- 15:24, 6 June 2012 diff hist 0 Phase III - Final Design →Task No. 4 - Begin R/W / Easement Negotiations
- 15:19, 6 June 2012 diff hist 0 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:13, 6 June 2012 diff hist 0 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 11:58, 6 June 2012 diff hist +277 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 11:52, 6 June 2012 diff hist +667 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 11:44, 6 June 2012 diff hist +47 Phase III - Final Design →Task No. 3 - Complete Environmental Process by KDOT
- 11:39, 6 June 2012 diff hist −1 Phase III - Final Design →Task No. 12 - Complete Environmental Process by KDOT
- 11:38, 6 June 2012 diff hist +681 Phase III - Final Design →Task No. 2 - Execute Utility Agreements
- 10:48, 6 June 2012 diff hist 0 Phase III - Final Design →Task No. 6 - Acquire R/W / Easement - Submit KDOT Forms 1306 and 1304 {{KDOT}}
- 10:15, 6 June 2012 diff hist 0 File:III-4a.dot Irina Idelson uploaded a new version of "File:III-4a.dot"
- 16:57, 5 June 2012 diff hist +2 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:55, 5 June 2012 diff hist 0 File:06.0 Right of Way 10-2011.pdf Irina Idelson uploaded a new version of "File:06.0 Right of Way 10-2011.pdf"
- 16:54, 5 June 2012 diff hist −113 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:38, 5 June 2012 diff hist +258 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:34, 5 June 2012 diff hist 0 N File:06.0 Right of Way 10-2011.pdf
- 16:31, 5 June 2012 diff hist −12 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:27, 5 June 2012 diff hist +29 N File:II-34i.dot Irina Idelson moved page File:II-34i.dot to File:III-3d.dot current
- 16:27, 5 June 2012 diff hist 0 m File:III-5d.dot Irina Idelson moved page File:II-34i.dot to File:III-3d.dot
- 16:26, 5 June 2012 diff hist +29 N File:II-34h.dot Irina Idelson moved page File:II-34h.dot to File:III-3c.dot current
- 16:26, 5 June 2012 diff hist 0 m File:III-5c.dot Irina Idelson moved page File:II-34h.dot to File:III-3c.dot
- 15:45, 5 June 2012 diff hist −47 Phase III - Final Design →Notes
- 15:45, 5 June 2012 diff hist −12 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:12, 5 June 2012 diff hist 0 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:56, 4 June 2012 diff hist −184 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:01, 4 June 2012 diff hist +2 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 16:01, 4 June 2012 diff hist +3 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:58, 4 June 2012 diff hist −3 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:58, 4 June 2012 diff hist −4 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:57, 4 June 2012 diff hist −29 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:56, 4 June 2012 diff hist −201 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 15:10, 4 June 2012 diff hist 0 Phase III - Final Design →Task No. 3 - Begin R/W / Easement Negotiations
- 14:42, 4 June 2012 diff hist 0 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 14:42, 4 June 2012 diff hist 0 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 14:41, 4 June 2012 diff hist 0 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 14:38, 4 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 14:37, 4 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:37, 4 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:37, 4 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:32, 4 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 14:31, 4 June 2012 diff hist 0 N File:II-34a.docx
- 14:28, 4 June 2012 diff hist 0 File:II-33a.dot Irina Idelson uploaded a new version of "File:II-33a.dot" current
- 16:50, 1 June 2012 diff hist −4 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 16:35, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 16:34, 1 June 2012 diff hist +28 N File:II-7i.xlt Irina Idelson moved page File:II-7i.xlt to File:II-7j.xlt current
- 16:34, 1 June 2012 diff hist 0 m File:II-7j.xlt Irina Idelson moved page File:II-7i.xlt to File:II-7j.xlt current
- 16:25, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 16:25, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 16:24, 1 June 2012 diff hist 0 N File:II-7.docx
- 16:07, 1 June 2012 diff hist +28 N File:II-9i.xlt Irina Idelson moved page File:II-9i.xlt to File:II-7i.xlt current
- 16:07, 1 June 2012 diff hist 0 m File:II-7j.xlt Irina Idelson moved page File:II-9i.xlt to File:II-7i.xlt
- 16:07, 1 June 2012 diff hist 0 File:II-7j.xlt Irina Idelson uploaded a new version of "File:II-9i.xlt"
