- 14:40, 9 June 2021 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of File:II-3o.xlsx
- 08:41, 26 April 2021 diff hist 0 File:IV-5l Plan Rooms.docx Irina Idelson uploaded a new version of File:IV-5l Plan Rooms.docx
- 08:40, 26 April 2021 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of File:IV-5j.docx
- 08:39, 26 April 2021 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of File:IV-5i.docx
- 08:38, 26 April 2021 diff hist 0 File:IV-5h.docx Irina Idelson uploaded a new version of File:IV-5h.docx
- 08:37, 26 April 2021 diff hist 0 File:IV-5g.docx Irina Idelson uploaded a new version of File:IV-5g.docx
- 08:35, 26 April 2021 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of File:IV-5f.docx
- 08:34, 26 April 2021 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of File:IV-5e.docx
- 08:31, 26 April 2021 diff hist 0 File:IV-5d.docx Irina Idelson uploaded a new version of File:IV-5d.docx
- 08:30, 26 April 2021 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of File:IV-5c.docx
- 08:28, 26 April 2021 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 08:25, 26 April 2021 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 08:20, 26 April 2021 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of File:II-3o.xlsx
- 08:20, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:19, 31 March 2021 diff hist +30 N File:Thoroughfare Interim Sections Jan-2021.pdf Interim Sections current
- 08:19, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:18, 31 March 2021 diff hist +38 N File:Thoroughfare Ultimate 2-Lane Sections Jan-2021.pdf Ultimate 2-Lane Sections current
- 08:17, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:16, 31 March 2021 diff hist +45 N File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2021.pdf Ultimate 4- and 3-lane Sections current
- 09:00, 11 March 2021 diff hist −10 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 09:00, 26 February 2021 diff hist 0 File:1306 last page OP note.pdf Irina Idelson uploaded a new version of File:1306 last page OP note.pdf current
- 14:57, 25 February 2021 diff hist +1 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:07, 25 February 2021 diff hist +117 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 12:57, 25 February 2021 diff hist +48 N File:1306 last page OP note.pdf Form 1306 - last page with OP note
- 12:44, 25 February 2021 diff hist +49 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 03:41, 15 February 2021 diff hist +15 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:39, 29 December 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 10:00, 24 December 2020 diff hist −393 Condemnation Process →Condemnation Process
- 09:56, 24 December 2020 diff hist −78 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:51, 24 December 2020 diff hist +36 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:50, 24 December 2020 diff hist +58 N File:V-13i random numbers for concrete testing.xls Random number generator for Concrete testing current
- 09:47, 24 December 2020 diff hist +35 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:47, 24 December 2020 diff hist +57 N File:V-13h random numbers for asphalt testing.xls Random number generator for Asphalt testing current
- 09:44, 24 December 2020 diff hist +35 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:43, 24 December 2020 diff hist +57 N File:V-13g random numbers for fly ash testing.xls Random number generator for Fly Ash testing current
- 09:41, 24 December 2020 diff hist +37 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:40, 24 December 2020 diff hist +59 N File:V-13f random numbers for earthwork testing.xls Random number generator for Earthwork testing current
- 09:32, 24 December 2020 diff hist +28 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:31, 24 December 2020 diff hist +116 N File:V-13e Concrete Unit Weight Calcs.xlsx Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results current
- 09:19, 24 December 2020 diff hist +14 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:17, 24 December 2020 diff hist +68 N File:V-13d Material Testing Recap Log.docx City's Material Testing Recap Log Sheet (word format). current
- 09:14, 24 December 2020 diff hist −6 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:13, 24 December 2020 diff hist +62 N File:V-13b Material Testing Log.xlsx City's Material Testing Log Sheet (excel format) current
- 09:00, 24 December 2020 diff hist +22 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:59, 24 December 2020 diff hist +61 N File:V-13c Material Testing Log.docx City's Material Testing Log Sheet (word format) current
- 08:56, 24 December 2020 diff hist +28 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:55, 24 December 2020 diff hist +62 N File:V-13b material testing log excel.xlsx City's Material Testing Log Sheet (excel format) current
