- 07:34, 15 April 2010 diff hist +70 N File:V-15.pdf procedure for processing construction change orders for KDOT projects.
- 07:34, 15 April 2010 diff hist +39 N File:V-15d.dot sample change order transmittal letter.
- 07:34, 15 April 2010 diff hist +35 N File:V-15c.dot sample completed change order form.
- 07:34, 15 April 2010 diff hist +39 N File:V-15b.xlt blank change order form. (Excel Format)
- 07:34, 15 April 2010 diff hist +38 N File:V-15a.dot blank change order form. (Word Format)
- 07:29, 15 April 2010 diff hist +58 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 07:27, 15 April 2010 diff hist +69 N File:V-14d.dot KDOT Form No. 209 and requirements on conducting Wage Rate Interviews
- 07:27, 15 April 2010 diff hist +44 N File:V-14c.dot Certificate of Subcontract Work and Payment.
- 07:27, 15 April 2010 diff hist +38 N File:V-14b.pdf DOT Form 1008: DBE Payment Affidavit.
- 07:27, 15 April 2010 diff hist +63 N File:V-14a.xlt template with instructions for creating a Monthly Pay Estimate.
- 07:23, 15 April 2010 diff hist +103 N File:V-13f.xlt spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
- 07:23, 15 April 2010 diff hist +54 N File:V-13e.dot City's Material Testing Recap Log Sheet (word format).
- 07:23, 15 April 2010 diff hist +48 N File:V-13d.dot City's Material Testing Log Sheet (word format).
- 07:23, 15 April 2010 diff hist +49 N File:V-13c.xlt City's Material Testing Log Sheet (excel format).
- 07:23, 15 April 2010 diff hist +65 N File:V-13b.dot example of a transmittal letter and the City's Project Data Sheet
- 07:23, 15 April 2010 diff hist +166 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 07:16, 15 April 2010 diff hist +7 Phase V - Construction →Task No. 12 - On-Going Inspections
- 07:15, 15 April 2010 diff hist +114 Phase V - Construction →Task No. 12 - On-Going Inspections
- 07:15, 15 April 2010 diff hist +41 N File:KDOT Construction Oversight Questionnaire.pdf KDOT Construction Oversight Questionnaire
- 07:13, 15 April 2010 diff hist +34 N File:As-built plan procedure flow chart.xlt AS-built plan procedure flow chart
- 07:12, 15 April 2010 diff hist +161 Phase V - Construction →Task No. 12 - On-Going Inspections
- 07:09, 15 April 2010 diff hist +50 N File:ESC Final Inspection Form.doc Erosion and Sediment Control Final Inspection Form
- 07:09, 15 April 2010 diff hist +44 N File:ESC Initial Inspection Form.doc Initial Erosion and Sediment Inspection Form
- 07:09, 15 April 2010 diff hist +104 N File:ESC Weekly Inspection Form, Amendments and Checklist.xls Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist
- 07:09, 15 April 2010 diff hist +51 N File:ESC Quality Assurance Form.doc Erosion and Sediment Control Quality Assurance Form
- 06:59, 15 April 2010 diff hist +35 Phase V - Construction →Task No. 12 - On-Going Inspections
- 06:52, 15 April 2010 diff hist +388 Phase V - Construction →Task No. 12 - On-Going Inspections
- 06:45, 15 April 2010 diff hist +36 N File:V-12e.xlt City's Sidewalk Ramp Inspection Form
- 06:45, 15 April 2010 diff hist +62 N File:V-12d.dot City's Summary of Cold Weather Concrete Procedures (11/22/00).
- 06:45, 15 April 2010 diff hist +40 N File:V-12c.xlt City's Concrete Inspection Requirements.
- 06:45, 15 April 2010 diff hist +48 N File:V-12b.dot City's Daily Inspection Report in (word format).