- 15:52, 1 June 2012 diff hist −5 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 15:41, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 15:40, 1 June 2012 diff hist +29 N File:II-35c.dot Irina Idelson moved page File:II-35c.dot to File:II-34c.dot current
- 15:40, 1 June 2012 diff hist 0 m File:II-34c.dot Irina Idelson moved page File:II-35c.dot to File:II-34c.dot
- 15:40, 1 June 2012 diff hist +29 N File:II-35b.dot Irina Idelson moved page File:II-35b.dot to File:II-34b.dot current
- 15:40, 1 June 2012 diff hist 0 m File:II-34b.dot Irina Idelson moved page File:II-35b.dot to File:II-34b.dot
- 15:39, 1 June 2012 diff hist +29 N File:II-35a.dot Irina Idelson moved page File:II-35a.dot to File:II-34a.dot current
- 15:39, 1 June 2012 diff hist 0 m File:II-34a.dot Irina Idelson moved page File:II-35a.dot to File:II-34a.dot
- 15:36, 1 June 2012 diff hist +28 N File:II-35.dot Irina Idelson moved page File:II-35.dot to File:II-34.dot current
- 15:34, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 15:31, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 35 - Schedule Second Public Information Meeting
- 15:27, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:26, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 15:25, 1 June 2012 diff hist +8 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 14:58, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 14:56, 1 June 2012 diff hist +29 N File:II-33h.dot Irina Idelson moved page File:II-33h.dot to File:II-32h.dot current
- 14:56, 1 June 2012 diff hist 0 m File:II-34i appraisal review.dot Irina Idelson moved page File:II-33h.dot to File:II-32h.dot
- 14:55, 1 June 2012 diff hist +8 Phase II - Preliminary Design →Task No. 33 - Hire Appraiser
- 14:54, 1 June 2012 diff hist +29 N File:II-33g.dot Irina Idelson moved page File:II-33g.dot to File:II-32g.dot current
- 14:54, 1 June 2012 diff hist 0 m File:II-32g.dot Irina Idelson moved page File:II-33g.dot to File:II-32g.dot
- 14:54, 1 June 2012 diff hist +29 N File:II-33f.dot Irina Idelson moved page File:II-33f.dot to File:II-32f.dot current
- 14:54, 1 June 2012 diff hist 0 m File:II-32f.dot Irina Idelson moved page File:II-33f.dot to File:II-32f.dot
- 14:54, 1 June 2012 diff hist +29 N File:II-33e.dot Irina Idelson moved page File:II-33e.dot to File:II-32e.dot current
- 14:54, 1 June 2012 diff hist 0 m File:II-32e.dot Irina Idelson moved page File:II-33e.dot to File:II-32e.dot
- 14:54, 1 June 2012 diff hist +29 N File:II-33d.dot Irina Idelson moved page File:II-33d.dot to File:II-32d.dot current
- 14:54, 1 June 2012 diff hist 0 m File:II-32d.dot Irina Idelson moved page File:II-33d.dot to File:II-32d.dot
- 14:53, 1 June 2012 diff hist +29 N File:II-33b.dot Irina Idelson moved page File:II-33b.dot to File:II-32b.dot current
- 14:53, 1 June 2012 diff hist 0 m File:II-32b.dot Irina Idelson moved page File:II-33b.dot to File:II-32b.dot
- 14:44, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 31 - Submit R/W Plans/Legal Descriptions
- 14:43, 1 June 2012 diff hist +29 N File:II-32c.pdf Irina Idelson moved page File:II-32c.pdf to File:II-31c.pdf current
- 14:43, 1 June 2012 diff hist 0 m File:II-33c.pdf Irina Idelson moved page File:II-32c.pdf to File:II-31c.pdf
- 14:42, 1 June 2012 diff hist +29 N File:II-32b.pdf Irina Idelson moved page File:II-32b.pdf to File:II-31b.pdf current
- 14:42, 1 June 2012 diff hist 0 m File:II-33b.pdf Irina Idelson moved page File:II-32b.pdf to File:II-31b.pdf
- 14:42, 1 June 2012 diff hist +29 N File:II-32a.pdf Irina Idelson moved page File:II-32a.pdf to File:II-31a.pdf current
- 14:42, 1 June 2012 diff hist 0 m File:II-33a.pdf Irina Idelson moved page File:II-32a.pdf to File:II-31a.pdf
- 14:42, 1 June 2012 diff hist +28 N File:II-32.pdf Irina Idelson moved page File:II-32.pdf to File:II-31.pdf current
- 14:42, 1 June 2012 diff hist 0 m File:II-31.pdf Irina Idelson moved page File:II-32.pdf to File:II-31.pdf
- 14:41, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 31 - Submit R/W Plans/Legal Descriptions
- 14:39, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 32 - Submit R/W Plans/Legal Descriptions
- 14:38, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 31 - Obtain Decision for Design Exception from KDOT
- 14:37, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 14:37, 1 June 2012 diff hist +151 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 14:36, 1 June 2012 diff hist +52 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 14:30, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 30 - Execute Official Agreement with KDOT
