Related changes
Jump to navigation
Jump to search
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
15 September 2025
|
15:58 | Phase V - Construction 6 changes history +173 [Sdgotfre (6×)] | |||
|
15:58 (cur | prev) −2 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit | ||||
|
15:56 (cur | prev) +58 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit | ||||
|
15:55 (cur | prev) +57 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit | ||||
|
15:53 (cur | prev) −3 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit | ||||
|
15:47 (cur | prev) −89 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit | ||||
|
15:46 (cur | prev) +152 Sdgotfre talk contribs (→Task No. 12 - On-Going Inspections) Tag: Visual edit |
|
09:53 | Phase III - Final Design 3 changes history +2 [Alisha Holcomb (3×)] | |||
|
09:53 (cur | prev) +1 Alisha Holcomb talk contribs (→City's Standard Contract Documents:) | ||||
|
09:20 (cur | prev) 0 Alisha Holcomb talk contribs (→City's Standard Contract Documents:) | ||||
|
09:13 (cur | prev) +1 Alisha Holcomb talk contribs (→City's Standard Contract Documents:) |