== 1. Prepare Preliminary Plans/Cost Estimate == | == 1. Prepare Preliminary Plans/Cost Estimate == | ||
Should there be additional steps that a) determine whether to use a consultant or do the designs in-house, and then b) gather (a list) the necessary materials with which to prepare the design/estimate? --[[User:Michaelsross|Michaelsross]] 18:18, 7 July 2010 (UTC) | |||
== 2. Prepare Feasibility Report == | == 2. Prepare Feasibility Report == |
Latest revision as of 12:18, 7 July 2010
Home | I-Vision | II-Preliminary Design | III-Final Design | IV-Pre-Construction | V-Construction | VI-Retrospect |
1. Prepare Preliminary Plans/Cost Estimate
Should there be additional steps that a) determine whether to use a consultant or do the designs in-house, and then b) gather (a list) the necessary materials with which to prepare the design/estimate? --Michaelsross 18:18, 7 July 2010 (UTC)