- 08:57, 28 September 2020 diff hist −1 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 08:43, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson reverted File:III-11-1 Agreement.docx to an old version current
- 08:41, 31 August 2020 diff hist +40 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:39, 31 August 2020 diff hist +50 N File:III-11a-6 Notice to Bidders (hard copy bids).docx Notice to Bidders for Hard Copy Bids current
- 08:26, 31 August 2020 diff hist 0 File:III-11a-10b Table of Contents CDBG.docx Irina Idelson uploaded a new version of File:III-11a-10b Table of Contents CDBG.docx current
- 08:25, 31 August 2020 diff hist +9 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:24, 31 August 2020 diff hist +49 N File:III-11a-10a Table of Contents KDOT Projects.docx Table of Contents for KDOT Projects
- 08:22, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:21, 31 August 2020 diff hist +31 N File:III-11a-10 Table of Contents.docx Table of Contents current
- 08:20, 31 August 2020 diff hist 0 File:III-11a-9 Statutory Bond.docx Irina Idelson uploaded a new version of File:III-11a-9 Statutory Bond.docx current
- 08:17, 31 August 2020 diff hist 0 File:III-11a-8a Maintenance Bond.docx Irina Idelson uploaded a new version of File:III-11a-8a Maintenance Bond.docx current
- 08:15, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:14, 31 August 2020 diff hist +30 N File:III-11a-8 Performance Bond.docx Performance Bond current
- 08:12, 31 August 2020 diff hist +32 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:12, 31 August 2020 diff hist +45 N File:III-11a-7 Labor and Material Payment Bond.docx Labor and Material Payment Bond current
- 08:08, 31 August 2020 diff hist 0 File:III-11a-3 General Conditions.docx Irina Idelson uploaded a new version of File:III-11a-3 General Conditions.docx
- 08:06, 31 August 2020 diff hist +25 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:06, 31 August 2020 diff hist +17 N File:III-11a-2 Bid - use for hard copy bids.docx Bid current
- 07:44, 31 August 2020 diff hist 0 File:III-11a-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11a-1 Agreement.docx current
- 07:41, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11-1 Agreement.docx
- 13:52, 27 August 2020 diff hist +29 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 16:43, 26 August 2020 diff hist −2 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:43, 26 August 2020 diff hist −54 Phase IV - Pre-Construction
- 16:42, 26 August 2020 diff hist +56 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:34, 26 August 2020 diff hist −55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:33, 26 August 2020 diff hist +55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 14:32, 26 August 2020 diff hist +3 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 14:24, 26 August 2020 diff hist −4 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 14:03, 26 August 2020 diff hist −35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 13:45, 26 August 2020 diff hist +35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 09:48, 26 August 2020 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 09:18, 26 August 2020 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:23, 20 August 2020 diff hist −88 Phase V - Construction →Task No. 2 - Submit Agency Cash Flow Projection
- 11:47, 18 August 2020 diff hist +23 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 11:46, 18 August 2020 diff hist +43 N File:VI-1d project close out SMAC.docx Project Close Out Form - SMAC current
- 07:04, 31 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 07:03, 31 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 14:45, 29 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 14:44, 29 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 13:42, 13 July 2020 diff hist −1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:41, 13 July 2020 diff hist +1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:34, 13 July 2020 diff hist +2 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 15:21, 9 July 2020 diff hist −102 Condemnation Process
- 14:09, 9 July 2020 diff hist −12 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:05, 9 July 2020 diff hist −113 Planning Bid and Contract Award Schedules current
- 09:09, 9 July 2020 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:33, 8 July 2020 diff hist −21 Preparation of Construction Bid Documents →General Comments current
- 13:31, 8 July 2020 diff hist +83 Preparation of Construction Bid Documents →General Comments
- 10:28, 8 July 2020 diff hist 0 Preparation of Construction Bid Documents
- 10:26, 8 July 2020 diff hist +73 Preparation of Construction Bid Documents
- 14:18, 6 July 2020 diff hist −1,051 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 13:00, 6 July 2020 diff hist +7 Template:Green
- 12:58, 6 July 2020 diff hist −957 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 12:05, 6 July 2020 diff hist −17 Template:Green
- 11:58, 6 July 2020 diff hist +1,162 N Template:Green Created page with "{|style="background:#D4FFD4; color:#002AFF" align="center" border="0" cellpadding="5" width="80%" |- ||'''For KDOT projects''' - '''often changes occur during construction of..."
