- 16:20, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 16:17, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 16:15, 3 July 2012 diff hist −28 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:56, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:56, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:55, 3 July 2012 diff hist −40 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:53, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:52, 3 July 2012 diff hist −8 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:51, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:49, 3 July 2012 diff hist +43 N File:IV-20c Breakout of construction costs.xlsx Breakout of Construction Costs by Work Type
- 15:48, 3 July 2012 diff hist +2 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:47, 3 July 2012 diff hist −42 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:26, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:25, 3 July 2012 diff hist +26 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:24, 3 July 2012 diff hist 0 N File:IV-20b Letting Summary Document.docx
- 15:20, 3 July 2012 diff hist 0 File:Iv-20c.xlt Irina Idelson uploaded a new version of "File:Iv-20c.xlt": Sample "Breakout of Construction Costs by Work Type"
- 15:18, 3 July 2012 diff hist 0 File:Iv-20b.dot Irina Idelson uploaded a new version of "File:Iv-20b.dot": Sample "Letting Summary Document"
- 15:00, 3 July 2012 diff hist 0 File:IV-19b.dot Irina Idelson uploaded a new version of "File:IV-19b.dot": Sample Rejection Letter sent to the unsuccessful bidders
- 14:58, 3 July 2012 diff hist 0 File:IV-19a.dot Irina Idelson uploaded a new version of "File:IV-19a.dot": Sample Award Letter sent to the successful bidder
- 14:52, 3 July 2012 diff hist +25 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 14:44, 3 July 2012 diff hist 0 File:IV-18c.xlsx Irina Idelson uploaded a new version of "File:IV-18c.xlsx": Project Cost Estimate Breakdown
- 14:02, 3 July 2012 diff hist 0 File:IV-18b.dot Irina Idelson uploaded a new version of "File:IV-18b.dot"
- 13:42, 3 July 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 13:42, 3 July 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 13:39, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 13:38, 3 July 2012 diff hist +29 N File:IV-13a.pdf Irina Idelson moved page File:IV-13a.pdf to File:IV-14a.pdf current
- 13:38, 3 July 2012 diff hist 0 m File:IV-14a.pdf Irina Idelson moved page File:IV-13a.pdf to File:IV-14a.pdf
- 13:37, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 13:36, 3 July 2012 diff hist +28 N File:IV-13.pdf Irina Idelson moved page File:IV-13.pdf to File:IV-14.pdf current
- 13:36, 3 July 2012 diff hist 0 m File:IV-14.pdf Irina Idelson moved page File:IV-13.pdf to File:IV-14.pdf
- 13:24, 3 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 11:40, 3 July 2012 diff hist −1 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:39, 3 July 2012 diff hist 0 File:III-11a-6 Notice to Bidders.docx Irina Idelson uploaded a new version of "File:III-11a-6 Notice to Bidders.docx"
- 11:35, 3 July 2012 diff hist −187 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:23, 3 July 2012 diff hist −1 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:23, 3 July 2012 diff hist −33 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:22, 3 July 2012 diff hist +76 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:19, 3 July 2012 diff hist −122 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:18, 3 July 2012 diff hist +47 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:15, 3 July 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:15, 3 July 2012 diff hist +71 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:04, 3 July 2012 diff hist −74 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 10:52, 3 July 2012 diff hist 0 File:III-11a-10a Table of Contents KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-10a Table of Contents KDOT.docx"