- 08:52, 24 December 2020 diff hist 0 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:27, 24 December 2020 diff hist +10 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:37, 23 December 2020 diff hist +73 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:32, 23 December 2020 diff hist −16 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:31, 23 December 2020 diff hist +39 N File:Project Data Sheet.pdf City's Project Data Sheet current
- 13:26, 23 December 2020 diff hist −66 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 13:24, 23 December 2020 diff hist +35 N File:Project Cost Estimate 11-20-2015.pdf Project Cost Estimate current
- 12:51, 23 December 2020 diff hist −521 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 15:10, 17 December 2020 diff hist −1 Phase III - Final Design →Task No. 6 - Begin Condemnation Process
- 15:09, 17 December 2020 diff hist −139 Phase III - Final Design →Task No. 6 - Begin Condemnation Process
- 14:53, 17 December 2020 diff hist +1,899 Condemnation Process →Steps in the Eminent Domain Process Involving Public Works
- 12:17, 17 December 2020 diff hist +24 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 12:14, 17 December 2020 diff hist +6 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 12:13, 17 December 2020 diff hist −33 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 09:11, 17 December 2020 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:39, 17 December 2020 diff hist +1 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 12:45, 16 December 2020 diff hist 0 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 12:44, 16 December 2020 diff hist −138 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 08:16, 14 December 2020 diff hist −11 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:20, 11 December 2020 diff hist +41 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 10:07, 1 December 2020 diff hist 0 File:V-4c Contract Documents and Plan Distribution.docx Irina Idelson uploaded a new version of File:V-4c Contract Documents and Plan Distribution.docx current
- 16:59, 16 November 2020 diff hist −59 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:53, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:52, 16 November 2020 diff hist +69 N File:V-4d Contract Documents and Plan Distribution.docx Irina Idelson moved page File:V-4d Contract Documents and Plan Distribution.docx to File:V-4c Contract Documents and Plan Distribution.docx current Tag: New redirect
- 16:52, 16 November 2020 diff hist 0 m File:V-4c Contract Documents and Plan Distribution.docx Irina Idelson moved page File:V-4d Contract Documents and Plan Distribution.docx to File:V-4c Contract Documents and Plan Distribution.docx
- 16:51, 16 November 2020 diff hist −131 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:50, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:50, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:49, 16 November 2020 diff hist +50 N File:V-4c CARS Notice to Proceed.pdf Irina Idelson moved page File:V-4c CARS Notice to Proceed.pdf to File:V-4b CARS Notice to Proceed.pdf current Tag: New redirect
- 16:49, 16 November 2020 diff hist 0 m File:V-4b CARS Notice to Proceed.pdf Irina Idelson moved page File:V-4c CARS Notice to Proceed.pdf to File:V-4b CARS Notice to Proceed.pdf current
- 16:48, 16 November 2020 diff hist −72 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:44, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:44, 16 November 2020 diff hist +68 N File:V-4b Sample Transmittal Letter to Contractor.docx Irina Idelson moved page File:V-4b Sample Transmittal Letter to Contractor.docx to File:V-4a Sample Transmittal Letter to Contractor.docx current Tag: New redirect
- 16:44, 16 November 2020 diff hist 0 m File:V-4a Sample Transmittal Letter to Contractor.docx Irina Idelson moved page File:V-4b Sample Transmittal Letter to Contractor.docx to File:V-4a Sample Transmittal Letter to Contractor.docx current
- 16:16, 16 November 2020 diff hist +80 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractors/DBE Firms
- 17:32, 13 November 2020 diff hist 0 File:Sample Acquisition Notes.pdf Irina Idelson uploaded a new version of File:Sample Acquisition Notes.pdf current
- 16:14, 13 November 2020 diff hist −23 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:59, 30 October 2020 diff hist +30 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:59, 30 October 2020 diff hist +49 N File:III-5a Property Acqusition Checklist.docx Real Property Acquisition Checklist current
- 14:55, 30 October 2020 diff hist +15 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:54, 30 October 2020 diff hist +20 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:32, 30 October 2020 diff hist +49 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:31, 30 October 2020 diff hist +111 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:27, 30 October 2020 diff hist +64 N File:Appraiser inspection letter.pdf Inspection Letter from Appraiser to Property Owner current
- 14:25, 30 October 2020 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:23, 30 October 2020 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:23, 30 October 2020 diff hist +29 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:22, 30 October 2020 diff hist +55 N File:III-5d Mortgage Release Individual.docx Real Estate Mortgage Release - Individual current
