User contributions for Irina Idelson
Jump to navigation
Jump to search
- 11:55, 22 September 2021 diff hist +47 N File:1302 Form Transmittal email.pdf Project Programming Request email current
- 11:49, 22 September 2021 diff hist +11 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:45, 22 September 2021 diff hist +80 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:28, 22 September 2021 diff hist +80 Phase II - Preliminary Design →Task No. 32 - NHS Approval Procedure
- 11:23, 22 September 2021 diff hist 0 Phase II - Preliminary Design →Task No. 32 - NHS Approval Procedure
- 15:22, 21 September 2021 diff hist −17 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 15:20, 21 September 2021 diff hist +94 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:58, 21 September 2021 diff hist +4 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:56, 21 September 2021 diff hist +139 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 10:27, 21 September 2021 diff hist +188 Phase III - Final Design →Task No. 17 - Complete Utility Relocations
- 10:23, 21 September 2021 diff hist +1 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:23, 21 September 2021 diff hist +43 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:22, 21 September 2021 diff hist +150 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 10:05, 21 September 2021 diff hist −1 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 10:04, 21 September 2021 diff hist +12 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 10:02, 21 September 2021 diff hist +109 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 10:00, 21 September 2021 diff hist +9 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 09:59, 21 September 2021 diff hist +75 Phase II - Preliminary Design →Task No. 7 - Initiate Utility Coordination. Schedule Utility Meeting (optional)
- 09:48, 21 September 2021 diff hist +117 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:22, 16 September 2021 diff hist +37 Phase I - Vision
- 11:55, 16 September 2021 diff hist +68 N File:SharingtheFuture.pdf Public Involvement in the Kansas Transportation System current
- 11:54, 16 September 2021 diff hist −2 Phase I - Vision
- 11:50, 16 September 2021 diff hist +239 Phase I - Vision
- 11:41, 16 September 2021 diff hist −167 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 11:14, 16 September 2021 diff hist +167 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 10:27, 20 August 2021 diff hist 0 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 10:18, 20 August 2021 diff hist 0 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 10:01, 20 August 2021 diff hist −2 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 09:57, 20 August 2021 diff hist −16 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:56, 20 August 2021 diff hist −8 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:55, 20 August 2021 diff hist +30 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:52, 20 August 2021 diff hist 0 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 09:48, 20 August 2021 diff hist 0 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 09:46, 20 August 2021 diff hist 0 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 09:18, 20 August 2021 diff hist +2 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 09:15, 20 August 2021 diff hist +30 Phase III - Final Design →Task No. 12 - Prepare Engineer’s Cost Estimate
- 09:07, 20 August 2021 diff hist −1 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 08:57, 20 August 2021 diff hist 0 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 08:56, 20 August 2021 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 08:54, 20 August 2021 diff hist 0 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 08:51, 20 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 29 - Continue Environmental Process
- 08:49, 20 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 08:47, 20 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 08:46, 20 August 2021 diff hist +58 N File:Design Exception Request Summary Form 2020.pdf Design Exception Request_2020_LPA Figure 5.1 current
- 08:33, 20 August 2021 diff hist −2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:17, 20 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:17, 20 August 2021 diff hist +57 N File:2020 LPA Manual.pdf LPA Project Development Manual_2020 Edition current
- 08:15, 20 August 2021 diff hist +8 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:09, 20 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:34, 19 August 2021 diff hist −2 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 16:32, 19 August 2021 diff hist 0 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 16:26, 19 August 2021 diff hist 0 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 16:25, 19 August 2021 diff hist 0 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 16:24, 19 August 2021 diff hist 0 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 16:24, 19 August 2021 diff hist 0 Phase I - Vision →Task 12 - Obtain Priority Evaluation from KDOT