- 10:51, 3 July 2012 diff hist 0 File:III-11a-6a Notice to Bidders KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-6a Notice to Bidders KDOT.docx"
- 16:53, 2 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 16 - Receive Bid Approval from KDOT
- 16:53, 2 July 2012 diff hist +29 N File:Iv-18b.dot Irina Idelson moved page File:Iv-18b.dot to File:IV-16b.dot current
- 16:53, 2 July 2012 diff hist 0 m File:IV-17a.dot Irina Idelson moved page File:Iv-18b.dot to File:IV-16b.dot
- 16:35, 2 July 2012 diff hist −311 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 16:33, 2 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 16:31, 2 July 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 16:31, 2 July 2012 diff hist 0 N File:IV-18c.xlsx
- 16:27, 2 July 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 16:26, 2 July 2012 diff hist 0 m File:IV-18b.dot Irina Idelson moved page File:IV-16b.dot to File:IV-18b.dot
- 16:22, 2 July 2012 diff hist −6 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:22, 2 July 2012 diff hist +26 N File:IV-17d.dot Irina Idelson moved page File:IV-17d.dot to File:V-7.dot current
- 16:22, 2 July 2012 diff hist 0 m File:V-4e.dot Irina Idelson moved page File:IV-17d.dot to File:V-7.dot
- 16:19, 2 July 2012 diff hist +1 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:19, 2 July 2012 diff hist +310 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:06, 2 July 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 16:05, 2 July 2012 diff hist +214 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 11:06, 29 June 2012 diff hist −78 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:57, 29 June 2012 diff hist −76 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:56, 29 June 2012 diff hist −237 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:55, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 10:54, 29 June 2012 diff hist +29 N File:IV-19c.dot Irina Idelson moved page File:IV-19c.dot to File:IV-12b.dot current
- 10:54, 29 June 2012 diff hist 0 m File:IV-12b.dot Irina Idelson moved page File:IV-19c.dot to File:IV-12b.dot
- 10:52, 29 June 2012 diff hist +238 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 10:51, 29 June 2012 diff hist −175 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:46, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:43, 29 June 2012 diff hist +29 N File:IV-17c.dot Irina Idelson moved page File:IV-17c.dot to File:IV-19c.dot current
- 10:43, 29 June 2012 diff hist 0 m File:IV-12b.dot Irina Idelson moved page File:IV-17c.dot to File:IV-19c.dot
- 10:43, 29 June 2012 diff hist +29 N File:IV-17b.dot Irina Idelson moved page File:IV-17b.dot to File:IV-19b.dot current
- 10:43, 29 June 2012 diff hist 0 m File:IV-19b.dot Irina Idelson moved page File:IV-17b.dot to File:IV-19b.dot
- 10:42, 29 June 2012 diff hist 0 m File:IV-19a.dot Irina Idelson moved page File:IV-17a.dot to File:IV-19a.dot
- 10:20, 29 June 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:13, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:11, 29 June 2012 diff hist −162 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:10, 29 June 2012 diff hist +163 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:09, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:08, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 10:07, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 10:04, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 10:03, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 17 - Receive Concurrence and Award from KDOT
- 10:03, 29 June 2012 diff hist +28 N File:Iv-19.pdf Irina Idelson moved page File:Iv-19.pdf to File:IV-17.pdf current
- 09:11, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 09:10, 29 June 2012 diff hist +29 N File:IV-16a.pdf Irina Idelson moved page File:IV-16a.pdf to File:IV-18a.pdf
- 09:10, 29 June 2012 diff hist 0 m File:IV-18a.pdf Irina Idelson moved page File:IV-16a.pdf to File:IV-18a.pdf
- 09:04, 29 June 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 16 - Receive Bid Approval from KDOT