- 14:19, 30 October 2020 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:19, 30 October 2020 diff hist +29 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:18, 30 October 2020 diff hist +56 N File:III-5e Mortgage Release Corporation.docx Real Estate Mortgage Release - Corporation current
- 14:14, 30 October 2020 diff hist +172 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 10:55, 30 October 2020 diff hist +192 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 10:39, 30 October 2020 diff hist 0 File:RFQ Appraisal Acquisition.pdf Irina Idelson uploaded a new version of File:RFQ Appraisal Acquisition.pdf current
- 10:25, 30 October 2020 diff hist −4 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:22, 30 October 2020 diff hist +60 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:19, 30 October 2020 diff hist +83 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 14:33, 22 October 2020 diff hist +31 N File:Phase V Checklist.docx Phase v Checklist current
- 14:23, 22 October 2020 diff hist −14 Checklist Phase V current
- 13:53, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 13:42, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 13:40, 22 October 2020 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of File:Phase III Checklist.docx current
- 13:39, 22 October 2020 diff hist 0 File:Phase II Checklist.docx Irina Idelson uploaded a new version of File:Phase II Checklist.docx
- 13:37, 22 October 2020 diff hist 0 File:Phase I Checklist.docx Irina Idelson uploaded a new version of File:Phase I Checklist.docx current
- 13:35, 22 October 2020 diff hist 0 File:Phase VI Checklist.docx Irina Idelson uploaded a new version of File:Phase VI Checklist.docx
- 13:20, 22 October 2020 diff hist −8 Phase V - Construction
- 11:45, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 11:24, 22 October 2020 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of File:Phase III Checklist.docx
- 11:17, 22 October 2020 diff hist 0 File:Phase II Checklist.docx Irina Idelson uploaded a new version of File:Phase II Checklist.docx
- 15:28, 28 September 2020 diff hist +36 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:56, 28 September 2020 diff hist +14 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 14:47, 28 September 2020 diff hist +14 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:46, 28 September 2020 diff hist +35 N File:Project Cost Estimate.pdf Project Cost Estimate current
- 14:45, 28 September 2020 diff hist +11 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:44, 28 September 2020 diff hist +40 N File:Project Cost Memo.pdf Project Cost Estimate memo current
- 14:40, 28 September 2020 diff hist +49 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 13:34, 28 September 2020 diff hist +15 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 13:32, 28 September 2020 diff hist +31 N File:Sample Acquisition Notes.pdf Acquisition Notes
- 13:15, 28 September 2020 diff hist +43 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:57, 28 September 2020 diff hist −1 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 08:43, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson reverted File:III-11-1 Agreement.docx to an old version current
- 08:41, 31 August 2020 diff hist +40 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:39, 31 August 2020 diff hist +50 N File:III-11a-6 Notice to Bidders (hard copy bids).docx Notice to Bidders for Hard Copy Bids current
- 08:26, 31 August 2020 diff hist 0 File:III-11a-10b Table of Contents CDBG.docx Irina Idelson uploaded a new version of File:III-11a-10b Table of Contents CDBG.docx current
- 08:25, 31 August 2020 diff hist +9 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:24, 31 August 2020 diff hist +49 N File:III-11a-10a Table of Contents KDOT Projects.docx Table of Contents for KDOT Projects
- 08:22, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:21, 31 August 2020 diff hist +31 N File:III-11a-10 Table of Contents.docx Table of Contents current
- 08:20, 31 August 2020 diff hist 0 File:III-11a-9 Statutory Bond.docx Irina Idelson uploaded a new version of File:III-11a-9 Statutory Bond.docx current
- 08:17, 31 August 2020 diff hist 0 File:III-11a-8a Maintenance Bond.docx Irina Idelson uploaded a new version of File:III-11a-8a Maintenance Bond.docx current
- 08:15, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:14, 31 August 2020 diff hist +30 N File:III-11a-8 Performance Bond.docx Performance Bond current
- 08:12, 31 August 2020 diff hist +32 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:12, 31 August 2020 diff hist +45 N File:III-11a-7 Labor and Material Payment Bond.docx Labor and Material Payment Bond current
- 08:08, 31 August 2020 diff hist 0 File:III-11a-3 General Conditions.docx Irina Idelson uploaded a new version of File:III-11a-3 General Conditions.docx