- 14:29, 1 June 2012 diff hist +29 N File:II-30a.dot Irina Idelson moved page File:II-30a.dot to File:II-28a.dot current
- 14:29, 1 June 2012 diff hist 0 m File:II-28a.dot Irina Idelson moved page File:II-30a.dot to File:II-28a.dot
- 14:28, 1 June 2012 diff hist +28 N File:II-30.pdf Irina Idelson moved page File:II-30.pdf to File:II-28.pdf current
- 14:28, 1 June 2012 diff hist 0 m File:II-28.pdf Irina Idelson moved page File:II-30.pdf to File:II-28.pdf
- 14:09, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 14:07, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 14:07, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 14:07, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 14:06, 1 June 2012 diff hist +8 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 14:05, 1 June 2012 diff hist +602 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 11:58, 1 June 2012 diff hist −615 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 11:58, 1 June 2012 diff hist +704 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 11:50, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 11:12, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:11, 1 June 2012 diff hist +29 N File:II-25o.pdf Irina Idelson moved page File:II-25o.pdf to File:II-24o.pdf current
- 11:11, 1 June 2012 diff hist 0 m File:KDOT Forms Instructions.pdf Irina Idelson moved page File:II-25o.pdf to File:II-24o.pdf
- 11:11, 1 June 2012 diff hist +29 N File:II-25n.dot Irina Idelson moved page File:II-25n.dot to File:II-24n.dot current
- 11:11, 1 June 2012 diff hist 0 m File:II-24n.dot Irina Idelson moved page File:II-25n.dot to File:II-24n.dot
- 11:10, 1 June 2012 diff hist +29 N File:II-25m.pdf Irina Idelson moved page File:II-25m.pdf to File:II-24m.pdf current
- 11:10, 1 June 2012 diff hist 0 m File:II-24m.pdf Irina Idelson moved page File:II-25m.pdf to File:II-24m.pdf
- 11:10, 1 June 2012 diff hist +29 N File:II-25l.dot Irina Idelson moved page File:II-25l.dot to File:II-24l.dot current
- 11:10, 1 June 2012 diff hist 0 m File:II-24l.dot Irina Idelson moved page File:II-25l.dot to File:II-24l.dot
- 11:10, 1 June 2012 diff hist +29 N File:II-25k.dot Irina Idelson moved page File:II-25k.dot to File:II-24k.dot current
- 11:10, 1 June 2012 diff hist 0 m File:II-24k.dot Irina Idelson moved page File:II-25k.dot to File:II-24k.dot
- 11:09, 1 June 2012 diff hist +29 N File:II-25j.pdf Irina Idelson moved page File:II-25j.pdf to File:II-24j.pdf current
- 11:09, 1 June 2012 diff hist 0 m File:II-24j.pdf Irina Idelson moved page File:II-25j.pdf to File:II-24j.pdf current
- 11:05, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 11:04, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 22 - Prepare Preliminary Cash Flow Projection (update)
- 11:04, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 21 - Prepare Preliminary Cost Estimate (update)
- 11:04, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 11:04, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 19 - Prepare Field Check Plans
- 11:04, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:03, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:03, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 16 - Begin Title Report Process
- 11:02, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:02, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:02, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:01, 1 June 2012 diff hist −2 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:01, 1 June 2012 diff hist +2 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:01, 1 June 2012 diff hist +8 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:00, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 10:59, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 10:59, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 12 - Agency Agreement (if Applicable)
- 10:58, 1 June 2012 diff hist +10 Phase II - Preliminary Design →Task No. 12 - Agency Agreement (if Applicable)
- 10:58, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 11 - SMAC Preliminary Study
- 10:58, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 10:57, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 8 - Pre-Design Meeting
- 10:57, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 10:57, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 6 - Submit Cash Flow Projections (Engineering Cost)
- 10:56, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 5 - Prepare Project Schedule
- 10:55, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 4 - Submit Project Description to Law Department. Execute Ordinances-Resolution.
