diff hist +32 File:IV-5k.dot
- 06:35, 28 October 2011 diff hist +21 N Category:Phase IV Exhibits Created page with 'Exhibits for Phase IV' current
- 15:36, 8 February 2011 diff hist −1 Approved Materials -Test →Fiber Optic Approved Materials List
- 15:36, 8 February 2011 diff hist −22 Approved Materials -Test →Fiber Optic Approved Materials List
- 15:35, 8 February 2011 diff hist +6 Approved Materials -Test →Fiber Optic Approved Materials List
- 15:33, 8 February 2011 diff hist +397 Approved Materials -Test →Fiber Optic Approved Materials List
- 15:17, 8 February 2011 diff hist +122 N Approved Materials -Test Created page with '== Fiber Optic Approved Materials List == == ITS Approved Materials List == == Pavement Marking Approved Materials List =='
- 15:17, 8 February 2011 diff hist +2 Main Page →Phases
- 15:16, 8 February 2011 diff hist +22 Main Page
- 15:46, 1 November 2010 diff hist +65 Survey Reference Sheet current
- 12:18, 7 July 2010 diff hist +264 Talk:Phase I Checklist →1. Prepare Preliminary Plans/Cost Estimate current
- 12:14, 7 July 2010 diff hist +12 Talk:Phase I Checklist
- 12:13, 7 July 2010 diff hist +2 Talk:Phase I Checklist →2. Prepare Feasibility Report
- 12:13, 7 July 2010 diff hist +809 N Talk:Phase I Checklist Created page with '== 1. Prepare Preliminary Plans/Cost Estimate == == 2. Prepare Feasibility Report == == 3. Prepare SMAC Project Addition Study (Form) == 4. Obtain City Council Approval-Prelim…'
- 15:39, 9 June 2010 diff hist +122 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 13:50, 13 May 2010 diff hist −5 m Phase I - Vision
- 13:49, 13 May 2010 diff hist +1 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 13:48, 13 May 2010 diff hist +8 m Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 13:47, 13 May 2010 diff hist −5 Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 13:47, 13 May 2010 diff hist 0 Template:Top current
- 13:46, 13 May 2010 diff hist +5 m Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 13:46, 13 May 2010 diff hist +5 m Phase I - Vision
- 13:45, 13 May 2010 diff hist +5 m Phase I - Vision
- 13:44, 13 May 2010 diff hist 0 m Phase I - Vision
- 07:25, 11 May 2010 diff hist +72 Talk:Main Page current
- 07:16, 11 May 2010 diff hist +81 N Talk:Main Page Created page with 'Enter comments here --~~~~'
- 05:28, 28 April 2010 diff hist −6 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 05:28, 28 April 2010 diff hist +12 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 05:27, 28 April 2010 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 05:27, 28 April 2010 diff hist −7 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 05:22, 28 April 2010 diff hist +85 Main Page
- 05:11, 28 April 2010 diff hist +174 Help:Contents →Inserting Templates
- 05:07, 28 April 2010 diff hist +16 Help:Contents →Changing text to courier
- 05:07, 28 April 2010 diff hist +44 Help:Contents →Changing the color of text
- 05:04, 28 April 2010 diff hist +4 Help:Contents →Adding or changing content (editing)
- 05:03, 28 April 2010 diff hist 0 Main Page →Overview
- 05:02, 28 April 2010 diff hist −10 Main Page
- 04:54, 28 April 2010 diff hist +112 Main Page →Overview
- 07:41, 27 April 2010 diff hist −2 Template:Brokenlinks current
- 07:40, 27 April 2010 diff hist −2 Template:Update current
- 07:40, 27 April 2010 diff hist +142 Help:Contents →Inserting Templates
- 07:38, 27 April 2010 diff hist +129 Help:Contents →Inserting Templates
- 07:36, 27 April 2010 diff hist +1 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 07:36, 27 April 2010 diff hist −31 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 07:34, 27 April 2010 diff hist −1 Main Page →Overview
- 07:34, 27 April 2010 diff hist +6 Main Page →Overview
- 07:34, 27 April 2010 diff hist +19 Main Page →Overview
- 07:33, 27 April 2010 diff hist 0 N File:Editor.jpg current
- 06:47, 27 April 2010 diff hist −8 References
- 06:46, 27 April 2010 diff hist +14 Revision History
- 06:46, 27 April 2010 diff hist −8 List of Initials and Acronyms
- 06:45, 27 April 2010 diff hist +17 RightsNotice
- 06:45, 27 April 2010 diff hist +55 Help:Contents →Using MediaWiki
- 06:43, 27 April 2010 diff hist +22 Help:Contents →Using MediaWiki
- 06:40, 27 April 2010 diff hist −1 Help:Contents →Add a link to the image:
- 06:40, 27 April 2010 diff hist +27 N File:Pwlogo150px.png Image used in Help contents current
- 06:38, 27 April 2010 diff hist +139 Help:Contents →Inserting Templates
- 06:36, 27 April 2010 diff hist −2 Template:H:texttip current
- 06:32, 27 April 2010 diff hist +703 N Template:H:title Created page with ' {{#ifeq:{{{link}}}|yes |[[{{{2}}}|<span title="{{{1}}}" {{#ifeq:{{{dotted|yes}}}|no| |style="border-bottom:1px dotted" }}>{{{2}}}</span>]] |<span title="{{{1}}}" {{#ifeq:{…' current
- 06:30, 27 April 2010 diff hist +255 N Template:H:texttip Created page with ' <span title="{{{1}}}" style="border-bottom:1px dotted">{{{2}}}</span><noinclude> === Usage === <pre>{{H:texttip |spantitle |label }}</pre> === Example === *<nowiki>{{H:textti…'
- 06:28, 27 April 2010 diff hist +34 N File:Brokenlinks.jpg Image used in Template Brokenlinks current
- 06:27, 27 April 2010 diff hist +85 N Template:Brokenlinks Created page with ' 40px<font color=red>''This page has broken links.''</font>'
