Difference between revisions of "Revision History"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(Created page with '{| class="wikitable" border="2" !width="100" align="center"|Date !width="600"|Revision !width="100"|By |- |align="center"|4/5/2010 |Wiki was moved to the MediaWiki wiki |align="c…')
 
Line 1: Line 1:
{{Navbar}}
{| class="wikitable" border="2"
{| class="wikitable" border="2"
!width="100" align="center"|Date
!width="100" align="center"|Date

Revision as of 06:46, 27 April 2010


Home I-Vision II-Preliminary Design III-Final Design IV-Pre-Construction V-Construction VI-Retrospect
Date Revision By
4/5/2010 Wiki was moved to the MediaWiki wiki MSR
8/26/2008 Phase III - Final Design

Task No. 7 - Submit Final Plans for Review Submittal
Added link to the Maintenance Plan Review Process

JEA
8/26/2008 Phase II - Preliminary Design

Task No. 22 - Distribute Plans for Field Check
Added link to the Maintenance Plan Review Process

JEA
8/6/2008 Phase V - Construction

Task No. 12 - On-Going Inspections
Added Electrical Service Address Procedures and links.

JEA
8/6/2008 Phase II - Preliminary Design

Task No. 28 - Begin Field Check Plan Review
Added Electrical Service Address Procedures and links.

JEA
7/15/2008 Project Procedures Manual was moved to the MS Sharepoint Wiki. JEA