- 16:12, 19 August 2021 diff hist +80 N File:11.0 CE Consultant Selection and Agreement 2020.pdf Chapter 11.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:12, 19 August 2021 diff hist +80 N File:10.0 LPA-Administered Procedures 2020.pdf Chapter 10.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:12, 19 August 2021 diff hist +79 N File:8.0 Status of Utilities 2020.pdf Chapter 8.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:11, 19 August 2021 diff hist +79 N File:7.0 Right of Way 2020.pdf Chapter 7.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:11, 19 August 2021 diff hist +79 N File:6.0 Bridge Design 2020.pdf Chapter 6.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:10, 19 August 2021 diff hist +79 N File:5.0 Plan Development 2020.pdf Chapter 5.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:10, 19 August 2021 diff hist +79 N File:4.0 Environmental 2020.pdf Chapter 4.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:09, 19 August 2021 diff hist +79 N File:3.0 PE Consultant Selection and Agreement 2020.pdf Chapter 3.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:08, 19 August 2021 diff hist +79 N File:2.0 Programming 2020.pdf Chapter 2.0 of KDOT's LPA Project Development Manual_2020 Edition current
- 16:17, 15 July 2021 diff hist +76 Phase III - Final Design →Task No. 15 - PS&E Review
- 16:11, 15 July 2021 diff hist −15 Phase III - Final Design →Task No. 14 - Submit PS&E Package
- 16:08, 15 July 2021 diff hist +42 Phase III - Final Design →Task No. 15 - PS&E Review
- 15:56, 15 July 2021 diff hist +1 Phase III - Final Design →Task No. 15 - PS&E Review
- 15:55, 15 July 2021 diff hist −28 Phase III - Final Design →Task No. 15 - PS&E Review
- 15:10, 7 July 2021 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of File:IV-5f.docx
- 15:09, 7 July 2021 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of File:IV-5e.docx
- 15:07, 7 July 2021 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 15:01, 7 July 2021 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 16:17, 25 June 2021 diff hist +2 Condemnation Process →Condemnation Process current
- 14:40, 9 June 2021 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of File:II-3o.xlsx
- 08:41, 26 April 2021 diff hist 0 File:IV-5l Plan Rooms.docx Irina Idelson uploaded a new version of File:IV-5l Plan Rooms.docx
- 08:40, 26 April 2021 diff hist 0 File:IV-5j.docx Irina Idelson uploaded a new version of File:IV-5j.docx
- 08:39, 26 April 2021 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of File:IV-5i.docx
- 08:38, 26 April 2021 diff hist 0 File:IV-5h.docx Irina Idelson uploaded a new version of File:IV-5h.docx
- 08:37, 26 April 2021 diff hist 0 File:IV-5g.docx Irina Idelson uploaded a new version of File:IV-5g.docx
- 08:35, 26 April 2021 diff hist 0 File:IV-5f.docx Irina Idelson uploaded a new version of File:IV-5f.docx
- 08:34, 26 April 2021 diff hist 0 File:IV-5e.docx Irina Idelson uploaded a new version of File:IV-5e.docx
- 08:31, 26 April 2021 diff hist 0 File:IV-5d.docx Irina Idelson uploaded a new version of File:IV-5d.docx
- 08:30, 26 April 2021 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of File:IV-5c.docx
- 08:28, 26 April 2021 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 08:25, 26 April 2021 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 08:20, 26 April 2021 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of File:II-3o.xlsx
- 08:20, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:19, 31 March 2021 diff hist +30 N File:Thoroughfare Interim Sections Jan-2021.pdf Interim Sections current
- 08:19, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:18, 31 March 2021 diff hist +38 N File:Thoroughfare Ultimate 2-Lane Sections Jan-2021.pdf Ultimate 2-Lane Sections current
- 08:17, 31 March 2021 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 08:16, 31 March 2021 diff hist +45 N File:Thoroughfare Ultimate 4- and 3-Lane Sections Jan-2021.pdf Ultimate 4- and 3-lane Sections current
- 09:00, 11 March 2021 diff hist −10 Phase V - Construction →Task No. 19 - Prepare Revisions/As-Built Plans
- 09:00, 26 February 2021 diff hist 0 File:1306 last page OP note.pdf Irina Idelson uploaded a new version of File:1306 last page OP note.pdf current
- 14:57, 25 February 2021 diff hist +1 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:07, 25 February 2021 diff hist +117 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 12:57, 25 February 2021 diff hist +48 N File:1306 last page OP note.pdf Form 1306 - last page with OP note
- 12:44, 25 February 2021 diff hist +49 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 03:41, 15 February 2021 diff hist +15 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 11:39, 29 December 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 10:00, 24 December 2020 diff hist −393 Condemnation Process →Condemnation Process
- 09:56, 24 December 2020 diff hist −78 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:51, 24 December 2020 diff hist +36 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:50, 24 December 2020 diff hist +58 N File:V-13i random numbers for concrete testing.xls Random number generator for Concrete testing current
