Revision History

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Revision as of 11:42, 12 June 2012 by Mike Ross (talk | contribs)
Jump to navigation Jump to search


Home I-Vision II-Preliminary Design III-Final Design IV-Pre-Construction V-Construction VI-Retrospect
Date Revision By
5/1/2012 Wiki software upgraded to 1.18 Keith Diehl
4/5/2010 Wiki was moved to the MediaWiki wiki MSR
8/26/2008 Phase III - Final Design

Task No. 7 - Submit Final Plans for Review Submittal
Added link to the Maintenance Plan Review Process

JEA
8/26/2008 Phase II - Preliminary Design

Task No. 22 - Distribute Plans for Field Check
Added link to the Maintenance Plan Review Process

JEA
8/6/2008 Phase V - Construction

Task No. 12 - On-Going Inspections
Added Electrical Service Address Procedures and links.

JEA
8/6/2008 Phase II - Preliminary Design

Task No. 28 - Begin Field Check Plan Review
Added Electrical Service Address Procedures and links.

JEA
7/15/2008 Project Procedures Manual was moved to the MS Sharepoint Wiki. JEA