From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation
Jump to search
|
|
(One intermediate revision by the same user not shown) |
Line 17: |
Line 17: |
| |align="center"|MSR | | |align="center"|MSR |
| |- | | |- |
| |align="center"|8/26/2008
| |
| |Phase III - Final Design<br>
| |
| Task No. 7 - Submit Final Plans for Review Submittal<br>
| |
| Added link to the Maintenance Plan Review Process
| |
| |align="center"|JEA
| |
| |-
| |
| |align="center"|8/26/2008
| |
| |Phase II - Preliminary Design<br>
| |
| Task No. 22 - Distribute Plans for Field Check<br>
| |
| Added link to the Maintenance Plan Review Process
| |
| |align="center"|JEA
| |
| |-
| |
| |align="center"|8/6/2008
| |
| |Phase V - Construction<br>
| |
| Task No. 12 - On-Going Inspections<br>
| |
| Added Electrical Service Address Procedures and links.
| |
| |align="center"|JEA
| |
| |-
| |
| |align="center"|8/6/2008
| |
| |Phase II - Preliminary Design<br>
| |
| Task No. 28 - Begin Field Check Plan Review<br>
| |
| Added Electrical Service Address Procedures and links.
| |
| |align="center"|JEA
| |
| |-
| |
| |align="center"|7/15/2008
| |
| |Project Procedures Manual was moved to the MS Sharepoint Wiki.
| |
| |align="center"|JEA
| |
| |}
| |
Latest revision as of 14:34, 27 October 2015
Date
|
Revision
|
By
|
5/1/2012
|
Wiki software upgraded to 1.19
|
Keith Diehl
|
4/5/2010
|
Wiki was moved to the MediaWiki wiki
|
MSR
|