- 06:25, 27 April 2010 diff hist +29 N File:40px-Ambox outdated serious svg.png Image used in Update Template current
- 06:23, 27 April 2010 diff hist +106 N Template:Update Created page with ' File:40px-Ambox_outdated_serious_svg.png<font color=red>''This page is in need of updating.''</font>'
- 06:21, 27 April 2010 diff hist −22 Help:Contents →Reviewing all of the categories
- 06:21, 27 April 2010 diff hist +8 Help:Contents →Dividing a page into sections
- 06:18, 27 April 2010 diff hist −4 Help:Contents →Dividing a page into sections
- 06:17, 27 April 2010 diff hist +3 Help:Contents →Dividing a page into sections
- 06:17, 27 April 2010 diff hist +3 Help:Contents →Uploading and adding a link to a document
- 06:16, 27 April 2010 diff hist +3 Help:Contents →Uploading and adding an image
- 06:15, 27 April 2010 diff hist +3 Help:Contents →Changing the color of text
- 06:15, 27 April 2010 diff hist +131 Help:Contents →Upload the image:
- 06:13, 27 April 2010 diff hist +504 Help:Contents →Adding a page header
- 06:11, 27 April 2010 diff hist −799 Help:Contents →Adding a page header
- 06:09, 27 April 2010 diff hist +14 Help:Contents
- 06:08, 27 April 2010 diff hist +20,574 N Help:Contents Created page with '== Using MediaWiki == MediaWiki provides a web space where staff members can share information and create documents collaboratively. MediaWiki is the wiki engine that supports W…'
- 05:59, 27 April 2010 diff hist +16 N MediaWiki:Gadgets-definition Created page with '* wikEd|wikEd.js' current
- 15:22, 19 April 2010 diff hist +9 Phase I - Vision →Task 27 - Submit City Request to KDOT to Administer Federal Funded Projects
- 15:21, 19 April 2010 diff hist 0 Template:KDOT current
- 15:21, 19 April 2010 diff hist +6 Phase I - Vision →Task 5-11 - Obtain City Council Approval - CIP
- 15:19, 19 April 2010 diff hist +9 Phase I - Vision →Task 26 - Receive Project Authorization from KDOT
- 15:19, 19 April 2010 diff hist +35 N Template:KDOT Created page with '|150px|right'
- 15:19, 19 April 2010 diff hist −27 Phase I - Vision →Task 25 Submit KDOT Form 1302 for Project Request |150px|right
- 15:18, 19 April 2010 diff hist +36 Phase I - Vision →Task 25 Submit KDOT Form 1302 for Project Request
- 15:13, 19 April 2010 diff hist +9 N File:KDOTlogo.jpg KDOT Logo current
- 09:59, 19 April 2010 diff hist +5 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 09:59, 19 April 2010 diff hist +35 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 13:53, 16 April 2010 diff hist +9 m Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 13:53, 16 April 2010 diff hist +8 m Phase I - Vision →Task 12 - Submit MARC Five Year Plan
- 13:53, 16 April 2010 diff hist +8 m Phase I - Vision →Task 21 - Receive HUD Approval
- 13:52, 16 April 2010 diff hist +8 m Phase I - Vision →Task 23 - Execute Local Project Agreement - CARS
- 13:52, 16 April 2010 diff hist +8 Phase I - Vision →Task 24 - Obtain Priority Evaluation from KDOT
- 13:52, 16 April 2010 diff hist +8 Phase I - Vision →Task 26 - Receive Project Authorization from KDOT
- 13:52, 16 April 2010 diff hist +8 Phase I - Vision →Task 27 - Submit City Request to KDOT to Administer Federal Funded Projects
- 13:51, 16 April 2010 diff hist +8 Phase I - Vision →Task 25 Submit KDOT Form 1302 for Project Request
- 13:51, 16 April 2010 diff hist +8 Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 13:51, 16 April 2010 diff hist +8 Phase I - Vision →Task 23 Execute Local Project Agreement - SMAC
- 13:51, 16 April 2010 diff hist +8 Phase I - Vision →Task 22 - Submit CARS Five Year Plan to County
- 13:50, 16 April 2010 diff hist +8 Phase I - Vision →Task 16-20 - Submit Application to HUD
- 13:50, 16 April 2010 diff hist +8 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 13:50, 16 April 2010 diff hist +8 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 14:42, 15 April 2010 diff hist 0 File:LoginScreen.jpg uploaded a new version of "File:LoginScreen.jpg" current
- 14:39, 15 April 2010 diff hist +13 RightsNotice
- 14:39, 15 April 2010 diff hist 0 File:LoginScreen.jpg uploaded a new version of "File:LoginScreen.jpg"
- 14:37, 15 April 2010 diff hist +429 N RightsNotice Created page with 'This Wiki requires a user account to do any content editing. To request a new account, first click the "log in" link at the upper right. This screen should appear:[[file:LoginS…'
- 14:33, 15 April 2010 diff hist +27 N File:LoginScreen.jpg Screen shot of login screen
- 14:29, 15 April 2010 diff hist +61 Main Page →Overview
- 14:12, 15 April 2010 diff hist +82 Phase VI - Retrospect →Task No. 9 - Receive Final Payment from KDOT
- 14:11, 15 April 2010 diff hist +119 Phase VI - Retrospect →Task No. 8 - Receive Project Audit by KDOT
- 14:07, 15 April 2010 diff hist +12 Phase VI - Retrospect →Task No. 8 - Receive Project Audit by KDOT
- 14:06, 15 April 2010 diff hist +53 N File:VI-7.pdf Review Guidelines for Project Development Procedures.
- 14:05, 15 April 2010 diff hist +192 Phase VI - Retrospect →Task No. 6 and 7 - Complete Two-Year Inspection and Bond Release
- 14:05, 15 April 2010 diff hist +62 N File:VI-7b.dot sample letter to the Contractor releasing the maintenance bond
- 14:05, 15 April 2010 diff hist +91 N File:VI-7a.dot sample list of work items for the Contractor to perform as a result of two year inspection.