- 10:55, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 2 - Decide if City Staff to Design
- 10:55, 1 June 2012 diff hist +9 Phase II - Preliminary Design →Task No. 1 - Identify Project Team
- 10:54, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:54, 1 June 2012 diff hist +8 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:52, 1 June 2012 diff hist −296 Phase II - Preliminary Design →Task No. 27 - Prepare Preliminary Cash Flow Projection (update)
- 10:52, 1 June 2012 diff hist −352 Phase II - Preliminary Design →Task No. 26 - Prepare Preliminary Cost Estimate (update)
- 10:49, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:48, 1 June 2012 diff hist +29 N File:II-22i.pdf Irina Idelson moved page File:II-22i.pdf to File:II-24i.pdf current
- 10:48, 1 June 2012 diff hist 0 m File:II-24f.pdf Irina Idelson moved page File:II-22i.pdf to File:II-24i.pdf
- 10:48, 1 June 2012 diff hist +29 N File:II-22f.dot Irina Idelson moved page File:II-22f.dot to File:II-24f.dot current
- 10:48, 1 June 2012 diff hist 0 m File:II-24f.dot Irina Idelson moved page File:II-22f.dot to File:II-24f.dot
- 10:47, 1 June 2012 diff hist +29 N File:II-22e.pdf Irina Idelson moved page File:II-22e.pdf to File:II-24e.pdf current
- 10:47, 1 June 2012 diff hist 0 m File:II-24d.pdf Irina Idelson moved page File:II-22e.pdf to File:II-24e.pdf
- 10:46, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:45, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:44, 1 June 2012 diff hist +29 N File:II-22c.pdf Irina Idelson moved page File:II-22c.pdf to File:II-24c.pdf current
- 10:44, 1 June 2012 diff hist 0 m File:II-24c.pdf Irina Idelson moved page File:II-22c.pdf to File:II-24c.pdf
- 10:44, 1 June 2012 diff hist +29 N File:II-22b.pdf Irina Idelson moved page File:II-22b.pdf to File:II-24b.pdf current
- 10:44, 1 June 2012 diff hist 0 m File:II-24b.pdf Irina Idelson moved page File:II-22b.pdf to File:II-24b.pdf
- 10:33, 1 June 2012 diff hist +29 N File:II-22a.pdf Irina Idelson moved page File:II-22a.pdf to File:II-24a.pdf current
- 10:33, 1 June 2012 diff hist 0 m File:II-24a.pdf Irina Idelson moved page File:II-22a.pdf to File:II-24a.pdf
- 10:31, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 10:30, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 10:30, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 27 - Prepare Preliminary Cash Flow Projection (update)
- 10:29, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 26 - Prepare Preliminary Cost Estimate (update)
- 10:16, 1 June 2012 diff hist +296 Phase II - Preliminary Design →Task No. 26 - Prepare Preliminary Cost Estimate (update)
- 10:14, 1 June 2012 diff hist +352 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 09:59, 1 June 2012 diff hist 0 File:Plugging packet.pdf Irina Idelson uploaded a new version of "File:Plugging packet.pdf"
- 09:39, 1 June 2012 diff hist +6 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:38, 1 June 2012 diff hist −6 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:35, 1 June 2012 diff hist +15 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:28, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:28, 1 June 2012 diff hist +1 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:27, 1 June 2012 diff hist −1 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:26, 1 June 2012 diff hist +18 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:10, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:08, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:07, 1 June 2012 diff hist +29 N File:II-25i.pdf Irina Idelson moved page File:II-25i.pdf to File:II-22i.pdf current