- 15:38, 1 July 2020 diff hist +28 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 15:37, 1 July 2020 diff hist +52 N File:II-3h Memo to Selection Committee.pdf Memo to Consultant Selection Committee current
- 08:42, 1 July 2020 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 08:30, 1 July 2020 diff hist +143 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 16:55, 30 June 2020 diff hist −1,034 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:47, 30 June 2020 diff hist +84 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:45, 30 June 2020 diff hist −4 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:33, 30 June 2020 diff hist +965 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 11:02, 29 June 2020 diff hist +10 Approved Materials - Concrete Work →Pavement Repair
- 10:59, 29 June 2020 diff hist +145 Approved Materials - Concrete Work →Pavement Repair
- 15:12, 26 June 2020 diff hist −31 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 14:48, 26 June 2020 diff hist +122 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 11:46, 26 June 2020 diff hist +593 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 11:34, 26 June 2020 diff hist +1 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:34, 26 June 2020 diff hist +36 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:32, 26 June 2020 diff hist +28 N File:Metcalf at 167th before during after.pdf Project Photos current
- 16:11, 25 June 2020 diff hist +1 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:09, 25 June 2020 diff hist +74 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:06, 25 June 2020 diff hist +19 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 16:05, 25 June 2020 diff hist +47 N File:VI-1e Utility Relocation Invoice.pdf Sample Utility Relocation Invoice current
- 16:03, 25 June 2020 diff hist +331 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 15:55, 25 June 2020 diff hist −24 Phase V - Construction →Task No. 22 - Project Completion Certification and Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 15:49, 25 June 2020 diff hist +38 N File:Punch List.pdf Irina Idelson moved page File:Punch List.pdf to File:V-17 Punch List.pdf current Tag: New redirect
- 15:49, 25 June 2020 diff hist 0 m File:V-17 Punch List.pdf Irina Idelson moved page File:Punch List.pdf to File:V-17 Punch List.pdf current
- 15:47, 25 June 2020 diff hist +6 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:46, 25 June 2020 diff hist +31 N File:V-17 Punch List.pdf Sample Punch List
- 15:42, 25 June 2020 diff hist +56 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:27, 25 June 2020 diff hist +33 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:27, 25 June 2020 diff hist +49 N File:Breakout of Construction Costs Revised.pdf Final Breakout of Construction Cost current
- 15:26, 25 June 2020 diff hist +14 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:25, 25 June 2020 diff hist +32 N File:DBE Summary Report.docx DBE Summary Report current
- 15:19, 25 June 2020 diff hist +22 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:19, 25 June 2020 diff hist +47 N File:Completion Letter to KDOT.docx Project Completion Letter to KDOT current
- 14:58, 25 June 2020 diff hist −26 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:54, 25 June 2020 diff hist −74 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:47, 25 June 2020 diff hist +20 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:47, 25 June 2020 diff hist +45 N File:V-15a Change Order-Blank.docx Change Order Form - Word format current
- 14:46, 25 June 2020 diff hist +20 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:45, 25 June 2020 diff hist +46 N File:V-15b Change Order-Blank.xlsx Change Order Form - Excel format current
- 14:41, 25 June 2020 diff hist −11 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:10, 25 June 2020 diff hist +15 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 13:48, 25 June 2020 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:47, 25 June 2020 diff hist +35 N File:V-14a Pay Estimate with DBE.xlsx Pay Estimate with DBE current
- 13:45, 25 June 2020 diff hist −12 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:44, 25 June 2020 diff hist +53 N File:V-14 Pay Estimate.xlsx Pay Estimate Template with Instructions current
- 11:14, 25 June 2020 diff hist +30 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 11:13, 25 June 2020 diff hist +42 N File:Notice of Termination Packet Signed.pdf Notice of Termination Packet current
- 09:23, 25 June 2020 diff hist −1 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 09:22, 25 June 2020 diff hist −117 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 09:22, 25 June 2020 diff hist +36 Phase IV - Pre-Construction →Task No. 16 - Request Bid Approval from KDOT
- 09:22, 25 June 2020 diff hist +82 Phase IV - Pre-Construction →Task No. 16 - Request Bid Approval from KDOT
- 09:20, 25 June 2020 diff hist +29 N File:IV-17a.pdf Irina Idelson moved page File:IV-17a.pdf to File:IV-16c.pdf current Tag: New redirect
- 09:20, 25 June 2020 diff hist 0 m File:IV-16c.pdf Irina Idelson moved page File:IV-17a.pdf to File:IV-16c.pdf current
- 16:11, 24 June 2020 diff hist −1 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:11, 24 June 2020 diff hist +90 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:09, 24 June 2020 diff hist +113 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:00, 24 June 2020 diff hist +3 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:51, 24 June 2020 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of File:IV-5j.docx
- 15:29, 24 June 2020 diff hist +16 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:29, 24 June 2020 diff hist +33 N File:Change Order executed.pdf Sample Change Order current
- 15:19, 24 June 2020 diff hist +114 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 15:12, 24 June 2020 diff hist +57 N File:V-11d Sample Transmittal Letter.pdf Sample Transmittal Letter to the Contractor current
- 13:30, 24 June 2020 diff hist +163 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 13:10, 24 June 2020 diff hist −5 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 13:09, 24 June 2020 diff hist +55 N File:Pre-construction agenda.docx Sample of Pre-Construction Meeting Agenda current
- 10:39, 24 June 2020 diff hist −14 Phase V - Construction →Task No. 12 - On-Going Inspections