- 09:47, 24 December 2020 diff hist +35 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:47, 24 December 2020 diff hist +57 N File:V-13h random numbers for asphalt testing.xls Random number generator for Asphalt testing current
- 09:44, 24 December 2020 diff hist +35 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:43, 24 December 2020 diff hist +57 N File:V-13g random numbers for fly ash testing.xls Random number generator for Fly Ash testing current
- 09:41, 24 December 2020 diff hist +37 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:40, 24 December 2020 diff hist +59 N File:V-13f random numbers for earthwork testing.xls Random number generator for Earthwork testing current
- 09:32, 24 December 2020 diff hist +28 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:31, 24 December 2020 diff hist +116 N File:V-13e Concrete Unit Weight Calcs.xlsx Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results current
- 09:19, 24 December 2020 diff hist +14 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:17, 24 December 2020 diff hist +68 N File:V-13d Material Testing Recap Log.docx City's Material Testing Recap Log Sheet (word format). current
- 09:14, 24 December 2020 diff hist −6 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 09:13, 24 December 2020 diff hist +62 N File:V-13b Material Testing Log.xlsx City's Material Testing Log Sheet (excel format) current
- 09:00, 24 December 2020 diff hist +22 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:59, 24 December 2020 diff hist +61 N File:V-13c Material Testing Log.docx City's Material Testing Log Sheet (word format) current
- 08:56, 24 December 2020 diff hist +28 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:55, 24 December 2020 diff hist +62 N File:V-13b material testing log excel.xlsx City's Material Testing Log Sheet (excel format) current
- 08:52, 24 December 2020 diff hist 0 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 08:27, 24 December 2020 diff hist +10 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:37, 23 December 2020 diff hist +73 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:32, 23 December 2020 diff hist −16 Phase V - Construction →Task No. 13 - On-Going Material Testing
- 13:31, 23 December 2020 diff hist +39 N File:Project Data Sheet.pdf City's Project Data Sheet current
- 13:26, 23 December 2020 diff hist −66 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 13:24, 23 December 2020 diff hist +35 N File:Project Cost Estimate 11-20-2015.pdf Project Cost Estimate current
- 12:51, 23 December 2020 diff hist −521 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 15:10, 17 December 2020 diff hist −1 Phase III - Final Design →Task No. 6 - Begin Condemnation Process
- 15:09, 17 December 2020 diff hist −139 Phase III - Final Design →Task No. 6 - Begin Condemnation Process
- 14:53, 17 December 2020 diff hist +1,899 Condemnation Process →Steps in the Eminent Domain Process Involving Public Works
- 12:17, 17 December 2020 diff hist +24 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 12:14, 17 December 2020 diff hist +6 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 12:13, 17 December 2020 diff hist −33 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 09:11, 17 December 2020 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 08:39, 17 December 2020 diff hist +1 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 12:45, 16 December 2020 diff hist 0 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 12:44, 16 December 2020 diff hist −138 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 08:16, 14 December 2020 diff hist −11 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:20, 11 December 2020 diff hist +41 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 10:07, 1 December 2020 diff hist 0 File:V-4c Contract Documents and Plan Distribution.docx Irina Idelson uploaded a new version of File:V-4c Contract Documents and Plan Distribution.docx current
- 16:59, 16 November 2020 diff hist −59 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:53, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:52, 16 November 2020 diff hist +69 N File:V-4d Contract Documents and Plan Distribution.docx Irina Idelson moved page File:V-4d Contract Documents and Plan Distribution.docx to File:V-4c Contract Documents and Plan Distribution.docx current Tag: New redirect
- 16:52, 16 November 2020 diff hist 0 m File:V-4c Contract Documents and Plan Distribution.docx Irina Idelson moved page File:V-4d Contract Documents and Plan Distribution.docx to File:V-4c Contract Documents and Plan Distribution.docx
- 16:51, 16 November 2020 diff hist −131 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:50, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:50, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:49, 16 November 2020 diff hist +50 N File:V-4c CARS Notice to Proceed.pdf Irina Idelson moved page File:V-4c CARS Notice to Proceed.pdf to File:V-4b CARS Notice to Proceed.pdf current Tag: New redirect