- 08:06, 31 August 2020 diff hist +25 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:06, 31 August 2020 diff hist +17 N File:III-11a-2 Bid - use for hard copy bids.docx Bid current
- 07:44, 31 August 2020 diff hist 0 File:III-11a-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11a-1 Agreement.docx current
- 07:41, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11-1 Agreement.docx
- 13:52, 27 August 2020 diff hist +29 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 16:43, 26 August 2020 diff hist −2 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:43, 26 August 2020 diff hist −54 Phase IV - Pre-Construction
- 16:42, 26 August 2020 diff hist +56 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:34, 26 August 2020 diff hist −55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:33, 26 August 2020 diff hist +55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 14:32, 26 August 2020 diff hist +3 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 14:24, 26 August 2020 diff hist −4 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 14:03, 26 August 2020 diff hist −35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 13:45, 26 August 2020 diff hist +35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 09:48, 26 August 2020 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 09:18, 26 August 2020 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:23, 20 August 2020 diff hist −88 Phase V - Construction →Task No. 2 - Submit Agency Cash Flow Projection
- 11:47, 18 August 2020 diff hist +23 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 11:46, 18 August 2020 diff hist +43 N File:VI-1d project close out SMAC.docx Project Close Out Form - SMAC current
- 07:04, 31 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 07:03, 31 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 14:45, 29 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 14:44, 29 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 13:42, 13 July 2020 diff hist −1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:41, 13 July 2020 diff hist +1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:34, 13 July 2020 diff hist +2 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 15:21, 9 July 2020 diff hist −102 Condemnation Process
- 14:09, 9 July 2020 diff hist −12 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:05, 9 July 2020 diff hist −113 Planning Bid and Contract Award Schedules current
- 09:09, 9 July 2020 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:33, 8 July 2020 diff hist −21 Preparation of Construction Bid Documents →General Comments current
- 13:31, 8 July 2020 diff hist +83 Preparation of Construction Bid Documents →General Comments
- 10:28, 8 July 2020 diff hist 0 Preparation of Construction Bid Documents
- 10:26, 8 July 2020 diff hist +73 Preparation of Construction Bid Documents
- 14:18, 6 July 2020 diff hist −1,051 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 13:00, 6 July 2020 diff hist +7 Template:Green
- 12:58, 6 July 2020 diff hist −957 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 12:05, 6 July 2020 diff hist −17 Template:Green
- 11:58, 6 July 2020 diff hist +1,162 N Template:Green Created page with "{|style="background:#D4FFD4; color:#002AFF" align="center" border="0" cellpadding="5" width="80%" |- ||'''For KDOT projects''' - '''often changes occur during construction of..."
- 15:38, 1 July 2020 diff hist +28 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 15:37, 1 July 2020 diff hist +52 N File:II-3h Memo to Selection Committee.pdf Memo to Consultant Selection Committee current
- 08:42, 1 July 2020 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 08:30, 1 July 2020 diff hist +143 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 16:55, 30 June 2020 diff hist −1,034 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:47, 30 June 2020 diff hist +84 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:45, 30 June 2020 diff hist −4 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:33, 30 June 2020 diff hist +965 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 11:02, 29 June 2020 diff hist +10 Approved Materials - Concrete Work →Pavement Repair
- 10:59, 29 June 2020 diff hist +145 Approved Materials - Concrete Work →Pavement Repair
- 15:12, 26 June 2020 diff hist −31 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 14:48, 26 June 2020 diff hist +122 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 11:46, 26 June 2020 diff hist +593 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 11:34, 26 June 2020 diff hist +1 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:34, 26 June 2020 diff hist +36 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:32, 26 June 2020 diff hist +28 N File:Metcalf at 167th before during after.pdf Project Photos current
- 16:11, 25 June 2020 diff hist +1 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:09, 25 June 2020 diff hist +74 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:06, 25 June 2020 diff hist +19 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:05, 25 June 2020 diff hist +47 N File:VI-1e Utility Relocation Invoice.pdf Sample Utility Relocation Invoice current