- 09:02, 29 June 2012 diff hist +29 N File:Iv-18a.dot Irina Idelson moved page File:Iv-18a.dot to File:IV-16a.dot current
- 09:02, 29 June 2012 diff hist 0 m File:IV-16a.dot Irina Idelson moved page File:Iv-18a.dot to File:IV-16a.dot
- 08:51, 29 June 2012 diff hist −540 Phase IV - Pre-Construction →Task No. 19 - Receive Concurrence and Award from KDOT
- 08:50, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 17 - Award Contract by City Council
- 08:49, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 16 - Submit Staff Recommendation for Contract Award
- 08:48, 29 June 2012 diff hist +539 Phase IV - Pre-Construction →Task No. 16 - Receive Bid Approval from KDOT
- 08:47, 29 June 2012 diff hist −477 Phase IV - Pre-Construction →Task No. 18 - Receive Bid Approval from KDOT
- 08:46, 29 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 18 - Receive Bid Approval from KDOT
- 08:46, 29 June 2012 diff hist +476 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 17:08, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 17:04, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 17:03, 28 June 2012 diff hist +20 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 16:58, 28 June 2012 diff hist −136 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 16:56, 28 June 2012 diff hist +30 N File:15.0 LPA-Administered Procedures 10-2011.pdf LPA Project Development Manual
- 16:55, 28 June 2012 diff hist +348 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 16:40, 28 June 2012 diff hist −857 Phase IV - Pre-Construction →Task No. 14 - Evaluate Possible Contractor Collusion
- 16:40, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 16:40, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 14 - Evaluate Possible Contractor Collusion
- 16:39, 28 June 2012 diff hist +857 Phase IV - Pre-Construction →Task No. 13 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 16:29, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 16:29, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Sub-Contractor Percent of Work
- 16:20, 28 June 2012 diff hist +2 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 16:19, 28 June 2012 diff hist +30 N File:IV-11.xlsx sample detailed bid tabulation
- 16:09, 28 June 2012 diff hist 0 File:IV-11.xlt Irina Idelson uploaded a new version of "File:IV-11.xlt": sample detailed bid tabulation
- 16:03, 28 June 2012 diff hist 0 File:IV-11.xlt Irina Idelson uploaded a new version of "File:IV-11.xlt": sample bid tabulation form
- 16:00, 28 June 2012 diff hist 0 File:IV-10.dot Irina Idelson uploaded a new version of "File:IV-10.dot": sample bid tabulation form
- 15:48, 28 June 2012 diff hist +9 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 15:47, 28 June 2012 diff hist +2 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Document/Addendum
- 15:24, 28 June 2012 diff hist 0 File:IV-7.dot Irina Idelson uploaded a new version of "File:IV-7.dot"
- 15:19, 28 June 2012 diff hist +8 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:19, 28 June 2012 diff hist +37 N File:Exhibit IV-6.docx Engineer's construction cost estimate
- 15:17, 28 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:16, 28 June 2012 diff hist 0 N File:Exibit IV-6.docx
- 15:03, 28 June 2012 diff hist 0 File:IV-6.dot Irina Idelson uploaded a new version of "File:IV-6.dot"
- 14:18, 28 June 2012 diff hist −13 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:16, 28 June 2012 diff hist 0 File:III-11a-2a Bid-KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-2a Bid-KDOT.docx"
- 14:14, 28 June 2012 diff hist 0 File:III-11a-6 Notice to Bidders.docx Irina Idelson uploaded a new version of "File:III-11a-6 Notice to Bidders.docx"
- 14:03, 28 June 2012 diff hist +34 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:02, 28 June 2012 diff hist 0 N File:III-11a-12 Appointment of Service Agent form.pdf
- 14:00, 28 June 2012 diff hist 0 File:III-11a-13.dot Irina Idelson uploaded a new version of "File:III-11a-13.dot"