- 06:45, 15 April 2010 diff hist +28 N File:Blank Inspection Record Form.dot Blank Inspection Record Form
- 06:39, 15 April 2010 diff hist +37 N File:Inspection Record and fax transmittal - Construction - Task 12.pdf Inspection Record and Fax Transmittal
- 06:34, 15 April 2010 diff hist +189 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 06:32, 15 April 2010 diff hist +26 N File:Contract Submittal Forms.pdf Contractor Submittal Forms
- 06:27, 15 April 2010 diff hist 0 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 06:27, 15 April 2010 diff hist +52 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 06:26, 15 April 2010 diff hist +68 N File:V-11c.dot transmittal letter to the contractor for completed submittals review
- 06:26, 15 April 2010 diff hist +72 N File:V-11b.dot copy of the City's Concrete Mix Design Requirements with approval letter
- 06:26, 15 April 2010 diff hist +44 N File:V-11a.dot storm sewer structure shop drawing checklist
- 06:23, 15 April 2010 diff hist +35 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 06:22, 15 April 2010 diff hist +22 N File:Project photos.pdf Example project photos
- 06:18, 15 April 2010 diff hist +3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 06:17, 15 April 2010 diff hist +6 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 06:16, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 06:15, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 06:14, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 06:14, 15 April 2010 diff hist +1 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 06:14, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Document/Addendum
- 06:13, 15 April 2010 diff hist +6 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 08:47, 14 April 2010 diff hist +3 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 08:47, 14 April 2010 diff hist −123 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 08:44, 14 April 2010 diff hist +94 N File:V-4e.dot sample transmittal letter to prime contractor requesting a copy of each signed DBE subcontract
- 08:44, 14 April 2010 diff hist +61 N File:IV-12b.dot sample letter/form to DBE subcontractor(s) to sign and return
- 08:44, 14 April 2010 diff hist +57 N File:IV-19b.dot sample rejection letter sent to the unsuccessful bidders.
- 08:44, 14 April 2010 diff hist +50 N File:IV-19a.dot sample award letter sent to the successful bidder.
- 08:42, 14 April 2010 diff hist +238 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 08:37, 14 April 2010 diff hist +4 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 08:36, 14 April 2010 diff hist +4 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 08:35, 14 April 2010 diff hist +304 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 08:33, 14 April 2010 diff hist +43 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 08:31, 14 April 2010 diff hist +41 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 08:30, 14 April 2010 diff hist +37 N File:IV-15a.dot template for creating the escrow memo
- 08:30, 14 April 2010 diff hist +25 N File:IV-18b.dot sample project cost memo.
- 08:30, 14 April 2010 diff hist +30 N File:IV-18a.pdf City Charter Ordinance No. 71.
- 08:29, 14 April 2010 diff hist +44 N File:IV-16c.xlt sample staff project cost estimate breakdown
- 08:27, 14 April 2010 diff hist +65 Phase IV - Pre-Construction →Task No. 14 - Evaluate Possible Contractor Collusion
- 08:26, 14 April 2010 diff hist +61 N File:IV-14a.pdf correspondence from KDOT regarding DBE Reporting Requirements
- 08:25, 14 April 2010 diff hist +27 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 08:25, 14 April 2010 diff hist +8 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 08:23, 14 April 2010 diff hist +41 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 08:22, 14 April 2010 diff hist +46 N File:IV-14.pdf example of a completed DBE Contract Goals form
- 07:20, 14 April 2010 diff hist +39 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 07:19, 14 April 2010 diff hist +93 N File:IV-12a.xlt Sub-contractor Breakdown Form to be completed by the apparent low bidder. (Non-KDOT Project)
- 07:19, 14 April 2010 diff hist +89 N File:IV-12.xlt Sub-contractor Breakdown Form to be completed by the apparent low bidder. (KDOT Project)
- 07:16, 14 April 2010 diff hist +20 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 07:16, 14 April 2010 diff hist +31 N File:IV-11.xlt sample detailed bid tabulation.
- 07:14, 14 April 2010 diff hist +7 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 07:12, 14 April 2010 diff hist +17 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 07:12, 14 April 2010 diff hist +27 N File:IV-10.dot sample bid tabulation form.
- 07:10, 14 April 2010 diff hist +15 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Document/Addendum
- 07:10, 14 April 2010 diff hist +47 N File:IV-9.pdf sample transmittal letter and contract addendum
- 07:08, 14 April 2010 diff hist +2 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 07:07, 14 April 2010 diff hist +71 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Pre-Qualifications
- 07:07, 14 April 2010 diff hist +42 N File:IV-8.pdf example of KDOT's Class or Classes of Work
- 07:05, 14 April 2010 diff hist +7 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:04, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:04, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:03, 14 April 2010 diff hist +8 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:03, 14 April 2010 diff hist −6 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:02, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:02, 14 April 2010 diff hist +25 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 07:01, 14 April 2010 diff hist +33 N File:IV-7.dot sample Pre-Bid Conference Agenda.