- 16:03, 25 June 2020 diff hist +331 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 15:55, 25 June 2020 diff hist −24 Phase V - Construction →Task No. 22 - Project Completion Certification and Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 15:49, 25 June 2020 diff hist +38 N File:Punch List.pdf Irina Idelson moved page File:Punch List.pdf to File:V-17 Punch List.pdf current Tag: New redirect
- 15:49, 25 June 2020 diff hist 0 m File:V-17 Punch List.pdf Irina Idelson moved page File:Punch List.pdf to File:V-17 Punch List.pdf current
- 15:47, 25 June 2020 diff hist +6 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:46, 25 June 2020 diff hist +31 N File:V-17 Punch List.pdf Sample Punch List
- 15:42, 25 June 2020 diff hist +56 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:27, 25 June 2020 diff hist +33 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:27, 25 June 2020 diff hist +49 N File:Breakout of Construction Costs Revised.pdf Final Breakout of Construction Cost current
- 15:26, 25 June 2020 diff hist +14 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:25, 25 June 2020 diff hist +32 N File:DBE Summary Report.docx DBE Summary Report current
- 15:19, 25 June 2020 diff hist +22 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:19, 25 June 2020 diff hist +47 N File:Completion Letter to KDOT.docx Project Completion Letter to KDOT current
- 14:58, 25 June 2020 diff hist −26 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:54, 25 June 2020 diff hist −74 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:47, 25 June 2020 diff hist +20 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:47, 25 June 2020 diff hist +45 N File:V-15a Change Order-Blank.docx Change Order Form - Word format current
- 14:46, 25 June 2020 diff hist +20 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:45, 25 June 2020 diff hist +46 N File:V-15b Change Order-Blank.xlsx Change Order Form - Excel format current
- 14:41, 25 June 2020 diff hist −11 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:10, 25 June 2020 diff hist +15 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 13:48, 25 June 2020 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:47, 25 June 2020 diff hist +35 N File:V-14a Pay Estimate with DBE.xlsx Pay Estimate with DBE current
- 13:45, 25 June 2020 diff hist −12 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:44, 25 June 2020 diff hist +53 N File:V-14 Pay Estimate.xlsx Pay Estimate Template with Instructions current
- 11:14, 25 June 2020 diff hist +30 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 11:13, 25 June 2020 diff hist +42 N File:Notice of Termination Packet Signed.pdf Notice of Termination Packet current
- 09:23, 25 June 2020 diff hist −1 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 09:22, 25 June 2020 diff hist −117 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 09:22, 25 June 2020 diff hist +36 Phase IV - Pre-Construction →Task No. 16 - Request Bid Approval from KDOT
- 09:22, 25 June 2020 diff hist +82 Phase IV - Pre-Construction →Task No. 16 - Request Bid Approval from KDOT
- 09:20, 25 June 2020 diff hist +29 N File:IV-17a.pdf Irina Idelson moved page File:IV-17a.pdf to File:IV-16c.pdf current Tag: New redirect
- 09:20, 25 June 2020 diff hist 0 m File:IV-16c.pdf Irina Idelson moved page File:IV-17a.pdf to File:IV-16c.pdf current
- 16:11, 24 June 2020 diff hist −1 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:11, 24 June 2020 diff hist +90 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:09, 24 June 2020 diff hist +113 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:00, 24 June 2020 diff hist +3 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:51, 24 June 2020 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of File:IV-5j.docx
- 15:29, 24 June 2020 diff hist +16 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:29, 24 June 2020 diff hist +33 N File:Change Order executed.pdf Sample Change Order current
- 15:19, 24 June 2020 diff hist +114 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 15:12, 24 June 2020 diff hist +57 N File:V-11d Sample Transmittal Letter.pdf Sample Transmittal Letter to the Contractor current
- 13:30, 24 June 2020 diff hist +163 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 13:10, 24 June 2020 diff hist −5 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 13:09, 24 June 2020 diff hist +55 N File:Pre-construction agenda.docx Sample of Pre-Construction Meeting Agenda current
- 10:39, 24 June 2020 diff hist −14 Phase V - Construction →Task No. 12 - On-Going Inspections
- 10:38, 24 June 2020 diff hist +35 N File:LPASiteVisitChecklist KDOT.docx Site Visits Checklist current
- 10:27, 24 June 2020 diff hist +24 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 10:26, 24 June 2020 diff hist +67 N File:Consultant Selection Guide 2019.pdf Consultant Selection Guide - Construction Engineering current