- 16:49, 16 November 2020 diff hist 0 m File:V-4b CARS Notice to Proceed.pdf Irina Idelson moved page File:V-4c CARS Notice to Proceed.pdf to File:V-4b CARS Notice to Proceed.pdf current
- 16:48, 16 November 2020 diff hist −72 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:44, 16 November 2020 diff hist 0 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 16:44, 16 November 2020 diff hist +68 N File:V-4b Sample Transmittal Letter to Contractor.docx Irina Idelson moved page File:V-4b Sample Transmittal Letter to Contractor.docx to File:V-4a Sample Transmittal Letter to Contractor.docx current Tag: New redirect
- 16:44, 16 November 2020 diff hist 0 m File:V-4a Sample Transmittal Letter to Contractor.docx Irina Idelson moved page File:V-4b Sample Transmittal Letter to Contractor.docx to File:V-4a Sample Transmittal Letter to Contractor.docx current
- 16:16, 16 November 2020 diff hist +80 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractors/DBE Firms
- 17:32, 13 November 2020 diff hist 0 File:Sample Acquisition Notes.pdf Irina Idelson uploaded a new version of File:Sample Acquisition Notes.pdf current
- 16:14, 13 November 2020 diff hist −23 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:59, 30 October 2020 diff hist +30 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:59, 30 October 2020 diff hist +49 N File:III-5a Property Acqusition Checklist.docx Real Property Acquisition Checklist current
- 14:55, 30 October 2020 diff hist +15 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:54, 30 October 2020 diff hist +20 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:32, 30 October 2020 diff hist +49 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:31, 30 October 2020 diff hist +111 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:27, 30 October 2020 diff hist +64 N File:Appraiser inspection letter.pdf Inspection Letter from Appraiser to Property Owner current
- 14:25, 30 October 2020 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:23, 30 October 2020 diff hist 0 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:23, 30 October 2020 diff hist +29 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:22, 30 October 2020 diff hist +55 N File:III-5d Mortgage Release Individual.docx Real Estate Mortgage Release - Individual current
- 14:19, 30 October 2020 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:19, 30 October 2020 diff hist +29 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 14:18, 30 October 2020 diff hist +56 N File:III-5e Mortgage Release Corporation.docx Real Estate Mortgage Release - Corporation current
- 14:14, 30 October 2020 diff hist +172 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 10:55, 30 October 2020 diff hist +192 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 10:39, 30 October 2020 diff hist 0 File:RFQ Appraisal Acquisition.pdf Irina Idelson uploaded a new version of File:RFQ Appraisal Acquisition.pdf current
- 10:25, 30 October 2020 diff hist −4 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:22, 30 October 2020 diff hist +60 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:19, 30 October 2020 diff hist +83 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 14:33, 22 October 2020 diff hist +31 N File:Phase V Checklist.docx Phase v Checklist current
- 14:23, 22 October 2020 diff hist −14 Checklist Phase V current
- 13:53, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 13:42, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 13:40, 22 October 2020 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of File:Phase III Checklist.docx current
- 13:39, 22 October 2020 diff hist 0 File:Phase II Checklist.docx Irina Idelson uploaded a new version of File:Phase II Checklist.docx
- 13:37, 22 October 2020 diff hist 0 File:Phase I Checklist.docx Irina Idelson uploaded a new version of File:Phase I Checklist.docx current
- 13:35, 22 October 2020 diff hist 0 File:Phase VI Checklist.docx Irina Idelson uploaded a new version of File:Phase VI Checklist.docx
- 13:20, 22 October 2020 diff hist −8 Phase V - Construction
- 11:45, 22 October 2020 diff hist 0 File:Phase IV Checklist.docx Irina Idelson uploaded a new version of File:Phase IV Checklist.docx
- 11:24, 22 October 2020 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of File:Phase III Checklist.docx
- 11:17, 22 October 2020 diff hist 0 File:Phase II Checklist.docx Irina Idelson uploaded a new version of File:Phase II Checklist.docx
- 15:28, 28 September 2020 diff hist +36 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:56, 28 September 2020 diff hist +14 Phase IV - Pre-Construction →Task No. 15 - Obtain Project Temporary Financing
- 14:47, 28 September 2020 diff hist +14 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:46, 28 September 2020 diff hist +35 N File:Project Cost Estimate.pdf Project Cost Estimate current
- 14:45, 28 September 2020 diff hist +11 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 14:44, 28 September 2020 diff hist +40 N File:Project Cost Memo.pdf Project Cost Estimate memo current