- 09:07, 1 June 2012 diff hist 0 m File:II-24f.pdf Irina Idelson moved page File:II-25i.pdf to File:II-22i.pdf
- 09:06, 1 June 2012 diff hist +29 N File:II-25f.dot Irina Idelson moved page File:II-25f.dot to File:II-22f.dot current
- 09:06, 1 June 2012 diff hist 0 m File:II-24f.dot Irina Idelson moved page File:II-25f.dot to File:II-22f.dot
- 09:06, 1 June 2012 diff hist +29 N File:II-25e.pdf Irina Idelson moved page File:II-25e.pdf to File:II-22e.pdf current
- 09:06, 1 June 2012 diff hist 0 m File:II-24d.pdf Irina Idelson moved page File:II-25e.pdf to File:II-22e.pdf
- 09:03, 1 June 2012 diff hist −4 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:03, 1 June 2012 diff hist +29 N File:II-22b-1.pdf Irina Idelson moved page File:II-22b-1.pdf to File:II-22c.pdf current
- 09:03, 1 June 2012 diff hist 0 m File:II-24c.pdf Irina Idelson moved page File:II-22b-1.pdf to File:II-22c.pdf
- 09:01, 1 June 2012 diff hist 0 Phase II - Preliminary Design →Task No. 22 - Submit Required Permit Applications
- 09:00, 1 June 2012 diff hist +29 N File:II-25b.pdf Irina Idelson moved page File:II-25b.pdf to File:II-22b.pdf current
- 09:00, 1 June 2012 diff hist 0 m File:II-24b.pdf Irina Idelson moved page File:II-25b.pdf to File:II-22b.pdf
- 09:00, 1 June 2012 diff hist +31 N File:II-25b-1.pdf Irina Idelson moved page File:II-25b-1.pdf to File:II-22b-1.pdf current
- 09:00, 1 June 2012 diff hist 0 m File:II-24c.pdf Irina Idelson moved page File:II-25b-1.pdf to File:II-22b-1.pdf
- 08:59, 1 June 2012 diff hist +29 N File:II-25a.pdf Irina Idelson moved page File:II-25a.pdf to File:II-22a.pdf current
- 08:59, 1 June 2012 diff hist 0 m File:II-24a.pdf Irina Idelson moved page File:II-25a.pdf to File:II-22a.pdf
- 17:00, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 16:04, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 16:00, 31 May 2012 diff hist −4 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:53, 31 May 2012 diff hist +1 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:53, 31 May 2012 diff hist −2 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:52, 31 May 2012 diff hist +20 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:48, 31 May 2012 diff hist +2 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:47, 31 May 2012 diff hist +75 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:45, 31 May 2012 diff hist +4 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:44, 31 May 2012 diff hist +41 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:40, 31 May 2012 diff hist +74 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:40, 31 May 2012 diff hist +65 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:33, 31 May 2012 diff hist +5 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:31, 31 May 2012 diff hist +142 Phase II - Preliminary Design →Task No. 21 - Distribute Plans for Field Check
- 15:24, 31 May 2012 diff hist +2 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 15:22, 31 May 2012 diff hist 0 N File:II-7c.pdf
- 14:41, 31 May 2012 diff hist −139 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:01, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 14:00, 31 May 2012 diff hist +28 N File:II-19.dot Irina Idelson moved page File:II-19.dot to File:II-17.dot current