- 06:59, 14 April 2010 diff hist +38 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 06:59, 14 April 2010 diff hist +46 N File:IV-6.dot sample Engineer’s construction cost estimate
- 06:57, 14 April 2010 diff hist 0 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractor’s/DBE Firms
- 06:57, 14 April 2010 diff hist +91 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractor’s/DBE Firms
- 06:45, 14 April 2010 diff hist +5 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 06:43, 14 April 2010 diff hist +52 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 06:43, 14 April 2010 diff hist +84 N File:IV-4d.dot sample e-mail cover sheet to the Office of the Secretary of State. (Kansas Register)
- 06:41, 14 April 2010 diff hist +81 N File:IV-4c.pdf sample legal publication affidavit for the Johnson County Sun and Kansas Register
- 06:41, 14 April 2010 diff hist +24 N File:IV-4b.dot sample Notice to Bidders
- 06:41, 14 April 2010 diff hist +56 N File:IV-4a.dot sample transmittal memorandum to the City Clerk's office
- 06:39, 14 April 2010 diff hist +46 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 06:38, 14 April 2010 diff hist +6 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 06:34, 14 April 2010 diff hist +55 N File:IV-2d.xlt material testing proposal (Exhibit B). (excel version)
- 06:33, 14 April 2010 diff hist +99 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals frame|80px
- 06:30, 14 April 2010 diff hist +65 N File:IV-2h.dot Supplemental Agreement for Construction Material Testing Services
- 06:30, 14 April 2010 diff hist +53 N File:IV-2g.dot Agreement for Construction Material Testing Services.
- 06:30, 14 April 2010 diff hist +58 N File:IV-2f.dot Material Sampling and Testing Frequency Chart (Exhibit D).
- 06:30, 14 April 2010 diff hist +48 N File:IV-2e.dot material and testing specifications (Exhibit C).
- 06:30, 14 April 2010 diff hist +54 N File:IV-2d.dot material testing proposal (Exhibit B). (word version)
- 06:30, 14 April 2010 diff hist +51 N File:IV-2c.dot material testing proposal instructions (Exhibit A).
- 06:25, 14 April 2010 diff hist +42 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals
- 06:25, 14 April 2010 diff hist +22 N File:MaterialsTesting.jpg Material testing photo current
- 06:23, 14 April 2010 diff hist +27 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 06:22, 14 April 2010 diff hist +120 N File:IV-1b.xlt approved products listing for signals, street lighting, fiber optics, ITS, traffic control, pavement marking and signing
- 06:22, 14 April 2010 diff hist +31 N File:IV-1a.xlt contractor submittals checklist
- 06:21, 14 April 2010 diff hist +216 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 06:19, 14 April 2010 diff hist +23 N File:LDP Example.pdf Land Disturbance Permit
- 06:13, 14 April 2010 diff hist +52 N File:OP SWPPP Template.doc Stormwater Pollution Prevention Plan (SWPP) Template
- 06:06, 14 April 2010 diff hist +1 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 06:06, 14 April 2010 diff hist +8 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 06:05, 14 April 2010 diff hist +12 Phase III - Final Design →file:Publicmeeting.jpgTask No. 13 - Schedule Third Public Information Meeting
- 06:03, 14 April 2010 diff hist +26 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 05:55, 14 April 2010 diff hist +264 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 05:53, 14 April 2010 diff hist +88 Phase III - Final Design →Task No. 19 - Confirm Construction Engineering Responsibility
- 05:47, 14 April 2010 diff hist +73 N File:III-22f.pdf "Example Billing" for reimbursement of Construction Engineering Services
- 05:47, 14 April 2010 diff hist +39 N File:III-22e.pdf letter from BLP accepting overhead rate
- 05:47, 14 April 2010 diff hist +34 N File:III-22d.pdf Force Account Equipment Rate Table
- 05:47, 14 April 2010 diff hist +74 N File:III-22c.pdf "Consultant Selection Guide for Construction Engineering on LPA Projects".