- 10:38, 24 June 2020 diff hist +35 N File:LPASiteVisitChecklist KDOT.docx Site Visits Checklist current
- 10:27, 24 June 2020 diff hist +24 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 10:26, 24 June 2020 diff hist +67 N File:Consultant Selection Guide 2019.pdf Consultant Selection Guide - Construction Engineering current
- 10:19, 24 June 2020 diff hist +40 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 10:19, 24 June 2020 diff hist +60 N File:Proposal for Construction Engineering Services.docx proposal for Construction Engineering Services current
- 10:07, 24 June 2020 diff hist +2 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 10:06, 24 June 2020 diff hist −18 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 10:05, 24 June 2020 diff hist +280 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 16:02, 23 June 2020 diff hist −115 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 15:38, 23 June 2020 diff hist 0 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 15:37, 23 June 2020 diff hist +39 N File:1306 City Signed.pdf Irina Idelson moved page File:1306 City Signed.pdf to File:Form 1306 Signed.pdf current Tag: New redirect
- 15:37, 23 June 2020 diff hist 0 m File:Form 1306 Signed.pdf Irina Idelson moved page File:1306 City Signed.pdf to File:Form 1306 Signed.pdf current
- 15:34, 23 June 2020 diff hist 0 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 15:33, 23 June 2020 diff hist +68 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 15:32, 23 June 2020 diff hist +119 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 15:30, 23 June 2020 diff hist +33 N File:Form 1306 Signed.pdf Form 1306 Completed
- 13:46, 22 June 2020 diff hist 0 File:Form 1304 Signed.pdf Irina Idelson uploaded a new version of File:Form 1304 Signed.pdf current
- 09:57, 22 June 2020 diff hist +1 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 09:54, 22 June 2020 diff hist −129 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 11:03, 19 June 2020 diff hist −118 Phase V - Construction →Task No. 28 - Approve Contractor Final Pay and Surety Release
- 11:03, 19 June 2020 diff hist 0 Phase V - Construction →Task No. 28 - Approve Contractor Final Pay and Surety Release
- 11:01, 19 June 2020 diff hist +2 Phase V - Construction →Task No. 28 - Approve Contractor Final Pay and Surety Release
- 11:00, 19 June 2020 diff hist +2 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 10:59, 19 June 2020 diff hist +117 Phase V - Construction →Task No. 28 - Approve Contractor Final Pay and Surety Release
- 10:35, 19 June 2020 diff hist +1 Phase V - Construction →Task No. 25 - Submit Construction Summary Document to KDOT
- 10:34, 19 June 2020 diff hist +43 N File:Construction Summary Document form.docx Construction Summary Document current
- 09:55, 19 June 2020 diff hist +29 Phase V - Construction →Task No. 25 - Submit Construction Summary Document to KDOT
- 09:54, 19 June 2020 diff hist +43 N File:Construction Summary Document-sample.docx Construction Summary Document current
- 09:25, 19 June 2020 diff hist 0 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:24, 19 June 2020 diff hist +4 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:24, 19 June 2020 diff hist −44 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:21, 19 June 2020 diff hist +51 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:19, 19 June 2020 diff hist +53 N File:Project Completion Certificate-sample.pdf Project Completion Certificate (sample) current
- 09:10, 19 June 2020 diff hist 0 File:V-21a Sample Letter with Project Completion Certificate.docx Irina Idelson uploaded a new version of File:V-21a Sample Letter with Project Completion Certificate.docx current
- 09:06, 19 June 2020 diff hist 0 File:V-4a Sample Transmittal Letter to Contractor.docx Irina Idelson uploaded a new version of File:V-4b Sample Transmittal Letter to Contractor.docx
- 09:04, 19 June 2020 diff hist +42 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 09:03, 19 June 2020 diff hist +54 N File:V-4c Contract Documents and Plan Distribution.docx Contract Document and Plans Distribution
- 08:55, 19 June 2020 diff hist 0 File:V-5c Sample Transmittal to Contractor with Tax Exemption Certificate.docx Irina Idelson uploaded a new version of File:V-5c Sample Transmittal to Contractor with Tax Exemption Certificate.docx current
- 08:50, 19 June 2020 diff hist +54 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 08:49, 19 June 2020 diff hist +43 N File:V-5b Sample Project Exemption Certificate and cover letter.pdf Project Exemption Certificate current
- 08:42, 19 June 2020 diff hist +70 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 08:42, 19 June 2020 diff hist +75 N File:IV-2h Supplemental Agreement to Material Testing Services Agreement 1-15-20.docx Supplemental Agreement to Material Testing Services Agreement current
- 08:41, 19 June 2020 diff hist 0 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 08:38, 19 June 2020 diff hist +40 N File:IV-2g Testing Services Agreement - rev 1-15-20.docx Testing Services Agreement current
- 10:30, 18 June 2020 diff hist 0 File:Maintenance Plan Review Process 2020.docx Irina Idelson uploaded a new version of File:Maintenance Plan Review Process 2020.docx current
- 10:23, 18 June 2020 diff hist −83 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 17:03, 11 June 2020 diff hist +180 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 16:35, 11 June 2020 diff hist −22 Phase III - Final Design →Task No. 21 - Obtain Agency Plan Approvals
- 16:01, 11 June 2020 diff hist −116 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 11:49, 11 June 2020 diff hist +12 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:42, 11 June 2020 diff hist 0 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:41, 11 June 2020 diff hist −88 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 09:56, 10 June 2020 diff hist +144 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 09:51, 10 June 2020 diff hist +70 N File:Feasibily study SD improvement project.pdf Feasibility Study for storm drainage improvement project current
- 09:03, 10 June 2020 diff hist +149 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 08:54, 10 June 2020 diff hist +55 N File:PES Storm Drainage Improvement Project.pdf PES of Storm Drainage Improvement Project current
