Difference between revisions of "Talk:Phase I Checklist"
Jump to navigation
Jump to search
(Created page with '== 1. Prepare Preliminary Plans/Cost Estimate == == 2. Prepare Feasibility Report == == 3. Prepare SMAC Project Addition Study (Form) == 4. Obtain City Council Approval-Prelim…') |
(No difference)
|
Revision as of 13:13, 7 July 2010
1. Prepare Preliminary Plans/Cost Estimate
2. Prepare Feasibility Report
== 3. Prepare SMAC Project Addition Study (Form)