- 14:03, 15 April 2010 diff hist +6 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 14:02, 15 April 2010 diff hist +37 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 14:02, 15 April 2010 diff hist +33 N File:Rectifying Plan Images.dot Instructions for rectifying plans current
- 14:01, 15 April 2010 diff hist +164 Phase VI - Retrospect →Task No. 3 - Conduct Post-Project Conference
- 14:00, 15 April 2010 diff hist +28 N File:VI-3c.dot sample of conference minutes
- 14:00, 15 April 2010 diff hist +24 N File:VI-3b.dot sample conference agenda
- 14:00, 15 April 2010 diff hist +35 N File:VI-3a.dot sample conference invitation letter
- 13:56, 15 April 2010 diff hist +1 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 13:56, 15 April 2010 diff hist +53 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 13:54, 15 April 2010 diff hist +65 N File:VI-2d.dot sample project assessment report for the Director of Public Works
- 13:54, 15 April 2010 diff hist +27 N File:VI-2c.pdf sample assessment tract map
- 13:54, 15 April 2010 diff hist +23 N File:VI-2b.xlt sample assessment roll.
- 13:54, 15 April 2010 diff hist +31 N File:VI-2a.dot sample project assessment memo.
- 13:53, 15 April 2010 diff hist +139 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 13:50, 15 April 2010 diff hist +48 N File:VI-1d.dot sample Project Close Out form for a SMAC project
- 13:50, 15 April 2010 diff hist +51 N File:VI-1c.dot sample Project Close Out letter for a CARS project.
- 13:50, 15 April 2010 diff hist +62 N File:VI-1b.dot sample final project cost memo to the Director of Public Works
- 13:50, 15 April 2010 diff hist +52 N File:VI-1a.xlt sample final project cost sheet generated by Finance
- 13:12, 15 April 2010 diff hist +75 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 10:30, 15 April 2010 diff hist +68 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 10:20, 15 April 2010 diff hist +133 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 10:18, 15 April 2010 diff hist +56 N File:V-23d.xlt sample Final Breakdown of Construction Cost by Work Type
- 10:18, 15 April 2010 diff hist +81 N File:V-23c.dot copy of the DBE Summary Report to be completed by the City and submitted to KDOT.
- 10:18, 15 April 2010 diff hist +51 N File:V-23a.dot copy of the Notice to Acceptance, City Form V-2398.
- 10:18, 15 April 2010 diff hist +49 N File:V-23b.pdf copy of KDOT form 270 Final DBE Payment Affidavit
- 10:18, 15 April 2010 diff hist +59 N File:V-23.dot transmittal letter to KDOT regarding completion of project.
- 10:15, 15 April 2010 diff hist +61 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond
- 10:14, 15 April 2010 diff hist +30 N File:V-22b.dot sample final inspection letter
- 10:14, 15 April 2010 diff hist +59 N File:V-22a.dot sample “Certificate of Engineer as to Completion” form.
- 10:08, 15 April 2010 diff hist −1 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 10:08, 15 April 2010 diff hist +32 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 10:07, 15 April 2010 diff hist +48 N File:V-21b.dot State of Kansas Project Completion Certification
- 10:07, 15 April 2010 diff hist +44 N File:V-21a.dot sample transmittal letter to the Contractor.
- 06:49, 15 April 2010 diff hist +26 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 06:49, 15 April 2010 diff hist +54 N File:V-20b.dot sample letter to property owners regarding tree care.
- 06:49, 15 April 2010 diff hist +57 N File:V-20a.dot sample letter to property owners regarding sod/seed care.
- 06:48, 15 April 2010 diff hist +58 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 06:46, 15 April 2010 diff hist +1 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 06:46, 15 April 2010 diff hist +1 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 06:46, 15 April 2010 diff hist +116 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 06:44, 15 April 2010 diff hist +29 N File:V-18d.pdf example with permit enclosure
- 06:44, 15 April 2010 diff hist +42 N File:V-18c.dot sample KDOT Highway Permit release letter.
- 06:44, 15 April 2010 diff hist +87 N File:V-18a.dot sample Notice of Termination letter for Stormwater Runoff from Construction Activities.
- 06:41, 15 April 2010 diff hist +12 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 06:40, 15 April 2010 diff hist +55 N File:V-17.dot sample “Punch List” for the Contractor to complete.
- 06:40, 15 April 2010 diff hist +40 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 06:39, 15 April 2010 diff hist +43 N File:V-16c.dot sample of a Staff Billing Report to finance
- 06:39, 15 April 2010 diff hist +31 N File:V-16b.dot sample progress meeting minutes
- 06:39, 15 April 2010 diff hist +30 N File:V-16a.dot sample progress meeting agenda
- 06:36, 15 April 2010 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 06:36, 15 April 2010 diff hist +111 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 06:34, 15 April 2010 diff hist +70 N File:V-15.pdf procedure for processing construction change orders for KDOT projects.
- 06:34, 15 April 2010 diff hist +39 N File:V-15d.dot sample change order transmittal letter.
- 06:34, 15 April 2010 diff hist +35 N File:V-15c.dot sample completed change order form.
- 06:34, 15 April 2010 diff hist +39 N File:V-15b.xlt blank change order form. (Excel Format)
- 06:34, 15 April 2010 diff hist +38 N File:V-15a.dot blank change order form. (Word Format)
- 06:29, 15 April 2010 diff hist +58 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 06:27, 15 April 2010 diff hist +69 N File:V-14d.dot KDOT Form No. 209 and requirements on conducting Wage Rate Interviews
- 06:27, 15 April 2010 diff hist +44 N File:V-14c.dot Certificate of Subcontract Work and Payment.
- 06:27, 15 April 2010 diff hist +38 N File:V-14b.pdf DOT Form 1008: DBE Payment Affidavit.
- 06:27, 15 April 2010 diff hist +63 N File:V-14a.xlt template with instructions for creating a Monthly Pay Estimate.
- 06:23, 15 April 2010 diff hist +103 N File:V-13f.xlt spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
- 06:23, 15 April 2010 diff hist +54 N File:V-13e.dot City's Material Testing Recap Log Sheet (word format).
- 06:23, 15 April 2010 diff hist +48 N File:V-13d.dot City's Material Testing Log Sheet (word format).
- 06:23, 15 April 2010 diff hist +49 N File:V-13c.xlt City's Material Testing Log Sheet (excel format).