- 14:40, 28 September 2020 diff hist +49 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 13:34, 28 September 2020 diff hist +15 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 13:32, 28 September 2020 diff hist +31 N File:Sample Acquisition Notes.pdf Acquisition Notes
- 13:15, 28 September 2020 diff hist +43 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:57, 28 September 2020 diff hist −1 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 08:43, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson reverted File:III-11-1 Agreement.docx to an old version current
- 08:41, 31 August 2020 diff hist +40 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:39, 31 August 2020 diff hist +50 N File:III-11a-6 Notice to Bidders (hard copy bids).docx Notice to Bidders for Hard Copy Bids current
- 08:26, 31 August 2020 diff hist 0 File:III-11a-10b Table of Contents CDBG.docx Irina Idelson uploaded a new version of File:III-11a-10b Table of Contents CDBG.docx current
- 08:25, 31 August 2020 diff hist +9 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:24, 31 August 2020 diff hist +49 N File:III-11a-10a Table of Contents KDOT Projects.docx Table of Contents for KDOT Projects
- 08:22, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:21, 31 August 2020 diff hist +31 N File:III-11a-10 Table of Contents.docx Table of Contents current
- 08:20, 31 August 2020 diff hist 0 File:III-11a-9 Statutory Bond.docx Irina Idelson uploaded a new version of File:III-11a-9 Statutory Bond.docx current
- 08:17, 31 August 2020 diff hist 0 File:III-11a-8a Maintenance Bond.docx Irina Idelson uploaded a new version of File:III-11a-8a Maintenance Bond.docx current
- 08:15, 31 August 2020 diff hist +18 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:14, 31 August 2020 diff hist +30 N File:III-11a-8 Performance Bond.docx Performance Bond current
- 08:12, 31 August 2020 diff hist +32 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:12, 31 August 2020 diff hist +45 N File:III-11a-7 Labor and Material Payment Bond.docx Labor and Material Payment Bond current
- 08:08, 31 August 2020 diff hist 0 File:III-11a-3 General Conditions.docx Irina Idelson uploaded a new version of File:III-11a-3 General Conditions.docx
- 08:06, 31 August 2020 diff hist +25 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 08:06, 31 August 2020 diff hist +17 N File:III-11a-2 Bid - use for hard copy bids.docx Bid current
- 07:44, 31 August 2020 diff hist 0 File:III-11a-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11a-1 Agreement.docx current
- 07:41, 31 August 2020 diff hist 0 File:III-11-1 Agreement.docx Irina Idelson uploaded a new version of File:III-11-1 Agreement.docx
- 13:52, 27 August 2020 diff hist +29 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 16:43, 26 August 2020 diff hist −2 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:43, 26 August 2020 diff hist −54 Phase IV - Pre-Construction
- 16:42, 26 August 2020 diff hist +56 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:34, 26 August 2020 diff hist −55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:33, 26 August 2020 diff hist +55 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 14:32, 26 August 2020 diff hist +3 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 14:24, 26 August 2020 diff hist −4 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 14:03, 26 August 2020 diff hist −35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 13:45, 26 August 2020 diff hist +35 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 09:48, 26 August 2020 diff hist +1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 09:18, 26 August 2020 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:23, 20 August 2020 diff hist −88 Phase V - Construction →Task No. 2 - Submit Agency Cash Flow Projection
- 11:47, 18 August 2020 diff hist +23 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 11:46, 18 August 2020 diff hist +43 N File:VI-1d project close out SMAC.docx Project Close Out Form - SMAC current
- 07:04, 31 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 07:03, 31 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 14:45, 29 July 2020 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of File:IV-5b.docx
- 14:44, 29 July 2020 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of File:IV-5a.docx
- 13:42, 13 July 2020 diff hist −1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:41, 13 July 2020 diff hist +1 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 13:34, 13 July 2020 diff hist +2 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 15:21, 9 July 2020 diff hist −102 Condemnation Process
- 14:09, 9 July 2020 diff hist −12 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:05, 9 July 2020 diff hist −113 Planning Bid and Contract Award Schedules current
- 09:09, 9 July 2020 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:33, 8 July 2020 diff hist −21 Preparation of Construction Bid Documents →General Comments current
- 13:31, 8 July 2020 diff hist +83 Preparation of Construction Bid Documents →General Comments
- 10:28, 8 July 2020 diff hist 0 Preparation of Construction Bid Documents
- 10:26, 8 July 2020 diff hist +73 Preparation of Construction Bid Documents