- 08:52, 10 June 2020 diff hist +5 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 08:40, 10 June 2020 diff hist +370 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 16:53, 9 June 2020 diff hist −45 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 15:16, 9 June 2020 diff hist +29 Phase VI - Retrospect →Task No. 6 - Complete Two-Year Inspection and Bond Release
- 15:15, 9 June 2020 diff hist +33 N File:End of two-year maintenance letter.docx Bond Release Letter current
- 15:10, 9 June 2020 diff hist +25 Phase VI - Retrospect →Task No. 6 - Complete Two-Year Inspection and Bond Release
- 15:10, 9 June 2020 diff hist +61 N File:2 year Maintenance Inspection .xlsx Two-year Maintenance Bond Inspection Punch List current
- 15:07, 9 June 2020 diff hist +43 N File:2 year Maintenance Inspection .xls 2 year Maintenance Inspection current
- 14:57, 9 June 2020 diff hist −100 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 14:54, 9 June 2020 diff hist +52 N File:ID assessment Public Hearing.pdf Background info for assessment hearing current
- 14:50, 9 June 2020 diff hist +48 N File:BACKGROUND - STANLEY STORM DRAINAGE IMPROVEMENT DISTRICT - PUBLIC HEARING.pdf Background info for public hearing current
- 14:41, 9 June 2020 diff hist +14 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 14:41, 9 June 2020 diff hist +37 N File:ID assessment memo.docx Project Assessment memo current
- 14:31, 9 June 2020 diff hist +7 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 14:30, 9 June 2020 diff hist +44 N File:ID tract map.pdf Improvement District tract map current
- 14:24, 9 June 2020 diff hist −18 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 14:23, 9 June 2020 diff hist +33 N File:ID Tract Assessments.xls OD Tract Assessment current
- 14:21, 9 June 2020 diff hist +33 Phase VI - Retrospect →Task No. 2 - Complete Property Owner Assessments
- 14:20, 9 June 2020 diff hist +38 N File:Proposed Assessment Roll - Google Docs.pdf Proposed Assessment Roll current
- 14:03, 9 June 2020 diff hist −7 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 14:02, 9 June 2020 diff hist +17 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 14:02, 9 June 2020 diff hist 0 N File:CARS project closeout letter.docx current
- 13:43, 9 June 2020 diff hist +42 N File:CARS project closeout letter.pdf CARS project closeout letter current
- 11:49, 9 June 2020 diff hist +25 Phase V - Construction →Task No. 26 - Receive Final Acceptance from KDOT
- 11:48, 9 June 2020 diff hist +30 N File:Final acceptance form V-2698.docx City Form V-2698 current
- 11:42, 9 June 2020 diff hist +64 Phase V - Construction →Task No. 25 - Submit Construction Summary Document to KDOT
- 11:40, 9 June 2020 diff hist +45 N File:TH-0513 FPIL .xlsx Sample of Final Paid Items List current
- 11:27, 9 June 2020 diff hist 0 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 11:23, 9 June 2020 diff hist +16 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 11:23, 9 June 2020 diff hist +30 N File:2021-2025 MIP - project form.xlsx MIP project form current
- 11:21, 9 June 2020 diff hist +16 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 11:20, 9 June 2020 diff hist +30 N File:2021-2025 CIP - project form.xlsx CIP project form current
- 11:00, 9 June 2020 diff hist −78 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 10:07, 9 June 2020 diff hist −2 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 09:50, 9 June 2020 diff hist 0 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 09:31, 9 June 2020 diff hist 0 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:16, 9 June 2020 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 09:16, 9 June 2020 diff hist +8 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 09:15, 9 June 2020 diff hist +80 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 09:11, 9 June 2020 diff hist +47 N File:Executed 0294 Form.pdf Sample of executed KDOT form 0294 current
- 08:54, 9 June 2020 diff hist −174 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 08:54, 9 June 2020 diff hist +5 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 08:41, 9 June 2020 diff hist −5 Approved Materials
- 08:31, 9 June 2020 diff hist +174 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 08:24, 9 June 2020 diff hist +7 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 08:23, 9 June 2020 diff hist +52 N File:Sidewalk-petition-residential.pdf Informal Residential Sidewalk Petition current
- 08:20, 9 June 2020 diff hist +192 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 16:15, 8 June 2020 diff hist −74 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 15:57, 8 June 2020 diff hist −16 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals, Street Lighting and other City Facilities
- 15:49, 8 June 2020 diff hist −11 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:44, 8 June 2020 diff hist +21 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:43, 8 June 2020 diff hist −136 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:38, 8 June 2020 diff hist −1 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:33, 8 June 2020 diff hist +1 Phase II - Preliminary Design →Task No. 22 - Update Preliminary Cash Flow Projection
- 15:24, 8 June 2020 diff hist 0 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 15:23, 8 June 2020 diff hist +9 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 14:23, 8 June 2020 diff hist 0 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 13:29, 8 June 2020 diff hist +17 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 13:28, 8 June 2020 diff hist +30 N File:2020 SAMP Application.pdf SAMP application current
- 13:24, 8 June 2020 diff hist +32 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 13:24, 8 June 2020 diff hist +34 N File:FINAL Submittal JOCO SMP SAMP Report.pdf JoCo SMP SAMP Report current
- 13:20, 8 June 2020 diff hist +36 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 13:20, 8 June 2020 diff hist +40 N File:InspectionProjectReimbursementForm 2019.xlsx Project Reimbursement Form current
- 13:17, 8 June 2020 diff hist +40 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 13:16, 8 June 2020 diff hist +41 N File:Inspection Project Template APR2019 Updates.xlsx Inspection Project Template current