- 06:23, 15 April 2010 diff hist +65 N File:V-13b.dot example of a transmittal letter and the City's Project Data Sheet
- 06:23, 15 April 2010 diff hist +166 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 06:16, 15 April 2010 diff hist +7 Phase V - Construction →Task No. 12 - On-Going Inspections
- 06:15, 15 April 2010 diff hist +114 Phase V - Construction →Task No. 12 - On-Going Inspections
- 06:15, 15 April 2010 diff hist +41 N File:KDOT Construction Oversight Questionnaire.pdf KDOT Construction Oversight Questionnaire
- 06:13, 15 April 2010 diff hist +34 N File:As-built plan procedure flow chart.xlt AS-built plan procedure flow chart
- 06:12, 15 April 2010 diff hist +161 Phase V - Construction →Task No. 12 - On-Going Inspections
- 06:09, 15 April 2010 diff hist +50 N File:ESC Final Inspection Form.doc Erosion and Sediment Control Final Inspection Form
- 06:09, 15 April 2010 diff hist +44 N File:ESC Initial Inspection Form.doc Initial Erosion and Sediment Inspection Form
- 06:09, 15 April 2010 diff hist +104 N File:ESC Weekly Inspection Form, Amendments and Checklist.xls Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist
- 06:09, 15 April 2010 diff hist +51 N File:ESC Quality Assurance Form.doc Erosion and Sediment Control Quality Assurance Form
- 05:59, 15 April 2010 diff hist +35 Phase V - Construction →Task No. 12 - On-Going Inspections
- 05:52, 15 April 2010 diff hist +388 Phase V - Construction →Task No. 12 - On-Going Inspections
- 05:45, 15 April 2010 diff hist +36 N File:V-12e.xlt City's Sidewalk Ramp Inspection Form
- 05:45, 15 April 2010 diff hist +62 N File:V-12d.dot City's Summary of Cold Weather Concrete Procedures (11/22/00).
- 05:45, 15 April 2010 diff hist +40 N File:V-12c.xlt City's Concrete Inspection Requirements.
- 05:45, 15 April 2010 diff hist +48 N File:V-12b.dot City's Daily Inspection Report in (word format).
- 05:45, 15 April 2010 diff hist +28 N File:Blank Inspection Record Form.dot Blank Inspection Record Form
- 05:39, 15 April 2010 diff hist +37 N File:Inspection Record and fax transmittal - Construction - Task 12.pdf Inspection Record and Fax Transmittal
- 05:34, 15 April 2010 diff hist +189 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 05:32, 15 April 2010 diff hist +26 N File:Contract Submittal Forms.pdf Contractor Submittal Forms
- 05:27, 15 April 2010 diff hist 0 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 05:27, 15 April 2010 diff hist +52 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 05:26, 15 April 2010 diff hist +68 N File:V-11c.dot transmittal letter to the contractor for completed submittals review
- 05:26, 15 April 2010 diff hist +72 N File:V-11b.dot copy of the City's Concrete Mix Design Requirements with approval letter
- 05:26, 15 April 2010 diff hist +44 N File:V-11a.dot storm sewer structure shop drawing checklist
- 05:23, 15 April 2010 diff hist +35 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 05:22, 15 April 2010 diff hist +22 N File:Project photos.pdf Example project photos
- 05:18, 15 April 2010 diff hist +3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 05:17, 15 April 2010 diff hist +6 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 05:16, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 05:15, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 05:14, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 05:14, 15 April 2010 diff hist +1 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 05:14, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Document/Addendum
- 05:13, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 07:47, 14 April 2010 diff hist +3 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 07:47, 14 April 2010 diff hist −123 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 07:44, 14 April 2010 diff hist +94 N File:V-4e.dot sample transmittal letter to prime contractor requesting a copy of each signed DBE subcontract
- 07:44, 14 April 2010 diff hist +61 N File:IV-12b.dot sample letter/form to DBE subcontractor(s) to sign and return
- 07:44, 14 April 2010 diff hist +57 N File:IV-19b.dot sample rejection letter sent to the unsuccessful bidders.
- 07:44, 14 April 2010 diff hist +50 N File:IV-19a.dot sample award letter sent to the successful bidder.
- 07:42, 14 April 2010 diff hist +238 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 07:37, 14 April 2010 diff hist +4 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 07:36, 14 April 2010 diff hist +4 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 07:35, 14 April 2010 diff hist +304 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 07:33, 14 April 2010 diff hist +43 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 07:31, 14 April 2010 diff hist +41 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 07:30, 14 April 2010 diff hist +37 N File:IV-15a.dot template for creating the escrow memo
- 07:30, 14 April 2010 diff hist +25 N File:IV-18b.dot sample project cost memo.
- 07:30, 14 April 2010 diff hist +30 N File:IV-18a.pdf City Charter Ordinance No. 71.
- 07:29, 14 April 2010 diff hist +44 N File:IV-16c.xlt sample staff project cost estimate breakdown
- 07:27, 14 April 2010 diff hist +65 Phase IV - Pre-Construction →Task No. 14 - Evaluate Possible Contractor Collusion
- 07:26, 14 April 2010 diff hist +61 N File:IV-14a.pdf correspondence from KDOT regarding DBE Reporting Requirements
- 07:25, 14 April 2010 diff hist +27 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 07:25, 14 April 2010 diff hist +8 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 07:23, 14 April 2010 diff hist +41 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 07:22, 14 April 2010 diff hist +46 N File:IV-14.pdf example of a completed DBE Contract Goals form
- 06:20, 14 April 2010 diff hist +39 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 06:19, 14 April 2010 diff hist +93 N File:IV-12a.xlt Sub-contractor Breakdown Form to be completed by the apparent low bidder. (Non-KDOT Project)
- 06:19, 14 April 2010 diff hist +89 N File:IV-12.xlt Sub-contractor Breakdown Form to be completed by the apparent low bidder. (KDOT Project)
- 06:16, 14 April 2010 diff hist +20 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 06:16, 14 April 2010 diff hist +31 N File:IV-11.xlt sample detailed bid tabulation.
- 06:14, 14 April 2010 diff hist +7 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 06:12, 14 April 2010 diff hist +17 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 06:12, 14 April 2010 diff hist +27 N File:IV-10.dot sample bid tabulation form.