- 14:00, 31 May 2012 diff hist 0 m File:II-17.dot Irina Idelson moved page File:II-19.dot to File:II-17.dot
- 13:58, 31 May 2012 diff hist −30 Phase II - Preliminary Design →Task No. 16 - Begin Title Report Process
- 13:52, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 16 - Begin Title Report Process
- 13:51, 31 May 2012 diff hist +29 N File:II-18e.dot Irina Idelson moved page File:II-18e.dot to File:II-16e.dot current
- 13:51, 31 May 2012 diff hist 0 m File:II-16e.dot Irina Idelson moved page File:II-18e.dot to File:II-16e.dot
- 13:50, 31 May 2012 diff hist +29 N File:II-18d.dot Irina Idelson moved page File:II-18d.dot to File:II-16d.dot current
- 13:50, 31 May 2012 diff hist 0 m File:II-16d.dot Irina Idelson moved page File:II-18d.dot to File:II-16d.dot
- 13:50, 31 May 2012 diff hist +29 N File:II-18b.dot Irina Idelson moved page File:II-18b.dot to File:II-16b.dot current
- 13:50, 31 May 2012 diff hist 0 m File:II-16b.dot Irina Idelson moved page File:II-18b.dot to File:II-16b.dot
- 13:49, 31 May 2012 diff hist +29 N File:II-18a.xlt Irina Idelson moved page File:II-18a.xlt to File:II-16a.xlt current
- 13:49, 31 May 2012 diff hist 0 m File:II-16a.xlt Irina Idelson moved page File:II-18a.xlt to File:II-16a.xlt
- 13:49, 31 May 2012 diff hist 0 File:II-16a.xlt Irina Idelson uploaded a new version of "File:II-18a.xlt"
- 13:38, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 13:37, 31 May 2012 diff hist +29 N File:II-17d.dot Irina Idelson moved page File:II-17d.dot to File:II-15d.dot current
- 13:37, 31 May 2012 diff hist +29 N File:II-17c.dot Irina Idelson moved page File:II-17c.dot to File:II-15c.dot current
- 13:37, 31 May 2012 diff hist 0 m File:II-15c.dot Irina Idelson moved page File:II-17c.dot to File:II-15c.dot
- 13:37, 31 May 2012 diff hist +29 N File:II-17b.dot Irina Idelson moved page File:II-17b.dot to File:II-15b.dot current
- 13:37, 31 May 2012 diff hist 0 m File:II-15b.dot Irina Idelson moved page File:II-17b.dot to File:II-15b.dot
- 13:36, 31 May 2012 diff hist +29 N File:II-17a.dot Irina Idelson moved page File:II-17a.dot to File:II-15a.dot current
- 13:36, 31 May 2012 diff hist 0 m File:II-15a.dot Irina Idelson moved page File:II-17a.dot to File:II-15a.dot
- 13:35, 31 May 2012 diff hist 0 m File:II-15.dot Irina Idelson moved page File:II-17.dot to File:II-15.dot
- 13:30, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 13:29, 31 May 2012 diff hist +28 N File:II-16.xlt Irina Idelson moved page File:II-16.xlt to File:II-14.xlt current
- 13:29, 31 May 2012 diff hist 0 m File:II-14.xlt Irina Idelson moved page File:II-16.xlt to File:II-14.xlt
- 13:29, 31 May 2012 diff hist 0 File:II-14.xlt Irina Idelson uploaded a new version of "File:II-16.xlt"
- 11:26, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 11:23, 31 May 2012 diff hist +94 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 11:20, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 11:19, 31 May 2012 diff hist +28 N File:II-7c.dot Irina Idelson moved page File:II-7c.dot to File:II-7d.dot current
- 11:19, 31 May 2012 diff hist 0 m File:II-7d.dot Irina Idelson moved page File:II-7c.dot to File:II-7d.dot current
- 11:18, 31 May 2012 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 11:17, 31 May 2012 diff hist 0 m File:II-7e.dot Irina Idelson moved page File:II-7d.dot to File:II-7e.dot current