- 13:12, 8 June 2020 diff hist +327 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 12:23, 8 June 2020 diff hist +414 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 12:04, 8 June 2020 diff hist −49 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 12:03, 8 June 2020 diff hist +141 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 12:00, 8 June 2020 diff hist +64 N File:Informal Petition Form storm drainage.pdf Informal Petition form for storm drainage projects current
- 11:55, 8 June 2020 diff hist +102 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 11:54, 8 June 2020 diff hist +58 N File:Sidewalk Petition form.pdf Informal Petition form for Sidewalk Projects current
- 11:53, 8 June 2020 diff hist +102 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 11:51, 8 June 2020 diff hist +49 N File:Street Light Petition form.pdf Street Light Informal Petition form current
- 11:47, 8 June 2020 diff hist 0 File:ID Petition form.pdf Irina Idelson uploaded a new version of File:ID Petition form.pdf current
- 10:30, 8 June 2020 diff hist +13 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 10:26, 8 June 2020 diff hist +49 N File:PW SOP for Storm Drainage Improvements.pdf SOP for Storm Drainage Improvements current
- 16:24, 4 June 2020 diff hist +5 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 16:23, 4 June 2020 diff hist +5 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 16:22, 4 June 2020 diff hist +45 N File:Maintenance Plan Review Process 2020.docx Maintenance Plan Review Process
- 16:06, 4 June 2020 diff hist +57 Phase III - Final Design →Task No. 21 - Obtain Agency Plan Approvals
- 16:05, 4 June 2020 diff hist +57 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 11:39, 4 June 2020 diff hist −5 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:38, 4 June 2020 diff hist +49 N File:Notice to Proceed.docx Notice to Proceed to the Contractor current
- 11:32, 4 June 2020 diff hist +147 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 11:26, 4 June 2020 diff hist +2 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:23, 4 June 2020 diff hist −61 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:22, 4 June 2020 diff hist −150 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:21, 4 June 2020 diff hist +54 N File:Certificate of Engineer.docx Certificate of Engineer as to Completion current
- 10:29, 4 June 2020 diff hist −30 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 10:27, 4 June 2020 diff hist −106 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 16:23, 3 June 2020 diff hist +12 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:20, 3 June 2020 diff hist +53 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:19, 3 June 2020 diff hist +22 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:07, 3 June 2020 diff hist +3 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 16:05, 3 June 2020 diff hist +2 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 16:04, 3 June 2020 diff hist −5 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 16:01, 3 June 2020 diff hist +27 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 16:01, 3 June 2020 diff hist +40 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 15:59, 3 June 2020 diff hist +187 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 15:51, 3 June 2020 diff hist −58 Phase III - Final Design →Task No. 21 - Obtain Agency Plan Approvals
- 15:42, 3 June 2020 diff hist −58 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 15:39, 3 June 2020 diff hist −49 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 15:37, 3 June 2020 diff hist +1 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 15:34, 3 June 2020 diff hist −48 Phase III - Final Design →Task No. 21 - Obtain Agency Plan Approvals
- 15:33, 3 June 2020 diff hist −49 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 15:27, 3 June 2020 diff hist −1 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 12:41, 3 June 2020 diff hist +85 Phase III - Final Design →Task No. 2 - Execute Utility Agreements
- 12:38, 3 June 2020 diff hist +83 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 12:26, 3 June 2020 diff hist +132 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 10:51, 3 June 2020 diff hist −45 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 10:42, 3 June 2020 diff hist −367 Phase VI - Retrospect →Task No. 3 - Conduct Post-Project Conference
- 10:33, 3 June 2020 diff hist +25 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:31, 3 June 2020 diff hist 0 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:30, 3 June 2020 diff hist +11 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:28, 3 June 2020 diff hist +18 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:28, 3 June 2020 diff hist +38 N File:Final Project Cost Memo.pdf Project Cost Memo to DPW current
- 10:24, 3 June 2020 diff hist +18 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:24, 3 June 2020 diff hist +38 N File:Cost Sheet from Finance.pdf Final Project Cost Sheet current
- 10:10, 3 June 2020 diff hist −5 Phase V - Construction →Task No. 25 - Submit Construction Summary Document to KDOT
- 10:10, 3 June 2020 diff hist +99 Phase V - Construction →Task No. 25 - Submit Construction Summary Document to KDOT
- 10:06, 3 June 2020 diff hist −7 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 10:05, 3 June 2020 diff hist +21 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 10:00, 3 June 2020 diff hist −1 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 09:58, 3 June 2020 diff hist +24 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:47, 3 June 2020 diff hist +58 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:44, 3 June 2020 diff hist +37 N File:Final Acceptance Letter.pdf Final Acceptance Letter current
- 09:44, 3 June 2020 diff hist +34 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:41, 3 June 2020 diff hist +37 N File:Final Acceptance Letter.docx Final Acceptance Letter current
- 09:38, 3 June 2020 diff hist −2 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:37, 3 June 2020 diff hist +37 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:37, 3 June 2020 diff hist −29 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:36, 3 June 2020 diff hist +35 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 09:35, 3 June 2020 diff hist +54 N File:Certificate of Engineer word.docx Certificate of Engineer as to Completion current
- 09:31, 3 June 2020 diff hist +29 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 09:30, 3 June 2020 diff hist +54 N File:Certificate of Engineer.pdf Certificate of Engineer as to Completion current