- 06:10, 14 April 2010 diff hist +15 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Document/Addendum
- 06:10, 14 April 2010 diff hist +47 N File:IV-9.pdf sample transmittal letter and contract addendum
- 06:08, 14 April 2010 diff hist +2 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 06:07, 14 April 2010 diff hist +71 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 06:07, 14 April 2010 diff hist +42 N File:IV-8.pdf example of KDOT's Class or Classes of Work
- 06:05, 14 April 2010 diff hist +7 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:04, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:04, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:03, 14 April 2010 diff hist +8 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:03, 14 April 2010 diff hist −6 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:02, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:02, 14 April 2010 diff hist +25 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 06:01, 14 April 2010 diff hist +33 N File:IV-7.dot sample Pre-Bid Conference Agenda.
- 05:59, 14 April 2010 diff hist +38 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 05:59, 14 April 2010 diff hist +46 N File:IV-6.dot sample Engineer’s construction cost estimate
- 05:57, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractor’s/DBE Firms
- 05:57, 14 April 2010 diff hist +91 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractor’s/DBE Firms
- 05:45, 14 April 2010 diff hist +5 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 05:43, 14 April 2010 diff hist +52 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 05:43, 14 April 2010 diff hist +84 N File:IV-4d.dot sample e-mail cover sheet to the Office of the Secretary of State. (Kansas Register)
- 05:41, 14 April 2010 diff hist +81 N File:IV-4c.pdf sample legal publication affidavit for the Johnson County Sun and Kansas Register
- 05:41, 14 April 2010 diff hist +24 N File:IV-4b.dot sample Notice to Bidders
- 05:41, 14 April 2010 diff hist +56 N File:IV-4a.dot sample transmittal memorandum to the City Clerk's office
- 05:39, 14 April 2010 diff hist +46 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 05:38, 14 April 2010 diff hist +6 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 05:34, 14 April 2010 diff hist +55 N File:IV-2d.xlt material testing proposal (Exhibit B). (excel version)
- 05:33, 14 April 2010 diff hist +99 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals frame|80px
- 05:30, 14 April 2010 diff hist +65 N File:IV-2h.dot Supplemental Agreement for Construction Material Testing Services
- 05:30, 14 April 2010 diff hist +53 N File:IV-2g.dot Agreement for Construction Material Testing Services.
- 05:30, 14 April 2010 diff hist +58 N File:IV-2f.dot Material Sampling and Testing Frequency Chart (Exhibit D).
- 05:30, 14 April 2010 diff hist +48 N File:IV-2e.dot material and testing specifications (Exhibit C).
- 05:30, 14 April 2010 diff hist +54 N File:IV-2d.dot material testing proposal (Exhibit B). (word version)
- 05:30, 14 April 2010 diff hist +51 N File:IV-2c.dot material testing proposal instructions (Exhibit A).
- 05:25, 14 April 2010 diff hist +42 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals
- 05:25, 14 April 2010 diff hist +22 N File:MaterialsTesting.jpg Material testing photo current
- 05:23, 14 April 2010 diff hist +27 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 05:22, 14 April 2010 diff hist +120 N File:IV-1b.xlt approved products listing for signals, street lighting, fiber optics, ITS, traffic control, pavement marking and signing
- 05:22, 14 April 2010 diff hist +31 N File:IV-1a.xlt contractor submittals checklist
- 05:21, 14 April 2010 diff hist +216 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 05:19, 14 April 2010 diff hist +23 N File:LDP Example.pdf Land Disturbance Permit
- 05:13, 14 April 2010 diff hist +52 N File:OP SWPPP Template.doc Stormwater Pollution Prevention Plan (SWPP) Template
- 05:06, 14 April 2010 diff hist +1 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 05:06, 14 April 2010 diff hist +8 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 05:05, 14 April 2010 diff hist +12 Phase III - Final Design →file:Publicmeeting.jpgTask No. 13 - Schedule Third Public Information Meeting
- 05:03, 14 April 2010 diff hist +26 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 04:55, 14 April 2010 diff hist +264 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 04:53, 14 April 2010 diff hist +88 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 04:47, 14 April 2010 diff hist +73 N File:III-22f.pdf "Example Billing" for reimbursement of Construction Engineering Services
- 04:47, 14 April 2010 diff hist +39 N File:III-22e.pdf letter from BLP accepting overhead rate
- 04:47, 14 April 2010 diff hist +34 N File:III-22d.pdf Force Account Equipment Rate Table
- 04:47, 14 April 2010 diff hist +74 N File:III-22c.pdf "Consultant Selection Guide for Construction Engineering on LPA Projects".
- 04:47, 14 April 2010 diff hist +94 N File:III-22b.pdf example of "Exhibit A" referred to in the above Proposal for Construction Engineering Services
- 04:47, 14 April 2010 diff hist +46 N File:III-22a.dot Proposal For Construction Engineering Services
- 12:19, 13 April 2010 diff hist +93 Phase III - Final Design →Task No. 18 - Request / Receive Obligation of Funds from KDOT
- 12:17, 13 April 2010 diff hist +93 N File:III-19.pdf example letter from KDOT approving Obligation of Funds and authorization to bid the contract.
