Difference between revisions of "Talk:Phase I Checklist"
Jump to navigation
Jump to search
(Created page with '== 1. Prepare Preliminary Plans/Cost Estimate == == 2. Prepare Feasibility Report == == 3. Prepare SMAC Project Addition Study (Form) == 4. Obtain City Council Approval-Prelim…') |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Navbar}} | |||
== 1. Prepare Preliminary Plans/Cost Estimate == | == 1. Prepare Preliminary Plans/Cost Estimate == | ||
Should there be additional steps that a) determine whether to use a consultant or do the designs in-house, and then b) gather (a list) the necessary materials with which to prepare the design/estimate? --[[User:Michaelsross|Michaelsross]] 18:18, 7 July 2010 (UTC) | |||
== 2. Prepare Feasibility Report == | == 2. Prepare Feasibility Report == | ||
== 3. Prepare SMAC Project Addition Study (Form) | == 3. Prepare SMAC Project Addition Study (Form)== | ||
== 4. Obtain City Council Approval-Preliminary Plans == | == 4. Obtain City Council Approval-Preliminary Plans == |
Latest revision as of 12:18, 7 July 2010
Home | I-Vision | II-Preliminary Design | III-Final Design | IV-Pre-Construction | V-Construction | VI-Retrospect |
1. Prepare Preliminary Plans/Cost Estimate
Should there be additional steps that a) determine whether to use a consultant or do the designs in-house, and then b) gather (a list) the necessary materials with which to prepare the design/estimate? --Michaelsross 18:18, 7 July 2010 (UTC)