- 16:48, 2 June 2020 diff hist −122 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 16:36, 2 June 2020 diff hist −2 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 16:35, 2 June 2020 diff hist +94 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 16:27, 2 June 2020 diff hist −1 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 16:26, 2 June 2020 diff hist −14 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 16:25, 2 June 2020 diff hist −3 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 16:24, 2 June 2020 diff hist +7 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 16:24, 2 June 2020 diff hist +231 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 16:00, 2 June 2020 diff hist +16 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 16:00, 2 June 2020 diff hist +49 N File:CO Transmittal Letter.pdf Transmittal Letter for Change Order current
- 15:54, 2 June 2020 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:43, 2 June 2020 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 14:15, 2 June 2020 diff hist +19 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:15, 2 June 2020 diff hist +38 N File:Progress Meeting Minutes.pdf Progress Meeting Minutes current
- 14:12, 2 June 2020 diff hist +18 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 14:12, 2 June 2020 diff hist +37 N File:Progress Meeting Agenda.pdf Progress Meeting Agenda current
- 13:43, 2 June 2020 diff hist 0 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 13:41, 2 June 2020 diff hist 0 File:IV-2a.docx Irina Idelson uploaded a new version of File:IV-2a.docx
- 12:06, 2 June 2020 diff hist −8 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 12:06, 2 June 2020 diff hist +36 N File:Public Meeting Handout.pdf Public Meeting Handout current
- 11:58, 2 June 2020 diff hist −6 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:22, 2 June 2020 diff hist −2 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 11:20, 2 June 2020 diff hist −22 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:50, 2 June 2020 diff hist +14 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:48, 2 June 2020 diff hist +55 N File:Summary of takings.pdf Summary of Right-of-Way/Easements takings current
- 08:38, 2 June 2020 diff hist +36 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:34, 2 June 2020 diff hist +16 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:33, 2 June 2020 diff hist −8 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:32, 2 June 2020 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:31, 2 June 2020 diff hist +47 N File:RFQ Appraisal Acquisition.pdf RFQ packet for appraisal services
- 16:48, 1 June 2020 diff hist +5 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 16:48, 1 June 2020 diff hist +59 N File:ID Petition form.pdf City's petition form for Improvement Dstricts
- 16:38, 1 June 2020 diff hist 0 File:ID Petition.pdf Irina Idelson uploaded a new version of File:ID Petition.pdf current
- 16:15, 1 June 2020 diff hist +348 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 15:19, 1 June 2020 diff hist +117 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:06, 1 June 2020 diff hist −5 Phase I - Vision →Introduction
- 09:04, 1 June 2020 diff hist 0 Phase I - Vision →Introduction
- 09:04, 1 June 2020 diff hist −4 Phase I - Vision →Introduction
- 09:03, 1 June 2020 diff hist −7 Phase I - Vision →Introduction
- 15:16, 29 May 2020 diff hist −107 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:14, 29 May 2020 diff hist +1 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 15:01, 29 May 2020 diff hist −1 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 15:01, 29 May 2020 diff hist −197 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 14:56, 29 May 2020 diff hist −41 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 14:44, 29 May 2020 diff hist −196 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 14:24, 29 May 2020 diff hist 0 File:Sod Tree Shrub letter.pdf Irina Idelson uploaded a new version of File:Sod Tree Shrub letter.pdf current
- 14:22, 29 May 2020 diff hist +30 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 14:20, 29 May 2020 diff hist +65 N File:Sod Tree Shrub letter.pdf Sod and Tree/Shrub maintenance letter to homeowners
- 14:01, 29 May 2020 diff hist +10 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 14:00, 29 May 2020 diff hist +50 N File:Sod Maintenance.pdf Sod Maintenance letter to homeowners current
- 10:29, 30 April 2020 diff hist −31 Phase I - Vision →Task 6 - Submit MARC Five Year Plan
- 16:36, 27 April 2020 diff hist −8 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 16:14, 27 April 2020 diff hist +57 Approved Materials - Erosion and Sediment Control →Filter Sock
- 16:14, 27 April 2020 diff hist +56 Approved Materials - Erosion and Sediment Control →Synthetic Sediment Barrier
- 16:13, 27 April 2020 diff hist +6 Approved Materials - Geotextile →Geotextile Fabric current
- 16:12, 27 April 2020 diff hist +19 Approved Materials - Geotextile →Geotextile Fabric
- 16:06, 27 April 2020 diff hist +57 Approved Materials - Storm Drainage →Underdrains
- 16:05, 27 April 2020 diff hist +57 Approved Materials - Storm Drainage →Class III Concrete Pipe
- 16:04, 27 April 2020 diff hist +12 Approved Materials - Storm Drainage →Sealants - Manhole
- 16:00, 27 April 2020 diff hist +57 Approved Materials - Storm Drainage →Manhole Rings & Lids
- 15:59, 27 April 2020 diff hist +57 Approved Materials - Storm Drainage →Manhole Steps
- 15:54, 27 April 2020 diff hist +25 Approved Materials - Concrete Work →Pavement Repair
- 15:54, 27 April 2020 diff hist +25 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:53, 27 April 2020 diff hist +25 Approved Materials - Concrete Work →Median Pavers
- 15:51, 27 April 2020 diff hist +57 Approved Materials - Concrete Work →ADA Detectable Warning Plates
- 15:50, 27 April 2020 diff hist +57 Approved Materials - Concrete Work →Median Pavers
- 15:49, 27 April 2020 diff hist +57 Approved Materials - Concrete Work →Expansion Joint Material
- 15:48, 27 April 2020 diff hist +57 Approved Materials - Concrete Work →Curing Compound
- 08:27, 6 April 2020 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of File:IV-5f.docx
- 08:25, 6 April 2020 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of File:IV-5e.docx