- 12:17, 13 April 2010 diff hist +45 N File:III-14.dot example letter requesting Obligation of Funds
- 12:17, 13 April 2010 diff hist +14 N File:BLP-memo-99-11.PDF BLP Memo 99-11
- 12:14, 13 April 2010 diff hist +26 Phase III - Final Design →Task No. 17- Obtain Agency Plan Approvals
- 12:12, 13 April 2010 diff hist 0 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 12:12, 13 April 2010 diff hist +35 N File:III-13a.dot KDOT "Design Summary Document" form
- 12:11, 13 April 2010 diff hist +91 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 12:10, 13 April 2010 diff hist +2 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 12:09, 13 April 2010 diff hist +194 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 12:07, 13 April 2010 diff hist +81 Phase III - Final Design →Task No. 11 - Complete Utility Relocations
- 12:06, 13 April 2010 diff hist +64 Phase III - Final Design →Task No. 10 - Schedule Fourth Utility Meeting
- 12:05, 13 April 2010 diff hist +67 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:04, 13 April 2010 diff hist +350 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:00, 13 April 2010 diff hist +28 N File:BLP-memo-10-04.pdf BLP memo 10-04, Buy American
- 11:56, 13 April 2010 diff hist +241 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:50, 13 April 2010 diff hist +64 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:04, 13 April 2010 diff hist +201 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:02, 13 April 2010 diff hist +116 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:01, 13 April 2010 diff hist +46 N File:CDBG Statement of compliance.pdf Statement of Compliance, Form WH-348 (3 pages)
- 10:59, 13 April 2010 diff hist +99 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 10:56, 13 April 2010 diff hist +39 N File:CDBG Conflict of interest certification city.doc CDBG Conflict of Interest Certification
- 10:56, 13 April 2010 diff hist +14 N File:CDBG Checklist city.xls CDBG Checklist
- 10:56, 13 April 2010 diff hist +35 N File:CDBG Standards of conduct.pdf CDBG Standards of Conduct (2 pages)
- 10:56, 13 April 2010 diff hist +38 N File:CDBG Notice to all employees.pdf CDBG Notice To All Employees (2 pages)
- 10:41, 13 April 2010 diff hist +211 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 10:37, 13 April 2010 diff hist +337 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:30, 13 April 2010 diff hist +39 N File:CDBG Federal labor standards.pdf CDBG Federal labor standards provisions
- 10:30, 13 April 2010 diff hist +22 N File:CDBG Non discrimination.doc CDBG Nondiscrimination
- 10:30, 13 April 2010 diff hist +21 N File:CDBG Section 3 Clause.doc CDBG Section 3 clause
- 10:30, 13 April 2010 diff hist +47 N File:CDBG Equal employment.pdf CDBG Equal Employment Opportunity Certification
- 10:30, 13 April 2010 diff hist +37 N File:CDBG Certification-lobbying.doc CDBG Certification regarding Lobbying
- 10:30, 13 April 2010 diff hist +19 N File:CDBG Debarment.pdf CDBG Debarment form
- 10:30, 13 April 2010 diff hist +60 N File:III-11a-13.dot List of utilities and status of same for contracts over $50k
- 10:30, 13 April 2010 diff hist +52 N File:III-11a-12.dot Appointment of Service Agent for contracts over $50k
- 10:22, 13 April 2010 diff hist +42 N File:III-11a-11.dot Special Conditions for contracts over $50k
- 10:22, 13 April 2010 diff hist +57 N File:III-9a-10b.dot Table of Contents (CDBG projects) for contracts over $50k
- 10:22, 13 April 2010 diff hist +57 N File:III-9a-10a.dot Table of Contents (KDOT projects) for contracts over $50k
- 10:22, 13 April 2010 diff hist +40 N File:III-11a-8.dot Performance Bond for contracts over $50k
- 10:22, 13 April 2010 diff hist +41 N File:III-11a-10.dot Table of Contents for contracts over $50k
- 10:22, 13 April 2010 diff hist +38 N File:III-11a-9.dot Statutory Bond for contracts over $50k
- 10:22, 13 April 2010 diff hist +55 N File:III-11a-7.dot Labor and Material Payment Bond for contracts over $50k
- 10:22, 13 April 2010 diff hist +48 N File:III-9a-6b.dot Notice to bidders (CDBG) for contracts over $50k
- 10:22, 13 April 2010 diff hist +48 N File:III-9a-6a.dot Notice to bidders (KDOT) for contracts over $50k
- 10:22, 13 April 2010 diff hist +41 N File:III-11a-6.dot Notice to bidders for contracts over $50k
- 10:22, 13 April 2010 diff hist +41 N File:III-11a-5.dot Insurance Options for contracts over $50k
- 10:22, 13 April 2010 diff hist +56 N File:III-9a-4c.dot Instructions to bidders Option C for contracts over $50k
- 10:22, 13 April 2010 diff hist +56 N File:III-9a-4b.dot Instructions to bidders Option B for contracts over $50k
- 10:22, 13 April 2010 diff hist +56 N File:III-9a-4a.dot Instructions to bidders Option A for contracts over $50k
- 10:22, 13 April 2010 diff hist +42 N File:III-9a-3.dot General Conditions for contracts over $50k
- 10:22, 13 April 2010 diff hist +43 N File:III-9a-2b.dot Bid (CDBG projects) for contracts over $50k
- 10:22, 13 April 2010 diff hist +43 N File:III-9a-2a.dot Bid (KDOT projects) for contracts over $50k
- 10:22, 13 April 2010 diff hist +27 N File:III-11a-2.dot Bid for contracts over $50k
- 10:22, 13 April 2010 diff hist +33 N File:III-11a-1.dot Agreement for contracts over $50k
- 10:06, 13 April 2010 diff hist +2 Phase III - Final Design →Notes
- 09:49, 13 April 2010 diff hist +15 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 09:47, 13 April 2010 diff hist +54 N File:III-13b.pdf example of a completed KDOT "Design Summary Document".