- 05:47, 14 April 2010 diff hist +94 N File:III-22b.pdf example of "Exhibit A" referred to in the above Proposal for Construction Engineering Services
- 05:47, 14 April 2010 diff hist +46 N File:III-22a.dot Proposal For Construction Engineering Services
- 13:19, 13 April 2010 diff hist +93 Phase III - Final Design →Task No. 18 - Request / Receive Obligation of Funds from KDOT
- 13:17, 13 April 2010 diff hist +93 N File:III-19.pdf example letter from KDOT approving Obligation of Funds and authorization to bid the contract.
- 13:17, 13 April 2010 diff hist +45 N File:III-14.dot example letter requesting Obligation of Funds
- 13:17, 13 April 2010 diff hist +14 N File:BLP-memo-99-11.PDF BLP Memo 99-11
- 13:14, 13 April 2010 diff hist +26 Phase III - Final Design →Task No. 17- Obtain Agency Plan Approvals
- 13:12, 13 April 2010 diff hist 0 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 13:12, 13 April 2010 diff hist +35 N File:III-13a.dot KDOT "Design Summary Document" form
- 13:11, 13 April 2010 diff hist +91 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 13:10, 13 April 2010 diff hist +2 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 13:09, 13 April 2010 diff hist +194 Phase III - Final Design →Task No. 13 - Schedule Third Public Information Meeting
- 13:07, 13 April 2010 diff hist +81 Phase III - Final Design →Task No. 11 - Complete Utility Relocations
- 13:06, 13 April 2010 diff hist +64 Phase III - Final Design →Task No. 10 - Schedule Fourth Utility Meeting
- 13:05, 13 April 2010 diff hist +67 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 13:04, 13 April 2010 diff hist +350 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 13:00, 13 April 2010 diff hist +28 N File:BLP-memo-10-04.pdf BLP memo 10-04, Buy American
- 12:56, 13 April 2010 diff hist +241 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:50, 13 April 2010 diff hist +64 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:04, 13 April 2010 diff hist +201 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:02, 13 April 2010 diff hist +116 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 12:01, 13 April 2010 diff hist +46 N File:CDBG Statement of compliance.pdf Statement of Compliance, Form WH-348 (3 pages)
- 11:59, 13 April 2010 diff hist +99 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:56, 13 April 2010 diff hist +39 N File:CDBG Conflict of interest certification city.doc CDBG Conflict of Interest Certification
- 11:56, 13 April 2010 diff hist +14 N File:CDBG Checklist city.xls CDBG Checklist
- 11:56, 13 April 2010 diff hist +35 N File:CDBG Standards of conduct.pdf CDBG Standards of Conduct (2 pages)
- 11:56, 13 April 2010 diff hist +38 N File:CDBG Notice to all employees.pdf CDBG Notice To All Employees (2 pages)
- 11:41, 13 April 2010 diff hist +211 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 11:37, 13 April 2010 diff hist +337 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 11:30, 13 April 2010 diff hist +39 N File:CDBG Federal labor standards.pdf CDBG Federal labor standards provisions
- 11:30, 13 April 2010 diff hist +22 N File:CDBG Non discrimination.doc CDBG Nondiscrimination
- 11:30, 13 April 2010 diff hist +21 N File:CDBG Section 3 Clause.doc CDBG Section 3 clause
- 11:30, 13 April 2010 diff hist +47 N File:CDBG Equal employment.pdf CDBG Equal Employment Opportunity Certification
- 11:30, 13 April 2010 diff hist +37 N File:CDBG Certification-lobbying.doc CDBG Certification regarding Lobbying
- 11:30, 13 April 2010 diff hist +19 N File:CDBG Debarment.pdf CDBG Debarment form
- 11:30, 13 April 2010 diff hist +60 N File:III-11a-13.dot List of utilities and status of same for contracts over $50k
- 11:30, 13 April 2010 diff hist +52 N File:III-11a-12.dot Appointment of Service Agent for contracts over $50k
- 11:22, 13 April 2010 diff hist +42 N File:III-11a-11.dot Special Conditions for contracts over $50k
- 11:22, 13 April 2010 diff hist +57 N File:III-9a-10b.dot Table of Contents (CDBG projects) for contracts over $50k
- 11:22, 13 April 2010 diff hist +57 N File:III-9a-10a.dot Table of Contents (KDOT projects) for contracts over $50k
- 11:22, 13 April 2010 diff hist +40 N File:III-11a-8.dot Performance Bond for contracts over $50k
- 11:22, 13 April 2010 diff hist +41 N File:III-11a-10.dot Table of Contents for contracts over $50k
- 11:22, 13 April 2010 diff hist +38 N File:III-11a-9.dot Statutory Bond for contracts over $50k
- 11:22, 13 April 2010 diff hist +55 N File:III-11a-7.dot Labor and Material Payment Bond for contracts over $50k
- 11:22, 13 April 2010 diff hist +48 N File:III-9a-6b.dot Notice to bidders (CDBG) for contracts over $50k
- 11:22, 13 April 2010 diff hist +48 N File:III-9a-6a.dot Notice to bidders (KDOT) for contracts over $50k
- 11:22, 13 April 2010 diff hist +41 N File:III-11a-6.dot Notice to bidders for contracts over $50k
- 11:22, 13 April 2010 diff hist +41 N File:III-11a-5.dot Insurance Options for contracts over $50k
- 11:22, 13 April 2010 diff hist +56 N File:III-9a-4c.dot Instructions to bidders Option C for contracts over $50k
- 11:22, 13 April 2010 diff hist +56 N File:III-9a-4b.dot Instructions to bidders Option B for contracts over $50k
- 11:22, 13 April 2010 diff hist +56 N File:III-9a-4a.dot Instructions to bidders Option A for contracts over $50k
- 11:22, 13 April 2010 diff hist +42 N File:III-9a-3.dot General Conditions for contracts over $50k
- 11:22, 13 April 2010 diff hist +43 N File:III-9a-2b.dot Bid (CDBG projects) for contracts over $50k
- 11:22, 13 April 2010 diff hist +43 N File:III-9a-2a.dot Bid (KDOT projects) for contracts over $50k
- 11:22, 13 April 2010 diff hist +27 N File:III-11a-2.dot Bid for contracts over $50k
- 11:22, 13 April 2010 diff hist +33 N File:III-11a-1.dot Agreement for contracts over $50k
- 11:06, 13 April 2010 diff hist +2 Phase III - Final Design →Notes
- 10:49, 13 April 2010 diff hist +15 Phase III - Final Design →Task No. 16 - Prepare Design Summary Document
- 10:47, 13 April 2010 diff hist +54 N File:III-13b.pdf example of a completed KDOT "Design Summary Document".
- 09:38, 13 April 2010 diff hist +5 Template:Navbar
- 09:30, 13 April 2010 diff hist −2 Template:Navbar
- 09:29, 13 April 2010 diff hist −28 Template:Navbar
- 09:29, 13 April 2010 diff hist −1 Template:Navbar
- 09:28, 13 April 2010 diff hist +31 Template:Navbar
- 08:29, 13 April 2010 diff hist 0 Template:Note2 current
- 08:28, 13 April 2010 diff hist +2 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 08:27, 13 April 2010 diff hist +158 N Template:Note2 Created page with '{|style="background:#D4FFD4; color:#002AFF" align="center" border="0" cellpadding="5" width="70%" |- |50px||'''Note:''' {{{1}}} |}'
- 07:58, 13 April 2010 diff hist +17 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 07:57, 13 April 2010 diff hist +13 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 07:55, 13 April 2010 diff hist +26 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 07:51, 13 April 2010 diff hist +35 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 07:51, 13 April 2010 diff hist +101 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 07:49, 13 April 2010 diff hist +38 N File:III-9-4c.dot Instructions to Contractors - Option C
- 07:48, 13 April 2010 diff hist +38 N File:III-9-4b.dot Instructions to Contractors - Option B
- 07:35, 13 April 2010 diff hist +177 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 07:31, 13 April 2010 diff hist +57 N File:III-9-10.dot List of utilities and status of same contracts under $50k
- 07:31, 13 April 2010 diff hist +49 N File:III-9-9.dot Appointment of Service Agent contracts under $50k
- 07:31, 13 April 2010 diff hist +39 N File:III-9-8.dot Special conditions contracts under $50k
- 07:31, 13 April 2010 diff hist +38 N File:III-9-7.dot Table of Contents contracts under $50k
- 07:31, 13 April 2010 diff hist +37 N File:III-9-6.dot Performance Bond contracts under $50k
- 07:31, 13 April 2010 diff hist +52 N File:III-9-5.dot Labor and Material Payment Bond contracts under $50k
- 07:31, 13 April 2010 diff hist +60 N File:III-9-4a.dot Instructions to Contractors - Option A contracts under $50k
- 07:31, 13 April 2010 diff hist +43 N File:III-9-3.dot General conditions for contracts under $50k
- 07:31, 13 April 2010 diff hist +33 N File:III-9-2.dot Proposal for contracts under $50k
- 07:31, 13 April 2010 diff hist +34 N File:III-9-1.dot Agreement for contracts under $50k
- 07:31, 13 April 2010 diff hist +54 N File:Contract bidding schedules.dot Guidance for planning bid and contract award schedules
- 07:31, 13 April 2010 diff hist +44 N File:Detailed procedures contract prep.dot Detailed Procedures for Contract Preparation
- 07:31, 13 April 2010 diff hist +30 N File:BLP-memo-04-07.pdf Procedures for DBE Involvement
- 07:15, 13 April 2010 diff hist +180 Phase III - Final Design →Task No. 8 - Submit Specifications and Special Provisions
- 07:12, 13 April 2010 diff hist +43 N File:Using MakeSpec-Instructions.doc Instructions for using the program MakeSpec
- 07:11, 13 April 2010 diff hist +123 N File:III-10c.pdf List of proprietary items for Traffic Signals and Street Lighting to be used in the preparation of plans and specifications
- 07:11, 13 April 2010 diff hist +50 N File:III-10a.pdf sample of City Specifications for a street project
- 07:09, 13 April 2010 diff hist +46 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 07:07, 13 April 2010 diff hist +38 N File:ESC Plan Review Checklist.doc Erosion and Sediment Control Checklist
- 07:05, 13 April 2010 diff hist +3 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 07:04, 13 April 2010 diff hist +254 Phase III - Final Design →Task No. 7 - Submit Final Plans for Review Submittal |120px|right
- 06:59, 13 April 2010 diff hist +52 N File:BLP-memo-06-06.pdf list of information is to be submitted with the PS&E
- 06:59, 13 April 2010 diff hist +44 N File:BLP-memo-06-05.pdf information pertaining to Final Check Plans.
- 06:59, 13 April 2010 diff hist +112 N File:III-7a.pdf letter from CARS accepting plans along with additional information and requirements prior to advertising project
- 06:55, 13 April 2010 diff hist +53 N File:ESC PW Process.doc Erosion and Sediment Control Process for Public Works
- 06:49, 13 April 2010 diff hist +6 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 06:49, 13 April 2010 diff hist +31 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 06:48, 13 April 2010 diff hist +159 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 06:45, 13 April 2010 diff hist +57 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304
- 06:44, 13 April 2010 diff hist +150 N File:III-8d.dot KDOT Form 1306 - Certification By the City to the Kansas Department of Transportation of Real Property Acquisition Procedures and Utility Arrangements
- 06:44, 13 April 2010 diff hist +153 N File:III-8c.dot KDOT Form 1304 - List of Utilities & Status. (example template) Note: All utilities from Phase II task 9 should be considered when completing form 1304.
- 06:44, 13 April 2010 diff hist +92 N File:III-8b.pdf KDOT Memo B.R.U.D. 84-10 regarding Status of Utility and Railroad Agreements and Adjustments
- 06:44, 13 April 2010 diff hist +116 N File:III-8a.pdf memo from the U.S. Department of Transportation regarding Status of Utility and Railroad Agreements and Adjustments.
- 06:41, 13 April 2010 diff hist +28 Phase III - Final Design →Task No. 4 - Begin Condemnation Process
- 06:40, 13 April 2010 diff hist +47 N File:III-4a.dot Example transmittal memo condemnation documents
- 06:40, 13 April 2010 diff hist +29 N File:III-8.dot Steps in condemnation process
- 06:38, 13 April 2010 diff hist +33 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 06:37, 13 April 2010 diff hist +133 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 06:33, 13 April 2010 diff hist +27 N File:III-5b.dot Sample Log of owner contact
- 06:33, 13 April 2010 diff hist +35 N File:III-5a.dot Real Property Acquisition Checklist
- 06:28, 13 April 2010 diff hist −2 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 06:28, 13 April 2010 diff hist −68 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 06:26, 13 April 2010 diff hist −13 Phase III - Final Design →Notes
- 06:25, 13 April 2010 diff hist +15 Phase III - Final Design →Notes