- 14:00, 28 June 2012 diff hist 0 File:III-11a-12.pdf Irina Idelson uploaded a new version of "File:III-11a-12.pdf"
- 13:58, 28 June 2012 diff hist +39 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:57, 28 June 2012 diff hist 0 N File:III-11a-10b Table of Contents CDBG.docx
- 13:56, 28 June 2012 diff hist 0 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:55, 28 June 2012 diff hist +37 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:54, 28 June 2012 diff hist 0 N File:III-11a-10a Table of Contents KDOT.docx
- 13:54, 28 June 2012 diff hist 0 File:III-11a-10.dot Irina Idelson uploaded a new version of "File:III-11a-10.dot"
- 13:52, 28 June 2012 diff hist +17 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:52, 28 June 2012 diff hist 0 N File:III-11a-8a Maintenance Bond.docx
- 13:50, 28 June 2012 diff hist 0 File:III-11a-9.dot Irina Idelson uploaded a new version of "File:III-11a-9.dot"
- 13:48, 28 June 2012 diff hist 0 File:III-11a-8.dot Irina Idelson uploaded a new version of "File:III-11a-8.dot"
- 13:46, 28 June 2012 diff hist 0 File:III-11a-7.dot Irina Idelson uploaded a new version of "File:III-11a-7.dot"
- 13:45, 28 June 2012 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:44, 28 June 2012 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:44, 28 June 2012 diff hist 0 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 13:43, 28 June 2012 diff hist 0 File:III-11a-6a Notice to Bidders KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-6a Notice to Bidders KDOT.docx"
- 11:56, 28 June 2012 diff hist 0 File:III-11a-2b BID-CDBG.docx Irina Idelson uploaded a new version of "File:III-11a-2b BID-CDBG.docx"
- 11:55, 28 June 2012 diff hist 0 File:III-11a-2a Bid-KDOT.docx Irina Idelson uploaded a new version of "File:III-11a-2a Bid-KDOT.docx"
- 11:55, 28 June 2012 diff hist 0 File:III-11a-2.dot Irina Idelson uploaded a new version of "File:III-11a-2.dot"
- 11:53, 28 June 2012 diff hist 0 File:III-11a-1 Agreement-over $50k.docx Irina Idelson uploaded a new version of "File:III-11a-1 Agreement-over $50k.docx"
- 11:50, 28 June 2012 diff hist +36 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:49, 28 June 2012 diff hist 0 N File:III-11a-6b Notice to Bidders-CDBG.docx
- 11:44, 28 June 2012 diff hist +36 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:42, 28 June 2012 diff hist 0 N File:III-11a-6a Notice to Bidders KDOT.docx
- 11:22, 28 June 2012 diff hist +19 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:22, 28 June 2012 diff hist 0 N File:III-11a-6 Notice to Bidders.docx
- 11:19, 28 June 2012 diff hist +33 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:19, 28 June 2012 diff hist 0 N File:III-11a-4b Instructions to Bidders-Option B.docx
- 11:18, 28 June 2012 diff hist +33 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:18, 28 June 2012 diff hist 0 N File:III-11a-4a Instructions to Bidders-Option A.docx
- 11:15, 28 June 2012 diff hist +33 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 11:07, 28 June 2012 diff hist 0 File:III-11a-3.docx Irina Idelson uploaded a new version of "File:III-11a-3.docx"
- 10:45, 28 June 2012 diff hist +24 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 10:43, 28 June 2012 diff hist 0 N File:III-11a-2b BID-CDBG.docx
- 10:42, 28 June 2012 diff hist +22 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 10:39, 28 June 2012 diff hist 0 N File:III-11a-2a Bid-KDOT.docx
- 10:38, 28 June 2012 diff hist 0 File:III-11a-2.dot Irina Idelson uploaded a new version of "File:III-11a-2.dot"
- 10:36, 28 June 2012 diff hist +21 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 10:34, 28 June 2012 diff hist 0 N File:III-11a-1 Agreement-over $50k.docx
- 14:43, 13 June 2012 diff hist −4 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:42, 13 June 2012 diff hist +72 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:40, 13 June 2012 diff hist +1 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 14:40, 13 June 2012 diff hist 0 N File:IV-6.dotx