- 08:38, 13 April 2010 diff hist +5 Template:Navbar
- 08:30, 13 April 2010 diff hist −2 Template:Navbar
- 08:29, 13 April 2010 diff hist −28 Template:Navbar
- 08:29, 13 April 2010 diff hist −1 Template:Navbar
- 08:28, 13 April 2010 diff hist +31 Template:Navbar
- 07:29, 13 April 2010 diff hist 0 Template:Note2 current
- 07:28, 13 April 2010 diff hist +2 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 07:27, 13 April 2010 diff hist +158 N Template:Note2 Created page with '{|style="background:#D4FFD4; color:#002AFF" align="center" border="0" cellpadding="5" width="70%" |- |50px||'''Note:''' {{{1}}} |}'
- 06:58, 13 April 2010 diff hist +17 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 06:57, 13 April 2010 diff hist +13 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 06:55, 13 April 2010 diff hist +26 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 06:51, 13 April 2010 diff hist +35 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 06:51, 13 April 2010 diff hist +101 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 06:49, 13 April 2010 diff hist +38 N File:III-9-4c.dot Instructions to Contractors - Option C
- 06:48, 13 April 2010 diff hist +38 N File:III-9-4b.dot Instructions to Contractors - Option B
- 06:35, 13 April 2010 diff hist +177 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 06:31, 13 April 2010 diff hist +57 N File:III-9-10.dot List of utilities and status of same contracts under $50k
- 06:31, 13 April 2010 diff hist +49 N File:III-9-9.dot Appointment of Service Agent contracts under $50k
- 06:31, 13 April 2010 diff hist +39 N File:III-9-8.dot Special conditions contracts under $50k
- 06:31, 13 April 2010 diff hist +38 N File:III-9-7.dot Table of Contents contracts under $50k
- 06:31, 13 April 2010 diff hist +37 N File:III-9-6.dot Performance Bond contracts under $50k
- 06:31, 13 April 2010 diff hist +52 N File:III-9-5.dot Labor and Material Payment Bond contracts under $50k
- 06:31, 13 April 2010 diff hist +60 N File:III-9-4a.dot Instructions to Contractors - Option A contracts under $50k
- 06:31, 13 April 2010 diff hist +43 N File:III-9-3.dot General conditions for contracts under $50k
- 06:31, 13 April 2010 diff hist +33 N File:III-9-2.dot Proposal for contracts under $50k
- 06:31, 13 April 2010 diff hist +34 N File:III-9-1.dot Agreement for contracts under $50k
- 06:31, 13 April 2010 diff hist +54 N File:Contract bidding schedules.dot Guidance for planning bid and contract award schedules
- 06:31, 13 April 2010 diff hist +44 N File:Detailed procedures contract prep.dot Detailed Procedures for Contract Preparation
- 06:31, 13 April 2010 diff hist +30 N File:BLP-memo-04-07.pdf Procedures for DBE Involvement
- 06:15, 13 April 2010 diff hist +180 Phase III - Final Design →Task No. 8 - Submit Specifications and Special Provisions
- 06:12, 13 April 2010 diff hist +43 N File:Using MakeSpec-Instructions.doc Instructions for using the program MakeSpec
- 06:11, 13 April 2010 diff hist +123 N File:III-10c.pdf List of proprietary items for Traffic Signals and Street Lighting to be used in the preparation of plans and specifications
- 06:11, 13 April 2010 diff hist +50 N File:III-10a.pdf sample of City Specifications for a street project
- 06:09, 13 April 2010 diff hist +46 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 06:07, 13 April 2010 diff hist +38 N File:ESC Plan Review Checklist.doc Erosion and Sediment Control Checklist
- 06:05, 13 April 2010 diff hist +3 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 06:04, 13 April 2010 diff hist +254 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 05:59, 13 April 2010 diff hist +52 N File:BLP-memo-06-06.pdf list of information is to be submitted with the PS&E
- 05:59, 13 April 2010 diff hist +44 N File:BLP-memo-06-05.pdf information pertaining to Final Check Plans.
- 05:59, 13 April 2010 diff hist +112 N File:III-7a.pdf letter from CARS accepting plans along with additional information and requirements prior to advertising project
- 05:55, 13 April 2010 diff hist +53 N File:ESC PW Process.doc Erosion and Sediment Control Process for Public Works
- 05:49, 13 April 2010 diff hist +6 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 05:49, 13 April 2010 diff hist +31 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 05:48, 13 April 2010 diff hist +159 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 05:45, 13 April 2010 diff hist +57 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 05:44, 13 April 2010 diff hist +150 N File:III-8d.dot KDOT Form 1306 - Certification By the City to the Kansas Department of Transportation of Real Property Acquisition Procedures and Utility Arrangements
- 05:44, 13 April 2010 diff hist +153 N File:III-8c.dot KDOT Form 1304 - List of Utilities & Status. (example template) Note: All utilities from Phase II task 9 should be considered when completing form 1304.
- 05:44, 13 April 2010 diff hist +92 N File:III-8b.pdf KDOT Memo B.R.U.D. 84-10 regarding Status of Utility and Railroad Agreements and Adjustments
- 05:44, 13 April 2010 diff hist +116 N File:III-8a.pdf memo from the U.S. Department of Transportation regarding Status of Utility and Railroad Agreements and Adjustments.
- 05:41, 13 April 2010 diff hist +28 Phase III - Final Design →Task No. 4 - Begin Condemnation Process
- 05:40, 13 April 2010 diff hist +47 N File:III-4a.dot Example transmittal memo condemnation documents
- 05:40, 13 April 2010 diff hist +29 N File:III-8.dot Steps in condemnation process
- 05:38, 13 April 2010 diff hist +33 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:37, 13 April 2010 diff hist +133 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:33, 13 April 2010 diff hist +27 N File:III-5b.dot Sample Log of owner contact
- 05:33, 13 April 2010 diff hist +35 N File:III-5a.dot Real Property Acquisition Checklist
- 05:28, 13 April 2010 diff hist −2 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:28, 13 April 2010 diff hist −68 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:26, 13 April 2010 diff hist −13 Phase III - Final Design →Notes
- 05:25, 13 April 2010 diff hist +15 Phase III - Final Design →Notes
- 05:25, 13 April 2010 diff hist +1 Phase III - Final Design →Notes
- 05:25, 13 April 2010 diff hist −16 Phase III - Final Design →Notes
- 05:21, 13 April 2010 diff hist 0 Phase III - Final Design →Notes
- 05:21, 13 April 2010 diff hist +12 Phase III - Final Design →Notes
- 05:20, 13 April 2010 diff hist +1 Phase III - Final Design →Notes
