Difference between revisions of "Revision History"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
Line 17: Line 17:
|align="center"|MSR
|align="center"|MSR
|-
|-
|align="center"|8/26/2008
|
|Phase III - Final Design<br>
Task No. 7 - Submit Final Plans for Review Submittal<br>
Added link to the Maintenance Plan Review Process
|align="center"|JEA
|-
|align="center"|8/26/2008
|Phase II - Preliminary Design<br>
Task No. 22 - Distribute Plans for Field Check<br>
Added link to the Maintenance Plan Review Process
|align="center"|JEA
|-
|align="center"|8/6/2008
|Phase V - Construction<br>
Task No. 12 - On-Going Inspections<br>
Added Electrical Service Address Procedures and links.
|align="center"|JEA
|-
|align="center"|8/6/2008
|Phase II - Preliminary Design<br>
Task No. 28 - Begin Field Check Plan Review<br>
Added Electrical Service Address Procedures and links.
|align="center"|JEA
|-
|align="center"|7/15/2008
|Project Procedures Manual was moved to the MS Sharepoint Wiki.
|align="center"|JEA
|}

Revision as of 13:33, 27 October 2015


Home I-Vision II-Preliminary Design III-Final Design IV-Pre-Construction V-Construction VI-Retrospect
Date Revision By
5/1/2012 Wiki software upgraded to 1.19 Keith Diehl
4/5/2010 Wiki was moved to the MediaWiki wiki MSR