- 14:26, 13 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 11:14, 13 June 2012 diff hist 0 File:IV-2b.dot Irina Idelson uploaded a new version of "File:IV-2b.dot"
- 11:00, 13 June 2012 diff hist 0 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals
- 11:00, 13 June 2012 diff hist 0 N File:IV-2a.dotx
- 09:59, 13 June 2012 diff hist −42 Phase IV - Pre-Construction →Task No. 2 - Distribute Material Testing Proposals frame|80px
- 09:56, 13 June 2012 diff hist −492 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 09:49, 13 June 2012 diff hist −2 Phase V - Construction →Task N0. 8 - Complete Contractor Permits
- 09:48, 13 June 2012 diff hist +315 Phase V - Construction →Task N0. 8 - Complete Contractor Permits
- 09:45, 13 June 2012 diff hist −258 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 09:43, 13 June 2012 diff hist +8 Phase V - Construction →Task N0. 8 - Complete Contractor Permits
- 09:42, 13 June 2012 diff hist +304 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 09:37, 13 June 2012 diff hist +1 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 09:37, 13 June 2012 diff hist −328 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 16:21, 12 June 2012 diff hist −11 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 15:41, 12 June 2012 diff hist +320 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 15:40, 12 June 2012 diff hist −16 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 15:34, 12 June 2012 diff hist −34 File:III-11a-4a.dotx Instructions to Bidders - Option A
- 15:32, 12 June 2012 diff hist +34 File:III-11a-4a.dotx
- 15:30, 12 June 2012 diff hist +3 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:28, 12 June 2012 diff hist 0 File:III-11a-8a.dotx Irina Idelson uploaded a new version of "File:III-11a-8a.dotx": Maintenance Bond for contracts over $50k
- 15:27, 12 June 2012 diff hist 0 N File:III-11a-8a.dotx
- 15:20, 12 June 2012 diff hist +3 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:19, 12 June 2012 diff hist +37 N File:III-11a-4c.dotx Instruction to Contractors - Option C
- 15:15, 12 June 2012 diff hist +3 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:14, 12 June 2012 diff hist 0 N File:III-11a-4b.dotx
- 15:11, 12 June 2012 diff hist +3 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 15:08, 12 June 2012 diff hist 0 N File:III-11a-4a.dotx
- 15:06, 12 June 2012 diff hist 0 File:III-9a-4a.dot Irina Idelson uploaded a new version of "File:III-9a-4a.dot"
- 14:41, 12 June 2012 diff hist 0 File:III-9a-4a.dot Irina Idelson uploaded a new version of "File:III-9a-4a.dot"
- 14:38, 12 June 2012 diff hist 0 File:III-9a-4a.dot Irina Idelson uploaded a new version of "File:III-9a-4a.dot"
- 14:31, 12 June 2012 diff hist +1 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 14:30, 12 June 2012 diff hist +2 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 14:30, 12 June 2012 diff hist +91 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 14:29, 12 June 2012 diff hist +48 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 14:18, 12 June 2012 diff hist +10 Phase IV - Pre-Construction →Task No. 1 - Complete Plans, Specifications and Estimate
- 14:14, 12 June 2012 diff hist −9 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 14:03, 12 June 2012 diff hist −1 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 14:02, 12 June 2012 diff hist −42 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 14:01, 12 June 2012 diff hist +198 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 11:50, 12 June 2012 diff hist −31 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 11:45, 12 June 2012 diff hist −36 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review |120px|right
- 11:42, 12 June 2012 diff hist +9 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 15:23, 8 June 2012 diff hist +2 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 15:22, 8 June 2012 diff hist +33 N File:III-9a-3.docx Irina Idelson moved page File:III-9a-3.docx to File:III-11a-3.docx current