- 05:19, 13 April 2010 diff hist +102 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:09, 13 April 2010 diff hist +54 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 05:08, 13 April 2010 diff hist −32 Phase III - Final Design →References
- 05:06, 13 April 2010 diff hist +71 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:15, 12 April 2010 diff hist −1 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:13, 12 April 2010 diff hist +61 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:10, 12 April 2010 diff hist +32 Phase III - Final Design
- 15:10, 12 April 2010 diff hist −14 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 14:58, 12 April 2010 diff hist +79 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 13:37, 12 April 2010 diff hist +43 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 13:35, 12 April 2010 diff hist +1 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 13:35, 12 April 2010 diff hist 0 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 13:34, 12 April 2010 diff hist +166 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 13:33, 12 April 2010 diff hist 0 N File:BLP-memo-06-01.pdf
- 13:33, 12 April 2010 diff hist 0 N File:BLP-memo-97-01.pdf
- 13:33, 12 April 2010 diff hist 0 N File:BLP-memo-92-15.pdf
- 13:28, 12 April 2010 diff hist +54 N File:III-2d.pdf sample utility agreement for Magellan Pipeline Company
- 13:27, 12 April 2010 diff hist +135 Phase III - Final Design →Task No. 2 - Execute Utility Agreements
- 13:27, 12 April 2010 diff hist +45 N File:III-2f.dot sample sanitary sewer line crossing agreement
- 13:27, 12 April 2010 diff hist +45 N File:III-2e.pdf sample sanitary sewer line crossing agreement
- 13:27, 12 April 2010 diff hist +67 N File:III-2b.pdf sample utility agreement for Water District No. 1 of Johnson County
- 13:27, 12 April 2010 diff hist +33 N File:III-2a.pdf sample utility agreement for KCPL
- 12:42, 12 April 2010 diff hist +36 File:III-1c.pdf
- 12:42, 12 April 2010 diff hist 0 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:42, 12 April 2010 diff hist +53 N File:III-1d.dot sample City staff letter to KCPL approving work order
- 12:41, 12 April 2010 diff hist 0 N File:III-1c.pdf
- 12:40, 12 April 2010 diff hist 0 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:40, 12 April 2010 diff hist +162 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:40, 12 April 2010 diff hist +53 N File:Iii-2d.pdf sample City staff letter to KCPL approving work order
- 12:40, 12 April 2010 diff hist +36 N File:III-2c.pdf sample City approved KCPL work order
- 12:40, 12 April 2010 diff hist +40 N File:III-1b.pdf sample work order cover letter from KCPL
- 12:40, 12 April 2010 diff hist +43 N File:III-1a.dot sample letter to KCPL requesting work order
- 12:40, 12 April 2010 diff hist +47 N File:III-1.dot Utility Relocation Plan Submission Requirements
- 08:11, 12 April 2010 diff hist −4 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 08:10, 12 April 2010 diff hist +59 N Template:Exhibit2 Created page with '::[[Media:{{{1}}}|'''Exhibit''' '''{{{2}}}''']] ''{{{3}}}''' current
- 08:04, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 08:01, 12 April 2010 diff hist +20 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 07:59, 12 April 2010 diff hist +63 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 07:56, 12 April 2010 diff hist +25 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 07:53, 12 April 2010 diff hist +5 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 07:53, 12 April 2010 diff hist +6 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 07:52, 12 April 2010 diff hist +29 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 07:49, 12 April 2010 diff hist +10 Phase II - Preliminary Design →Task No. 35 - Schedule Second Public Information Meeting
- 07:48, 12 April 2010 diff hist +46 Phase II - Preliminary Design →Task No. 35 - Schedule Second Public Information Meeting
- 07:48, 12 April 2010 diff hist +22 N File:II-34c.dot public meeting handout
- 07:48, 12 April 2010 diff hist +28 N File:II-34b.dot public meeting sign in sheet
- 07:48, 12 April 2010 diff hist +44 N File:II-34a.dot example Notice of Public Information Meeting
- 07:45, 12 April 2010 diff hist +122 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 07:45, 12 April 2010 diff hist +54 N File:II-34zz.dot Easement Acquisition Agreement - City of Overland Park
- 07:45, 12 April 2010 diff hist +60 N File:II-34z.dot Right of Way Purchase Contract - Johnson County Public Works
- 07:45, 12 April 2010 diff hist +46 N File:II-34y.dot Utility Easement - City Grantor & City Grantee
- 07:45, 12 April 2010 diff hist +31 N File:II-34x.dot Utility Easement - City Grantee
- 07:45, 12 April 2010 diff hist +31 N File:II-34w.dot Utility Easement - City Grantor
- 07:45, 12 April 2010 diff hist +21 N File:II-34vv.dot Street Light Easement
- 07:45, 12 April 2010 diff hist +23 N File:II-34v.dot Traffic Signal Easement
- 07:45, 12 April 2010 diff hist +56 N File:II-34u.dot Notice of Termination of Temporary Construction Easement
- 07:45, 12 April 2010 diff hist +51 N File:II-34t.dot Temporary Construction Easement - Grading Version 2
- 07:45, 12 April 2010 diff hist +51 N File:II-34s.dot Temporary Construction Easement - Grading Version 1
- 07:45, 12 April 2010 diff hist +46 N File:II-34r.dot Temporary Construction Easement - City Grantee
- 07:45, 12 April 2010 diff hist +45 N File:II-34q.dot emporary Construction Easement - City Grantor
- 07:37, 12 April 2010 diff hist +17 N File:II-34p.dot Sidewalk Variance
- 07:37, 12 April 2010 diff hist +17 N File:II-34o.dot Sidewalk Easement
- 07:37, 12 April 2010 diff hist +23 N File:II-34n.dot Retaining Wall Easement
- 07:37, 12 April 2010 diff hist +31 N File:II-34m.dot Permanent Right of Way Easement
- 07:37, 12 April 2010 diff hist +57 N File:II-34l.dot Permanent Drainage Easement - City Grantor & City Grantee
- 07:37, 12 April 2010 diff hist +42 N File:II-34k.dot Permanent Drainage Easement - City Grantee
- 07:37, 12 April 2010 diff hist +42 N File:II-34j.dot Permanent Drainage Easement - City Grantor
- 07:37, 12 April 2010 diff hist +42 N File:III-5d.dot Real Estate Mortgage Release - Corporation
- 07:37, 12 April 2010 diff hist +41 N File:III-5c.dot Real Estate Mortgage Release - Individual
- 07:37, 12 April 2010 diff hist +15 N File:II-34g.dot Quit Claim Deed
- 07:37, 12 April 2010 diff hist +18 N File:II-34e.dot Deed of Dedication
- 07:37, 12 April 2010 diff hist +21 N File:II-34d.dot Construction Easement