- 12:18, 26 February 2020 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of File:II-3o.xlsx
- 12:16, 26 February 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 12:15, 26 February 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 12:14, 26 February 2020 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of File:IV-5c.docx
- 17:39, 22 January 2020 diff hist +14 Checklist Phase V
- 17:39, 22 January 2020 diff hist +31 N File:Phase V Checklist Revision 2019.docx Phase V Checklist current
- 17:05, 22 January 2020 diff hist −143 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from Evergy (KCP&L)
- 16:27, 22 January 2020 diff hist +74 N File:V-11a Release to Construction Letter to Black & McDonald.pdf Letter Releasing the Removal of Streetlights to Construction current
- 16:24, 22 January 2020 diff hist −11 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from Evergy (KCP&L)
- 16:01, 22 January 2020 diff hist +44 N File:V-11a Removal Procedure During Construction.pdf Streetlights Removal Procedure current
- 12:54, 22 January 2020 diff hist +18 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from Evergy
- 12:53, 22 January 2020 diff hist +42 N File:Proposal to remove streetlights from Black & McDonald.pdf Streetlight Removal Proposal current
- 12:52, 22 January 2020 diff hist +10 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from Evergy
- 12:50, 22 January 2020 diff hist +10 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:45, 22 January 2020 diff hist +59 N File:Letter to Black & McDonald requesting the removal of streetlights.pdf Letter Requesting the Removal of Streetlights current
- 12:38, 22 January 2020 diff hist −5 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from Evergy
- 12:35, 22 January 2020 diff hist +55 N File:Removal of Existing Streetlight Procedure.pdf Removal of Existing Streetlight Procedure current
- 12:13, 22 January 2020 diff hist 0 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals, Street Lighting and other Citi Facilities
- 12:08, 22 January 2020 diff hist −101 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:07, 22 January 2020 diff hist +44 N File:III-1f removal notification letter to Evergy.pdf Removal Notification to Evergy current
- 12:06, 22 January 2020 diff hist +38 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:05, 22 January 2020 diff hist +71 N File:III-1e Do Not Release to Construction letter.pdf DO NOT Release to Construction Letter to Black & McDonald current
- 12:03, 22 January 2020 diff hist +31 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:03, 22 January 2020 diff hist +64 N File:III-1d Release to Construction letter.pdf Release to Construction Letter to Black & McDonald current
- 12:02, 22 January 2020 diff hist +38 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:02, 22 January 2020 diff hist +51 N File:III-1c proposal letter from Black & McDonald.pdf Proposal Letter from Black & McDonald current
- 11:50, 22 January 2020 diff hist +46 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 11:49, 22 January 2020 diff hist +48 N File:III-1b letter requesting the removal of streetlights.pdf Request of Removal of Streetlights current
- 11:46, 22 January 2020 diff hist −12 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 11:44, 22 January 2020 diff hist +46 N File:III-1a Streetlighting Removal Procedure.pdf Streetlighting Removal Procedure current
- 11:40, 22 January 2020 diff hist +45 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 11:40, 22 January 2020 diff hist +46 N File:Exhibit No. III-1a Streetlighting Removal Procedure.pdf Streetlighting Removal Procedure current
- 10:45, 22 January 2020 diff hist +24 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 10:42, 22 January 2020 diff hist +19 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 10:37, 22 January 2020 diff hist −45 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:41, 21 January 2020 diff hist +159 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 09:18, 15 January 2020 diff hist +1 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 09:17, 15 January 2020 diff hist +55 N File:II-34d Appraiser Agreement under 10K rev 1-14-20.docx Appraisal Agreement for fee under $10,000 current
- 09:15, 15 January 2020 diff hist +1 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 09:15, 15 January 2020 diff hist +54 N File:II-34e Appraiser Agreement over $10K rev 1-14-20.docx Appraisal Agreement for Fee over $10,000 current
- 09:01, 15 January 2020 diff hist +10 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:00, 15 January 2020 diff hist +56 N File:II-3d Supplemental to Consulting Services 1-14-20.docx Supplemental Agreement_non-design projects current
- 08:56, 15 January 2020 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 08:55, 15 January 2020 diff hist +58 N File:II-3c Consultant Agreement-non design rev 1-14-20.docx Consultant Agreement fro non-design projects current
- 08:50, 15 January 2020 diff hist 0 File:II-3b(2) Supplemental to Eng Arch Services-second and beyond 1-14-20.docx Irina Idelson uploaded a new version of File:II-3b(2) Supplemental to Eng Arch Services-second and beyond 1-14-20.docx current
- 08:43, 15 January 2020 diff hist 0 File:II-3b(2) Supplemental to Eng Arch Services-second and beyond 1-14-20.docx Irina Idelson uploaded a new version of File:II-3b(2) Supplemental to Eng Arch Services-second and beyond 1-14-20.docx
- 17:34, 14 January 2020 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 17:33, 14 January 2020 diff hist +95 N File:II-3b(2) Supplemental to Eng Arch Services-second and beyond 1-14-20.docx Supplemental Agreement for Professional Engineering Services. (Second and beyond)
- 17:30, 14 January 2020 diff hist +62 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 17:29, 14 January 2020 diff hist +68 N File:II-3b(1) Supplemental to Engineering Architectural Services - 1-14-20.docx Supplemental to Engineering Services Agreement (First) current
- 17:26, 14 January 2020 diff hist +1 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 17:25, 14 January 2020 diff hist +60 N File:II-3a Engineering Architectural Services Agreement rev 12-10-19.docx Engineering / Architectural Services Agreement current
- 15:42, 14 January 2020 diff hist 0 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 15:41, 14 January 2020 diff hist +35 N File:Restoration Agreement template 01.14.2020.docx Restoration Agreement current