- 15:22, 8 June 2012 diff hist 0 m File:III-11a-3.docx Irina Idelson moved page File:III-9a-3.docx to File:III-11a-3.docx
- 15:22, 8 June 2012 diff hist +1 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 15:21, 8 June 2012 diff hist 0 N File:III-11a-3.docx
- 15:18, 8 June 2012 diff hist 0 File:III-9a-3.dot Irina Idelson uploaded a new version of "File:III-9a-3.dot"
- 15:04, 8 June 2012 diff hist 0 File:III-9a-3.dot Irina Idelson uploaded a new version of "File:III-9a-3.dot"
- 14:59, 8 June 2012 diff hist +33 N File:III-9a-12.pdf Irina Idelson moved page File:III-9a-12.pdf to File:III-11a-12.pdf current
- 14:59, 8 June 2012 diff hist 0 m File:III-11a-12.pdf Irina Idelson moved page File:III-9a-12.pdf to File:III-11a-12.pdf
- 14:54, 8 June 2012 diff hist +1 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 14:54, 8 June 2012 diff hist +17 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 14:49, 8 June 2012 diff hist +22 Phase III - Final Design →100px Task No. 11 - Submit Contract Documents and Insurance
- 14:44, 8 June 2012 diff hist +33 N File:III-9a-13.dot Irina Idelson moved page File:III-9a-13.dot to File:III-11a-13.dot current
- 14:44, 8 June 2012 diff hist 0 m File:III-11a-13.dot Irina Idelson moved page File:III-9a-13.dot to File:III-11a-13.dot
- 14:44, 8 June 2012 diff hist +33 N File:III-9a-12.dot Irina Idelson moved page File:III-9a-12.dot to File:III-11a-12.dot current
- 14:44, 8 June 2012 diff hist 0 m File:III-11a-12.dot Irina Idelson moved page File:III-9a-12.dot to File:III-11a-12.dot
- 14:43, 8 June 2012 diff hist +33 N File:III-9a-11.dot Irina Idelson moved page File:III-9a-11.dot to File:III-11a-11.dot current
- 14:43, 8 June 2012 diff hist 0 m File:III-11a-11.dot Irina Idelson moved page File:III-9a-11.dot to File:III-11a-11.dot
- 14:43, 8 June 2012 diff hist +33 N File:III-9a-10.dot Irina Idelson moved page File:III-9a-10.dot to File:III-11a-10.dot current
- 14:43, 8 June 2012 diff hist 0 m File:III-11a-10.dot Irina Idelson moved page File:III-9a-10.dot to File:III-11a-10.dot
- 14:42, 8 June 2012 diff hist +32 N File:III-9a-9.dot Irina Idelson moved page File:III-9a-9.dot to File:III-11a-9.dot current
- 14:42, 8 June 2012 diff hist 0 m File:III-11a-9.dot Irina Idelson moved page File:III-9a-9.dot to File:III-11a-9.dot
- 14:41, 8 June 2012 diff hist +32 N File:III-9a-8.dot Irina Idelson moved page File:III-9a-8.dot to File:III-11a-8.dot current
- 14:41, 8 June 2012 diff hist 0 m File:III-11a-8.dot Irina Idelson moved page File:III-9a-8.dot to File:III-11a-8.dot
- 14:40, 8 June 2012 diff hist +32 N File:III-9a-7.dot Irina Idelson moved page File:III-9a-7.dot to File:III-11a-7.dot current
- 14:40, 8 June 2012 diff hist 0 m File:III-11a-7.dot Irina Idelson moved page File:III-9a-7.dot to File:III-11a-7.dot
- 14:40, 8 June 2012 diff hist +32 N File:III-9a-6.dot Irina Idelson moved page File:III-9a-6.dot to File:III-11a-6.dot current
- 14:40, 8 June 2012 diff hist 0 m File:III-11a-6.dot Irina Idelson moved page File:III-9a-6.dot to File:III-11a-6.dot
- 14:40, 8 June 2012 diff hist +32 N File:III-9a-5.dot Irina Idelson moved page File:III-9a-5.dot to File:III-11a-5.dot current
- 14:40, 8 June 2012 diff hist 0 m File:III-11a-5.dot Irina Idelson moved page File:III-9a-5.dot to File:III-11a-5.dot
- 14:38, 8 June 2012 diff hist +32 N File:III-9a-2.dot Irina Idelson moved page File:III-9a-2.dot to File:III-11a-2.dot current
- 14:38, 8 June 2012 diff hist 0 m File:III-11a-2.dot Irina Idelson moved page File:III-9a-2.dot to File:III-11a-2.dot
- 14:37, 8 June 2012 diff hist +32 N File:III-9a-1.dot Irina Idelson moved page File:III-9a-1.dot to File:III-11a-1.dot current
- 14:37, 8 June 2012 diff hist 0 m File:III-11a-1.dot Irina Idelson moved page File:III-9a-1.dot to File:III-11a-1.dot
- 14:35, 8 June 2012 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:30, 8 June 2012 diff hist −105 Phase III - Final Design →Task No. 13 - Prepare Design Summary Document
- 13:54, 8 June 2012 diff hist +30 N File:III-14a.dot Irina Idelson moved page File:III-14a.dot to File:III-13a.dot current