- 11:23, 16 December 2016 diff hist +13 Approved Materials - Concrete Work →Median Pavers
- 11:22, 16 December 2016 diff hist −54 Approved Materials - Concrete Work →Mortar for Pavers
- 11:19, 16 December 2016 diff hist +31 Approved Materials - Concrete Work →Mortar for Pavers
- 11:11, 16 December 2016 diff hist −1 Approved Materials - Concrete Work →Mortar for Pavers
- 11:10, 16 December 2016 diff hist −17 Approved Materials - Concrete Work →Mortar for Pavers
- 11:08, 16 December 2016 diff hist +17 Approved Materials - Concrete Work →Mortar for Pavers
- 11:07, 16 December 2016 diff hist −17 Approved Materials - Concrete Work →Mortar for Pavers
- 11:06, 16 December 2016 diff hist +71 Approved Materials - Concrete Work →Mortar for Pavers
- 11:05, 16 December 2016 diff hist −17 Approved Materials - Concrete Work →Mortar for Pavers
- 14:30, 6 December 2016 diff hist +32 N File:III-9c.pdf Letter from CARS accepting plans current
- 14:28, 6 December 2016 diff hist 0 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 12:37, 1 December 2016 diff hist 0 File:II-3o.xlsx Jearcher uploaded a new version of "File:II-3o.xlsx"
- 12:22, 22 November 2016 diff hist 0 File:II-3o.xlsx Jearcher uploaded a new version of "File:II-3o.xlsx"
- 12:04, 16 November 2016 diff hist +114 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:03, 16 November 2016 diff hist −3 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:02, 16 November 2016 diff hist +107 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:01, 16 November 2016 diff hist +1 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 12:00, 16 November 2016 diff hist −2 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 11:59, 16 November 2016 diff hist +5 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 11:52, 16 November 2016 diff hist +111 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 11:50, 16 November 2016 diff hist +60 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 11:39, 16 November 2016 diff hist +9 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:31, 16 November 2016 diff hist +12 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:57, 16 November 2016 diff hist −39 Phase II - Preliminary Design →Task No. 12 - Other Agency Agreements (if Applicable)
- 10:53, 16 November 2016 diff hist +38 Phase II - Preliminary Design →Task No. 12 - Other Agency Agreements (if Applicable)
- 10:36, 16 November 2016 diff hist −7 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:31, 16 November 2016 diff hist −40 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:30, 16 November 2016 diff hist −15 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:28, 16 November 2016 diff hist +11 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:57, 16 November 2016 diff hist 0 Phase I - Vision →Task 10 - Submit CARS Five Year Plan to County
- 09:56, 16 November 2016 diff hist 0 File:I-10f.xls Jearcher uploaded a new version of "File:I-10f.xls" current
- 09:54, 16 November 2016 diff hist +13 N File:I-10e.doc Cars Form "A" current
- 09:54, 16 November 2016 diff hist 0 Phase I - Vision →Task 10 - Submit CARS Five Year Plan to County
- 09:30, 16 November 2016 diff hist +28 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 09:13, 16 November 2016 diff hist +20 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 09:04, 16 November 2016 diff hist 0 File:I-1.pdf Jearcher uploaded a new version of "File:I-1a.pdf"
- 10:10, 25 August 2016 diff hist +24 N File:II-3o.xlsx List of Consulting Firms
- 10:04, 25 August 2016 diff hist −10 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 08:40, 15 August 2016 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx"
- 08:32, 15 August 2016 diff hist +12 N File:Verizon Inquiries.pdf Verizon Memo current
- 08:30, 15 August 2016 diff hist −3 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:30, 15 August 2016 diff hist +3 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:29, 15 August 2016 diff hist +1 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:29, 15 August 2016 diff hist −3 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:28, 15 August 2016 diff hist +5 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:26, 15 August 2016 diff hist −2 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:25, 15 August 2016 diff hist −3 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:25, 15 August 2016 diff hist +5 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:24, 15 August 2016 diff hist +109 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:18, 15 August 2016 diff hist +1 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:18, 15 August 2016 diff hist −59 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:16, 15 August 2016 diff hist +58 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 10:02, 25 July 2016 diff hist +115 Phase II - Preliminary Design →Task No. 27 - Schedule Field Check Meeting
- 09:58, 25 July 2016 diff hist +88 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 09:55, 25 July 2016 diff hist +22 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 09:54, 25 July 2016 diff hist +65 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 07:53, 27 June 2016 diff hist +29 N File:II-3o June 2016.xlsx is a list of Consulting Firms current
- 07:52, 27 June 2016 diff hist −5 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 11:56, 13 June 2016 diff hist 0 File:IV-2a.docx Jearcher uploaded a new version of "File:IV-2a.docx"
- 09:27, 22 April 2016 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx"
- 16:19, 8 March 2016 diff hist 0 File:III-13a Design Summary Doc OP.pdf Jearcher uploaded a new version of "File:III-13a Design Summary Doc OP.pdf" current
- 14:52, 8 March 2016 diff hist +22 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 13:23, 8 March 2016 diff hist 0 File:Form 1313.xlsx Jearcher uploaded a new version of "File:Form 1313.xlsx" current
- 13:21, 8 March 2016 diff hist +30 N File:Form 1313.xlsx KDOT Form 1313 Payment Request
- 13:19, 8 March 2016 diff hist +31 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:15, 8 March 2016 diff hist +10 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 13:08, 8 March 2016 diff hist 0 File:III-22c.pdf Jearcher uploaded a new version of "File:III-22c.pdf" current
- 13:05, 8 March 2016 diff hist 0 File:III-22c.pdf Jearcher uploaded a new version of "File:III-22c.pdf"
- 12:09, 8 March 2016 diff hist −14 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 12:03, 8 March 2016 diff hist 0 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 12:02, 8 March 2016 diff hist 0 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 12:01, 8 March 2016 diff hist +8 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:57, 8 March 2016 diff hist +197 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:48, 8 March 2016 diff hist +65 N File:17.0 Bridge Design 12-2014.pdf 17.0 Bridge Design 12-2014 of KDOT LPA Project Development Manual current
- 11:47, 8 March 2016 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:46, 8 March 2016 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:45, 8 March 2016 diff hist −2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:44, 8 March 2016 diff hist −2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:43, 8 March 2016 diff hist +133 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:24, 8 March 2016 diff hist +140 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 11:19, 8 March 2016 diff hist +44 N File:I-13c.docx sample transmittal letter for KDOT form 1302 current
- 11:18, 8 March 2016 diff hist +1 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:11, 8 March 2016 diff hist +1 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:10, 8 March 2016 diff hist +34 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:09, 8 March 2016 diff hist +4 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:07, 8 March 2016 diff hist −140 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:04, 8 March 2016 diff hist +112 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 10:53, 8 March 2016 diff hist +38 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 10:51, 8 March 2016 diff hist −50 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 12:16, 29 February 2016 diff hist 0 File:V-19a.docx Jearcher uploaded a new version of "File:V-19a.docx"
- 10:04, 19 February 2016 diff hist −1 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 4th Public Information Meeting.
- 10:04, 19 February 2016 diff hist +1 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 4th Public Information Meeting.
- 10:03, 19 February 2016 diff hist +1 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 4th Public Information Meeting.
- 10:03, 19 February 2016 diff hist +352 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 4th Public Information Meeting.
- 09:59, 19 February 2016 diff hist +1 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 09:58, 19 February 2016 diff hist +351 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 09:54, 19 February 2016 diff hist +1 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 09:54, 19 February 2016 diff hist +353 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 09:52, 19 February 2016 diff hist +10 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:49, 19 February 2016 diff hist −1 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:48, 19 February 2016 diff hist +73 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:43, 19 February 2016 diff hist −1 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:41, 19 February 2016 diff hist +2 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:41, 19 February 2016 diff hist −15 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:39, 19 February 2016 diff hist +12 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:38, 19 February 2016 diff hist +5 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:36, 19 February 2016 diff hist +143 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 09:01, 19 February 2016 diff hist +115 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 08:58, 19 February 2016 diff hist −2 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 08:57, 19 February 2016 diff hist −3 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 08:57, 19 February 2016 diff hist +15 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 14:59, 18 February 2016 diff hist 0 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 14:59, 18 February 2016 diff hist 0 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:56, 18 February 2016 diff hist 0 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 14:56, 18 February 2016 diff hist −2 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 14:55, 18 February 2016 diff hist −3 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 14:55, 18 February 2016 diff hist +329 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 14:54, 18 February 2016 diff hist +1 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:53, 18 February 2016 diff hist +1 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 14:53, 18 February 2016 diff hist +324 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 14:52, 18 February 2016 diff hist +12 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:49, 18 February 2016 diff hist 0 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:47, 18 February 2016 diff hist +46 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:44, 18 February 2016 diff hist +99 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:41, 18 February 2016 diff hist −1 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:41, 18 February 2016 diff hist +168 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:36, 18 February 2016 diff hist 0 File:Final Plan Review Checklist.docx Jearcher uploaded a new version of "File:Final Plan Review Checklist.docx" current
- 15:46, 1 February 2016 diff hist −4 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:46, 1 February 2016 diff hist −95 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:44, 1 February 2016 diff hist −9 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:40, 1 February 2016 diff hist −30 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 12:29, 22 January 2016 diff hist 0 File:Final Plan Review Checklist.docx Jearcher uploaded a new version of "File:Final Plan Review Checklist.docx"
- 12:26, 22 January 2016 diff hist +27 N File:Final Plan Review Checklist.docx Final Plan Review Checklist
- 12:24, 22 January 2016 diff hist +127 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 10:26, 20 January 2016 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 10:25, 20 January 2016 diff hist +102 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 12:38, 14 January 2016 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 09:10, 11 January 2016 diff hist −85 Phase VI - Retrospect →Task No. 8 - Receive Final Payment from KDOT
- 09:06, 11 January 2016 diff hist +85 Phase VI - Retrospect →Task No. 8 - Receive Final Payment from KDOT
- 09:52, 30 November 2015 diff hist 0 File:V-19b.docx Jearcher uploaded a new version of "File:V-19b.docx"
- 09:52, 30 November 2015 diff hist 0 File:V-19a.docx Jearcher uploaded a new version of "File:V-19a.docx"
- 15:37, 13 November 2015 diff hist −2 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 15:36, 13 November 2015 diff hist −4 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 15:16, 13 November 2015 diff hist −6 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 17:01, 12 November 2015 diff hist −25 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 16:56, 12 November 2015 diff hist +16 Phase III - Final Design →Task No. 15 - PS&E Review
- 16:44, 12 November 2015 diff hist 0 File:III-11a-2a Bid-KDOT.docx Jearcher uploaded a new version of "File:III-11a-2a Bid-KDOT.docx" current
- 16:37, 12 November 2015 diff hist 0 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 16:35, 12 November 2015 diff hist +13 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 09:07, 10 November 2015 diff hist 0 File:Using MakeSpec-Instructions.doc Jearcher uploaded a new version of "File:Using MakeSpec-Instructions.doc" current
- 09:04, 10 November 2015 diff hist 0 File:Using MakeSpec-Consultant Instructions.doc Jearcher uploaded a new version of "File:Using MakeSpec-Consultant Instructions.doc" current
- 16:36, 2 November 2015 diff hist 0 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 16:34, 2 November 2015 diff hist 0 N File:15.0 LPA-Administered Procedures 12-2014.pdf current
- 16:33, 2 November 2015 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 16:33, 2 November 2015 diff hist 0 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 16:32, 2 November 2015 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 16:30, 2 November 2015 diff hist +8 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 16:29, 2 November 2015 diff hist 0 N File:06.0 Right of Way 12-2014.pdf current
- 16:28, 2 November 2015 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:26, 2 November 2015 diff hist −1 Phase II - Preliminary Design →Task No. 29 - Continue Environmental Process
- 16:25, 2 November 2015 diff hist 0 N File:05.0 Road Design 12-2014.pdf current
- 16:25, 2 November 2015 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 16:22, 2 November 2015 diff hist −1 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 16:18, 2 November 2015 diff hist 0 N File:08.0 CE Consultant Selection and Agreement 12-2014.pdf current
- 16:17, 2 November 2015 diff hist 0 N File:03.0 PE Consultant Selection and Agreement 12-2014.pdf current
- 16:16, 2 November 2015 diff hist +16 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:13, 2 November 2015 diff hist 0 N File:04.0 Environmental 12-2014.pdf current
- 16:13, 2 November 2015 diff hist −1 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 16:11, 2 November 2015 diff hist 0 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 16:10, 2 November 2015 diff hist 0 N File:02.0 PROGRAMMING 12-2014.pdf current
- 16:10, 2 November 2015 diff hist 0 Phase I - Vision →Task 12 - Obtain Priority Evaluation from KDOT
- 16:05, 28 October 2015 diff hist +26 Phase III - Final Design →Task No. 15 - PS&E Review
- 13:57, 28 October 2015 diff hist +15 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:00, 28 October 2015 diff hist −15 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 12:54, 28 October 2015 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 12:50, 28 October 2015 diff hist +53 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 12:34, 28 October 2015 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 12:30, 28 October 2015 diff hist 0 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 12:29, 28 October 2015 diff hist −5 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 12:28, 28 October 2015 diff hist +63 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 12:18, 28 October 2015 diff hist −45 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 12:12, 28 October 2015 diff hist +5 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 12:11, 28 October 2015 diff hist +50 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 11:57, 28 October 2015 diff hist +3 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:54, 28 October 2015 diff hist +31 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:53, 28 October 2015 diff hist +7 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:51, 28 October 2015 diff hist +7 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:48, 28 October 2015 diff hist +34 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:44, 28 October 2015 diff hist −10 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 14:49, 27 October 2015 diff hist +45 References
- 14:48, 27 October 2015 diff hist −1 References
- 14:47, 27 October 2015 diff hist +98 References
- 14:38, 27 October 2015 diff hist +10 References
- 14:37, 27 October 2015 diff hist +5 References
- 14:34, 27 October 2015 diff hist −2 Revision History current
- 14:33, 27 October 2015 diff hist −838 Revision History
- 14:29, 27 October 2015 diff hist −92 References
- 13:28, 23 October 2015 diff hist +2 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 13:28, 23 October 2015 diff hist +1 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 13:27, 23 October 2015 diff hist +2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 12:51, 23 October 2015 diff hist +14 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 12:50, 23 October 2015 diff hist +7 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 12:37, 23 October 2015 diff hist +7 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 12:34, 23 October 2015 diff hist −3 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 12:33, 23 October 2015 diff hist −17 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 12:33, 23 October 2015 diff hist +6 Phase V - Construction →Task No. 24 - Submit Material Certification to KDOT
- 12:26, 23 October 2015 diff hist 0 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 12:01, 23 October 2015 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 10:53, 23 October 2015 diff hist +1 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 10:36, 23 October 2015 diff hist +50 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:35, 23 October 2015 diff hist +1 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:32, 23 October 2015 diff hist +46 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:31, 23 October 2015 diff hist +100 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:29, 23 October 2015 diff hist +110 Phase III - Final Design →Task No. 17 - Complete Utility Relocations
- 10:18, 23 October 2015 diff hist +55 Phase III - Final Design →Task No. 15 - PS&E Review
- 10:18, 23 October 2015 diff hist +55 Phase III - Final Design →Task No. 15 - PS&E Review
- 10:14, 23 October 2015 diff hist +109 Phase III - Final Design →Task No. 14 - Submit PS&E Package
- 10:11, 23 October 2015 diff hist +60 Phase III - Final Design →Task No. 14 - Submit PS&E Package
- 16:54, 22 October 2015 diff hist −1 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:53, 22 October 2015 diff hist −2 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:53, 22 October 2015 diff hist −3 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:52, 22 October 2015 diff hist +6 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:52, 22 October 2015 diff hist +85 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:46, 22 October 2015 diff hist +34 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 16:41, 22 October 2015 diff hist +23 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 16:30, 22 October 2015 diff hist +43 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 16:24, 22 October 2015 diff hist −2 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 16:23, 22 October 2015 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 16:22, 22 October 2015 diff hist +65 N File:II-24e.docx listing of contact information and addresses for the ECA agencies
- 16:21, 22 October 2015 diff hist +1 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:10, 22 October 2015 diff hist −1 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:09, 22 October 2015 diff hist −92 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:09, 22 October 2015 diff hist +205 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:01, 22 October 2015 diff hist +24 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 14:56, 22 October 2015 diff hist +14 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:07, 21 October 2015 diff hist +28 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:05, 21 October 2015 diff hist +27 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:01, 21 October 2015 diff hist +19 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 12:58, 21 October 2015 diff hist +19 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 12:57, 21 October 2015 diff hist +19 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 12:52, 21 October 2015 diff hist +28 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 12:52, 21 October 2015 diff hist +28 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 12:51, 21 October 2015 diff hist +28 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 11:29, 21 October 2015 diff hist +14 N File:I-13a.xlsx KDOT Form 1302 current
- 11:28, 21 October 2015 diff hist +1 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 14:00, 23 September 2015 diff hist +24 N File:II-3o September 2015.xlsx list of Consulting Firms current
- 14:00, 23 September 2015 diff hist +3 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 15:51, 22 September 2015 diff hist 0 File:Form1307.pdf Jearcher uploaded a new version of "File:Form1307.pdf" current
- 15:31, 22 September 2015 diff hist +50 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications
- 08:42, 31 August 2015 diff hist 0 File:III-11a-10a Table of Contents KDOT.docx Jearcher uploaded a new version of "File:III-11a-10a Table of Contents KDOT.docx"
- 08:40, 31 August 2015 diff hist 0 File:III-11a-6a Notice to Bidders KDOT.docx Jearcher uploaded a new version of "File:III-11a-6a Notice to Bidders KDOT.docx"
- 08:38, 31 August 2015 diff hist 0 File:III-11a-2a Bid-KDOT.docx Jearcher uploaded a new version of "File:III-11a-2a Bid-KDOT.docx"
- 15:54, 28 August 2015 diff hist +21 N File:Restoration Agreement template.pdf Restoration Agreement
- 15:53, 28 August 2015 diff hist −1 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:52, 28 August 2015 diff hist +99 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 08:29, 27 July 2015 diff hist 0 File:Sample letter to KCP&L informing.docx Jearcher uploaded a new version of "File:Sample letter to KCP&L informing.docx" current
- 10:57, 2 July 2015 diff hist 0 File:Streetlighting removal procedure during design.pdf Jearcher uploaded a new version of "File:Streetlighting removal procedure during design.pdf"
- 14:07, 1 June 2015 diff hist 0 File:II-3o May 2015.xlsx Jearcher uploaded a new version of "File:II-3o May 2015.xlsx" current
- 11:12, 29 May 2015 diff hist +1 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 08:49, 12 May 2015 diff hist +24 N File:II-3o May 2015.xlsx List of Consulting Firms
- 08:49, 12 May 2015 diff hist −2 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 10:16, 11 May 2015 diff hist 0 File:II-34a.docx Jearcher uploaded a new version of "File:II-32a.docx"
- 16:26, 4 May 2015 diff hist 0 File:II-3o April 2015.xlsx Jearcher uploaded a new version of "File:II-3o April 2015.xlsx" current
- 08:30, 3 April 2015 diff hist +68 N File:V-11c.docx transmittal letter to the contractor for completed submittals review current
- 08:28, 3 April 2015 diff hist +2 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 08:01, 23 March 2015 diff hist +60 N File:KCP&L Electrical Service Application.docx KCP&L Commercial & Industrial Electrical Service Application current
- 08:00, 23 March 2015 diff hist −23 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 17:09, 6 March 2015 diff hist +1 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 17:04, 6 March 2015 diff hist +13 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 17:03, 6 March 2015 diff hist +65 N File:KCP&L DWG 130.1-12.pdf KCP&L clearance from signal or streetlight poles to utility lines current
- 17:02, 6 March 2015 diff hist −7 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 17:01, 6 March 2015 diff hist −44 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 17:00, 6 March 2015 diff hist +168 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 16:56, 6 March 2015 diff hist +49 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 16:34, 6 March 2015 diff hist 0 File:V-19a.docx Jearcher uploaded a new version of "File:V-19a.docx"
- 16:34, 6 March 2015 diff hist +31 N File:V-19b.docx Street Light Project Data Sheet
- 16:32, 6 March 2015 diff hist +1 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:41, 20 February 2015 diff hist 0 File:V-7a contractor submittal checklist.xlsx Jearcher uploaded a new version of "File:V-7a contractor submittal checklist.xlsx"
- 10:29, 19 February 2015 diff hist +65 N File:IV-2h.docx Supplemental Agreement for Construction Material Testing Services
- 10:29, 19 February 2015 diff hist +52 N File:IV-2g.docx Agreement for Construction Material Testing Services
- 10:28, 19 February 2015 diff hist −55 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 17:25, 21 January 2015 diff hist 0 File:V-7a contractor submittal checklist.xlsx Jearcher uploaded a new version of "File:V-7a contractor submittal checklist.xlsx"
- 10:09, 15 January 2015 diff hist +20 N File:Tract File Checklist.docx Tract File Checklist current
- 10:08, 15 January 2015 diff hist +42 Phase II - Preliminary Design →Task No. 31 - Submit Right-of-Way Plans/Legal Descriptions
- 10:03, 15 January 2015 diff hist +125 Phase II - Preliminary Design →Task No. 31 - Submit Right-of-Way Plans/Legal Descriptions
- 11:07, 19 December 2014 diff hist 0 File:IV-2a.docx Jearcher uploaded a new version of "File:IV-2a.docx"
- 10:06, 1 December 2014 diff hist 0 File:Sample letter to Black & McDonald holding.docx Jearcher uploaded a new version of "File:Sample letter to Black & McDonald holding.docx" current
- 10:01, 1 December 2014 diff hist 0 File:Streetlighting removal procedure during construction.pdf Jearcher uploaded a new version of "File:Streetlighting removal procedure during construction.pdf"
- 09:57, 1 December 2014 diff hist +50 N File:Sample letter to KCP&L informing.docx sample letter to KCP&L informing to adjust billing
- 09:54, 1 December 2014 diff hist +76 N File:Sample letter to Black & McDonald holding.docx sample letter to Black & McDonald holding release of removal of streetlights
- 09:52, 1 December 2014 diff hist +87 N File:Sample letter to Black & McDonald releasing.docx sample letter to Black & McDonald releasing the removal of streetlights to construction current
- 09:51, 1 December 2014 diff hist +2 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 09:50, 1 December 2014 diff hist +1 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 09:41, 1 December 2014 diff hist 0 File:Streetlighting removal procedure during design.pdf Jearcher uploaded a new version of "File:Streetlighting removal procedure during design.pdf"
- 09:38, 1 December 2014 diff hist +54 N File:Sample letter requesting streetlight removal proposals.docx sample letter requesting streetlight removal proposals current
- 09:37, 1 December 2014 diff hist +1 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 10:57, 20 November 2014 diff hist +6 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:56, 20 November 2014 diff hist +11 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:55, 20 November 2014 diff hist −6 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:55, 20 November 2014 diff hist +6 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:53, 20 November 2014 diff hist −118 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:51, 20 November 2014 diff hist +168 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 10:41, 20 November 2014 diff hist +38 N File:Commerical Building Permit Application.pdf Commerical Building Permit Application current
- 09:26, 20 November 2014 diff hist +32 N File:Atmos Energy Cover Letter Sample.docx Atmos Energy Cover Letter Sample current
- 09:26, 20 November 2014 diff hist +43 N File:Atmos Energy Elevated Pressure Request Form.pdf Atmos Energy Elevated Pressure Request Form current
- 09:24, 20 November 2014 diff hist +38 N File:Atmos Energy new meter set application.xlsx Atmos Energy new meter set application current
- 09:23, 20 November 2014 diff hist −29 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 09:20, 20 November 2014 diff hist −4 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 09:20, 20 November 2014 diff hist +252 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 09:19, 20 November 2014 diff hist +8 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 09:18, 20 November 2014 diff hist −2 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 09:17, 20 November 2014 diff hist +234 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 17:52, 19 November 2014 diff hist −478 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 17:50, 19 November 2014 diff hist −1 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:49, 19 November 2014 diff hist +54 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:47, 19 November 2014 diff hist −678 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:46, 19 November 2014 diff hist +428 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:45, 19 November 2014 diff hist +675 Phase II - Preliminary Design →Task No. 26a - Coordinate Compressed Natural Gas (CNG) Service for Traffic Signals
- 17:42, 19 November 2014 diff hist +1 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 17:41, 19 November 2014 diff hist −2 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 17:40, 19 November 2014 diff hist +30 N File:Kansas Gas Cover Letter Sample.docx Kansas Gas Cover Letter Sample current
- 17:39, 19 November 2014 diff hist +100 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:36, 19 November 2014 diff hist +44 N File:Kansas Gas Service Line Application.docx Kansas Gas Service Line Application 11-10-14 current
- 17:36, 19 November 2014 diff hist +2 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:32, 19 November 2014 diff hist +41 N File:Atmos energy pre-approved contractors list.pdf Atmos Energy Pre-Approved Contractor List current
- 17:31, 19 November 2014 diff hist +125 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:26, 19 November 2014 diff hist +47 N File:Kansas city metro gas service area boundary map.pdf Kansas City Metro Gas Service Area Boundary Map current
- 17:25, 19 November 2014 diff hist −30 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:19, 19 November 2014 diff hist +38 N File:Natural gas service address procedures.pdf Natural Gas Service Address Procedures current
- 17:18, 19 November 2014 diff hist +12 Phase II - Preliminary Design →Task No. 26a - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:17, 19 November 2014 diff hist −53 Phase II - Preliminary Design →Task No. 26a - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:12, 19 November 2014 diff hist −1 Phase II - Preliminary Design
- 17:11, 19 November 2014 diff hist −1 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:11, 19 November 2014 diff hist −2 Phase II - Preliminary Design →Task No. 26b - Coordinate Removal of Streetlights Purchased from KCP&L
- 17:10, 19 November 2014 diff hist +568 Phase II - Preliminary Design
- 10:37, 18 November 2014 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx"
- 12:14, 17 November 2014 diff hist 0 File:V-7a contractor submittal checklist.xlsx Jearcher uploaded a new version of "File:V-7a contractor submittal checklist.xlsx"
- 08:34, 21 October 2014 diff hist 0 File:V-19a.docx Jearcher uploaded a new version of "File:V-19a.docx"
- 08:36, 6 October 2014 diff hist +35 N File:III-5a.docx Real Property Acquisition Checklist current
- 08:35, 6 October 2014 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 12:36, 3 October 2014 diff hist +27 Phase III - Final Design →Task No. 14 - Submit PS&E Package
- 12:21, 3 October 2014 diff hist −1 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 12:21, 3 October 2014 diff hist −4 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 12:20, 3 October 2014 diff hist −2 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 12:19, 3 October 2014 diff hist +5 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 12:16, 3 October 2014 diff hist +27 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 12:09, 3 October 2014 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 12:08, 3 October 2014 diff hist −4 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 12:07, 3 October 2014 diff hist +11 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 12:00, 3 October 2014 diff hist +27 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 08:33, 23 September 2014 diff hist +45 N File:IV-2f.docx Material Sampling and Testing Frequency Chart current
- 08:31, 23 September 2014 diff hist +1 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 10:13, 25 August 2014 diff hist +17 N File:VI-1d.docx Project Close Out current
- 10:11, 25 August 2014 diff hist +1 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 10:02, 25 August 2014 diff hist +1 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 10:01, 25 August 2014 diff hist 0 File:IV-20b Letting Summary Document.docx Jearcher uploaded a new version of "File:IV-20b Letting Summary Document.docx" current
- 09:41, 25 August 2014 diff hist −1 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 14:58, 15 July 2014 diff hist +35 N File:Sample streetlight removal proposal.pdf Sample streetlight removal proposal current
- 14:58, 15 July 2014 diff hist +54 N File:Sample letter requesting streetlight removal proposals.pdf Sample letter requesting streetlight removal proposals current
- 14:57, 15 July 2014 diff hist +46 N File:Streetlighting removal procedure during design.pdf Streetlighting Removal Procedure During Design
- 14:52, 15 July 2014 diff hist +477 Phase II - Preliminary Design →Task No. 26a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:42, 15 July 2014 diff hist −13 Phase II - Preliminary Design →Task No. 26a - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 14:40, 15 July 2014 diff hist −584 Phase II - Preliminary Design
- 14:39, 15 July 2014 diff hist −4 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 14:38, 15 July 2014 diff hist 0 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 14:38, 15 July 2014 diff hist +686 Phase II - Preliminary Design
- 14:33, 15 July 2014 diff hist +1 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:26, 15 July 2014 diff hist +68 N File:Sample letter to KCP&L informing.pdf Sample letter to KCP&L informing them of the removal of streetlights current
- 14:26, 15 July 2014 diff hist +65 N File:Sample letter to Black & McDonald holding.pdf Sample letter to Black & McDonald holding release of removal work current
- 14:25, 15 July 2014 diff hist +72 N File:Sample letter to Black & McDonald releasing.pdf Sample letter to Black & McDonald releasing removal work to construction current
- 14:24, 15 July 2014 diff hist +52 N File:Streetlighting removal procedure during construction.pdf Streetlighting Removal Procedure During Construction
- 14:17, 15 July 2014 diff hist +1 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:16, 15 July 2014 diff hist −2 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:16, 15 July 2014 diff hist +1 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:15, 15 July 2014 diff hist +71 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:08, 15 July 2014 diff hist −123 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:06, 15 July 2014 diff hist +179 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:03, 15 July 2014 diff hist +1 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:03, 15 July 2014 diff hist −33 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:01, 15 July 2014 diff hist +158 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 13:58, 15 July 2014 diff hist +1 Phase V - Construction →Task No. 12 - On-Going Inspections
- 13:58, 15 July 2014 diff hist −2 Phase V - Construction →Task No. 12 - On-Going Inspections
- 13:57, 15 July 2014 diff hist −2 Phase V - Construction →Task No. 12 - On-Going Inspections
- 13:56, 15 July 2014 diff hist −3 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 13:54, 15 July 2014 diff hist 0 Phase V - Construction →Task No. 11a - Coordinate Removal of Street lights Purchased for KCP&L
- 13:53, 15 July 2014 diff hist +539 Phase V - Construction
- 14:13, 30 June 2014 diff hist +33 N File:V-19a.docx Traffic Signal Project Data Sheet
- 14:12, 30 June 2014 diff hist −264 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 13:05, 30 June 2014 diff hist +1 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 13:04, 30 June 2014 diff hist 0 N File:V-19c.docx current
- 11:20, 30 June 2014 diff hist +31 N File:V-19b.doc Street Light Project Data Sheet
- 11:20, 30 June 2014 diff hist +33 N File:V-19a.doc Traffic Signal Project Data Sheet current
- 11:19, 30 June 2014 diff hist 0 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:13, 30 June 2014 diff hist +2 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:12, 30 June 2014 diff hist −2 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:12, 30 June 2014 diff hist +510 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:05, 30 June 2014 diff hist −2 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 11:05, 30 June 2014 diff hist +514 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 15:42, 3 June 2014 diff hist 0 File:V-13f.xlt Jearcher uploaded a new version of "File:V-13f.xlt": Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results. current
- 09:36, 31 March 2014 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 08:17, 19 March 2014 diff hist 0 File:V-7a contractor submittal checklist.xlsx Jearcher uploaded a new version of "File:V-7a contractor submittal checklist.xlsx"
- 17:28, 27 February 2014 diff hist 0 File:II-3o February 2014.xlsx Jearcher uploaded a new version of "File:II-3o February 2014.xlsx": List of Consulting Firms current
- 17:25, 27 February 2014 diff hist +24 N File:II-3o February 2014.xlsx List of Consulting Firms
- 17:25, 27 February 2014 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 12:27, 26 February 2014 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 12:26, 26 February 2014 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 12:19, 26 February 2014 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 11:59, 26 February 2014 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:41, 19 February 2014 diff hist 0 File:V-4d.dot Jearcher uploaded a new version of "File:V-4d.dot": distribution list of agencies and personnel to receive contracts and plans current
- 15:01, 12 December 2013 diff hist 0 File:IV-2a.docx Jearcher uploaded a new version of "File:IV-2a.docx": Material Testing/Geotechnical Service Companies
- 08:18, 10 October 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 11:55, 18 September 2013 diff hist +1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 11:43, 18 September 2013 diff hist +30 N File:V-22b.docx sample final inspection letter current
- 11:41, 18 September 2013 diff hist +1 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:41, 18 September 2013 diff hist −1 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:40, 18 September 2013 diff hist +1 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:34, 18 September 2013 diff hist −1 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:32, 18 September 2013 diff hist +1 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 11:20, 18 September 2013 diff hist 0 File:V-22b.dot Jearcher uploaded a new version of "File:V-22b.dot": sample final inspection letter current
- 11:49, 3 September 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 08:11, 14 August 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 15:09, 12 August 2013 diff hist 0 File:IV-2f.dot Jearcher uploaded a new version of "File:IV-2f.dot": Material Sampling and Testing Frequency Chart. Removed metric units, jea current
- 08:05, 9 August 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 11:54, 31 July 2013 diff hist −1 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 15:15, 2 July 2013 diff hist 0 File:V-22b.dot Jearcher uploaded a new version of "File:V-22b.dot": sample final inspection letter
- 15:04, 2 July 2013 diff hist +38 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 08:43, 24 June 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 08:57, 15 May 2013 diff hist 0 File:V-7a contractor submittal checklist.xlsx Jearcher uploaded a new version of "File:V-7a contractor submittal checklist.xlsx": contractors submittal checklist
- 07:57, 26 March 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx": list of Johnson County utility and pipeline companies
- 16:12, 11 January 2013 diff hist 0 File:II-7.docx Jearcher uploaded a new version of "File:II-7.docx"
- 16:15, 11 October 2012 diff hist 0 File:II-34a.docx Jearcher uploaded a new version of "File:II-32a.docx": City's qualified appraisers
- 10:08, 1 August 2012 diff hist +34 N File:III-11a-13.docx List of Utilities & Status of Same
- 10:07, 1 August 2012 diff hist +17 N File:III-11a-10.docx Table of Contents
- 10:07, 1 August 2012 diff hist +14 N File:III-11a-9.docx Statutory Bond
- 10:06, 1 August 2012 diff hist +16 N File:III-11a-8.docx Performance Bond
- 10:06, 1 August 2012 diff hist +31 N File:III-11a-7.docx Labor and Material Payment Bond
- 10:06, 1 August 2012 diff hist +5 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 09:50, 1 August 2012 diff hist +17 N File:III-11a-5.docx Insurance Options
- 09:50, 1 August 2012 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 09:39, 1 August 2012 diff hist +3 N File:III-11a-2.docx Bid
- 09:38, 1 August 2012 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:00, 4 June 2012 diff hist +4 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:00, 4 June 2012 diff hist +4 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:59, 4 June 2012 diff hist −5 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:59, 4 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:58, 4 June 2012 diff hist +8 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:55, 4 June 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:54, 4 June 2012 diff hist −1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:53, 4 June 2012 diff hist −54 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:52, 4 June 2012 diff hist +46 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:51, 4 June 2012 diff hist −1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:50, 4 June 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:50, 4 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:48, 4 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:31, 4 June 2012 diff hist 0 File:IV-5l.doc Jearcher uploaded a new version of "File:IV-5l.doc": list of plan rooms associated with DBE contractors
- 09:20, 16 May 2012 diff hist 0 File:II-9.dot uploaded a new version of "File:II-9.dot": list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers current
- 14:52, 7 May 2012 diff hist +24 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 14:51, 7 May 2012 diff hist +1 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 14:50, 7 May 2012 diff hist +3 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 14:45, 7 May 2012 diff hist +30 N File:Administrative Settlement Form.dot Administrative Settlement Form
- 14:40, 7 May 2012 diff hist +78 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 08:33, 23 April 2012 diff hist 0 File:II-3b(2).dot uploaded a new version of "File:II-3b(2).dot": City’s standard Supplemental Agreement for Professional Engineering Services. (Second and beyond
- 08:32, 23 April 2012 diff hist 0 File:II-3b(1).dot uploaded a new version of "File:II-3b(1).dot": City’s standard Supplemental Agreement for Professional Engineering Services. (First
- 15:23, 17 April 2012 diff hist 0 File:I-1.pdf uploaded a new version of "File:I-1a.pdf": Standard Bid Items
- 15:14, 17 April 2012 diff hist 0 Phase I - Vision →Task 1 - Prepare Preliminary Plans/Cost Estimate
- 18:09, 7 March 2012 diff hist 0 File:III-9a-3.dot uploaded a new version of "File:III-9a-3.dot": General Conditions for contracts over $50k
- 16:26, 28 February 2012 diff hist 0 File:II-3-4b.dot uploaded a new version of "File:II-3-4b.dot": Std. Engineering/Architectural agreement current
- 13:04, 22 February 2012 diff hist 0 File:IV-5l.doc uploaded a new version of "File:IV-5l.doc": list of plan rooms associated with DBE contractors
- 12:15, 6 February 2012 diff hist 0 File:III-9a-8a.dot uploaded a new version of "File:III-9a-8a.dot": Maintenance Bond for contracts over $50k
- 12:15, 6 February 2012 diff hist 0 File:III-11a-8.dot uploaded a new version of "File:III-9a-8.dot": Performance Bond for contracts over $50k
- 12:13, 6 February 2012 diff hist +35 N File:III-9a-8a.dot Performance Bond contracts over 50k
- 12:11, 6 February 2012 diff hist +57 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 12:05, 6 February 2012 diff hist 0 File:III-9a-4c.dot uploaded a new version of "File:III-9a-4c.dot": Instructions to bidders Option C for contracts over $50k
- 12:04, 6 February 2012 diff hist 0 File:III-9a-4b.dot uploaded a new version of "File:III-9a-4b.dot": Instructions to bidders Option B for contracts over $50k
- 12:03, 6 February 2012 diff hist 0 File:III-9a-4a.dot uploaded a new version of "File:III-9a-4a.dot": Instructions to bidders Option A for contracts over $50k
- 12:02, 6 February 2012 diff hist 0 File:III-9a-3.dot uploaded a new version of "File:III-9a-3.dot": General Conditions for contracts over $50k
- 11:52, 6 February 2012 diff hist 0 File:III-11a-2.dot uploaded a new version of "File:III-9a-2.dot": Bid for contracts over $50k
- 11:49, 6 February 2012 diff hist 0 File:III-11a-1.dot uploaded a new version of "File:III-9a-1.dot": Agreement for contracts over $50k
- 10:58, 6 February 2012 diff hist −112 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:52, 6 February 2012 diff hist +7 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:50, 6 February 2012 diff hist −7 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:39, 6 February 2012 diff hist −8 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:39, 6 February 2012 diff hist −38 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:25, 6 February 2012 diff hist 0 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:24, 6 February 2012 diff hist +28 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:23, 6 February 2012 diff hist +2 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:21, 6 February 2012 diff hist −4 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:20, 6 February 2012 diff hist −50 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:19, 6 February 2012 diff hist −4 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 10:17, 6 February 2012 diff hist +6 Phase III - Final Design →100px Task No. 9 - Submit Contract Documents and Insurance
- 14:20, 24 January 2012 diff hist −155 Phase II - Preliminary Design →Task No. 18 - Begin Title Report Process
- 17:06, 23 January 2012 diff hist −65 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 17:06, 23 January 2012 diff hist +29 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 17:02, 23 January 2012 diff hist +37 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 09:50, 13 January 2012 diff hist 0 File:II-16a.xlt uploaded a new version of "File:II-18a.xlt": list of land title companies to be considered in RFP requests
- 10:29, 2 December 2011 diff hist 0 File:II-9.dot uploaded a new version of "File:II-9.dot": list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers
- 10:19, 30 November 2011 diff hist 0 File:IV-5l.doc uploaded a new version of "File:IV-5l.doc": list of plan rooms associated with DBE contractors
- 10:18, 30 November 2011 diff hist 0 File:IV-5k.dot uploaded a new version of "File:IV-5k.dot": list of Architects current
- 09:07, 30 November 2011 diff hist 0 File:II-9.dot uploaded a new version of "File:II-9.dot": list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers
- 09:41, 28 November 2011 diff hist +33 N File:III-11a-12.pdf Appointment of Service Agent form