- 09:35, 14 January 2020 diff hist +168 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 09:25, 14 January 2020 diff hist +35 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 09:24, 14 January 2020 diff hist +33 N File:Flooding Questionnaire Template.doc Flood Questionnaire current
- 09:22, 14 January 2020 diff hist +174 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 00:24, 12 January 2020 diff hist +229 Phase III - Final Design →Task No. 17 - Complete Utility Relocations
- 00:18, 12 January 2020 diff hist −33 Phase III - Final Design →Task No. 17 - Complete Utility Relocations
- 12:37, 26 December 2019 diff hist −50 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 12:15, 26 December 2019 diff hist −1 Right-of-Way Permits - Plan Submission Requirements current
- 12:10, 26 December 2019 diff hist +4 Right-of-Way Permits - Plan Submission Requirements
- 11:45, 26 December 2019 diff hist +52 Right-of-Way Permits - Plan Submission Requirements
- 11:37, 26 December 2019 diff hist −1 Right-of-Way Permits - Plan Submission Requirements
- 11:34, 26 December 2019 diff hist +1 Right-of-Way Permits - Plan Submission Requirements
- 11:33, 26 December 2019 diff hist +116 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 11:25, 26 December 2019 diff hist +85 Right-of-Way Permits - Plan Submission Requirements
- 11:23, 26 December 2019 diff hist −89 Right-of-Way Permits - Plan Submission Requirements
- 11:11, 26 December 2019 diff hist +3,927 N Right-of-Way Permits - Plan Submission Requirements Created page with "City of Overland Park Plans Submission Requirements Right-of-Way Permits The City of Overland Park implemented its current right-of-way management ordinance on January 1, 2..."
- 10:01, 26 December 2019 diff hist +35 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:49, 26 December 2019 diff hist +243 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 09:30, 26 December 2019 diff hist +36 Phase III - Final Design →Task No. 16 - Schedule Fourth Utility Meeting
- 09:25, 26 December 2019 diff hist +1 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 09:25, 26 December 2019 diff hist +35 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 15:17, 24 December 2019 diff hist −3 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 15:15, 24 December 2019 diff hist +1 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 14:59, 24 December 2019 diff hist −1 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:58, 24 December 2019 diff hist 0 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:56, 24 December 2019 diff hist 0 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:54, 24 December 2019 diff hist +38 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:49, 24 December 2019 diff hist −50 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:48, 24 December 2019 diff hist +47 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 14:40, 24 December 2019 diff hist +43 N File:1306 modified.pdf KDOT Form 1306 modified By OP current
- 09:46, 24 December 2019 diff hist −102 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 09:28, 24 December 2019 diff hist +12 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:54, 20 December 2019 diff hist −1 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:53, 20 December 2019 diff hist +3 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:52, 20 December 2019 diff hist −6 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:51, 20 December 2019 diff hist +43 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:47, 20 December 2019 diff hist +2 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:46, 20 December 2019 diff hist +53 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 17:43, 20 December 2019 diff hist +87 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 16:43, 20 December 2019 diff hist +6 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 16:42, 20 December 2019 diff hist +34 N File:II-7 email to utility companies links.docx Utility info request current
- 16:32, 20 December 2019 diff hist +35 N File:Utility Response Form.pdf Utility Response Form current
- 16:31, 20 December 2019 diff hist +45 N File:Project location map for utilities.pdf example of project location map current
- 13:03, 20 December 2019 diff hist −14 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 13:03, 20 December 2019 diff hist +11 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Utility Meeting.
- 13:01, 20 December 2019 diff hist +25 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Utility Meeting.
- 13:00, 20 December 2019 diff hist −6 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule First Utility Meeting (optional)
- 12:59, 20 December 2019 diff hist −21 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 12:20, 20 December 2019 diff hist −1 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 12:19, 20 December 2019 diff hist −99 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 12:18, 20 December 2019 diff hist −60 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 12:10, 20 December 2019 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule First Utility Meeting (optional)
- 12:09, 20 December 2019 diff hist +33 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule First Utility Meeting (optional)
- 12:07, 20 December 2019 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule First Utility Meeting (optional)
- 12:05, 20 December 2019 diff hist +23 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule First Utility Meeting (optional)
- 12:05, 20 December 2019 diff hist +44 N File:II-7 email to utility companies.docx Initial Contact with Utilities current
- 12:04, 20 December 2019 diff hist +355 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 09:59, 20 December 2019 diff hist +5 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:52, 18 December 2019 diff hist +39 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:51, 18 December 2019 diff hist +59 N File:II-3g RFQ packet for consulting services.pdf Example of RFQ packet for consulting services current
- 16:45, 18 December 2019 diff hist +29 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:44, 18 December 2019 diff hist +56 N File:II-3d Supplemental Agreement non-design.docx Supplemental Agreement_non-design projects current
- 16:28, 18 December 2019 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification