User contributions for Brian Geiger
Results for Brian Geiger talk block log uploads logs
A user with 1,040 edits. Account created on 24 November 2015.
29 July 2019
- 13:0713:07, 29 July 2019 diff hist +27 N File:TRF PQL TC MEM PlasticSafetySystems ConicalDelineator NavigatorChannelizer.pdf File uploaded with MsUpload current
- 13:0713:07, 29 July 2019 diff hist +27 N File:TRF PQL TC CAT PlasticSafetySystems ConicalDelineator NavigatorChannelizer.pdf File uploaded with MsUpload current
- 12:0112:01, 29 July 2019 diff hist +65 Approved Materials - Traffic Control →Type III Barricades: Added Plastic Safety Systems Catalog Cut
- 12:0112:01, 29 July 2019 diff hist +27 N File:TRF PQL TC CAT PlasticSafetySystems Type3Barricade.pdf File uploaded with MsUpload current
- 11:5511:55, 29 July 2019 diff hist +14 Approved Materials - Traffic Control Updated Plastic Safety System's Website
- 11:5211:52, 29 July 2019 diff hist +65 Approved Materials - Traffic Control →Type III Barricades: Added Plastic Safety System's Memo
- 11:5211:52, 29 July 2019 diff hist +27 N File:TRF PQL TC MEM PlasticSafetySystems Type3Barricade.pdf File uploaded with MsUpload current
- 11:3911:39, 29 July 2019 diff hist +104 Approved Materials - Traffic Control →Type II Barricades: Added PDFs for the TrafFix CAT and MEM
- 11:3911:39, 29 July 2019 diff hist +27 N File:TRF PQL TC MEM Traffix Type2Barricade.pdf File uploaded with MsUpload current
- 11:3911:39, 29 July 2019 diff hist +27 N File:TRF PQL TC CAT Traffix Type2Barricade.pdf File uploaded with MsUpload current
- 11:3811:38, 29 July 2019 diff hist +104 Approved Materials - Traffic Control →Type I Barricades: Added PDFs for the CAT and MEM to TrafFix
- 11:3811:38, 29 July 2019 diff hist +27 N File:TRF PQL TC MEM Traffix Type1Barricade.pdf File uploaded with MsUpload current
- 11:3811:38, 29 July 2019 diff hist +27 N File:TRF PQL TC CAT Traffix Type1Barricade.pdf File uploaded with MsUpload current
- 10:2410:24, 29 July 2019 diff hist +166 Approved Materials - Traffic Control →Arrow Panels: Added Ver-Mac 15-Light Arrow Board
- 10:2310:23, 29 July 2019 diff hist +27 N File:TRF PQL TC MEM Ver-Mac ArrowPanel.pdf File uploaded with MsUpload
- 10:2310:23, 29 July 2019 diff hist +27 N File:TRF PQL TC CAT Ver-Mac ArrowBoard.pdf File uploaded with MsUpload
8 July 2019
- 10:3210:32, 8 July 2019 diff hist −194 Approved Materials - Traffic Control →ADA Pedestrian Barricades: Gun-Ko is defunct and their Ped Barricade no longer exists.
17 June 2019
- 09:0609:06, 17 June 2019 diff hist +4 Streetlight Design Manual → Intersection Lighting for Continuously Lighted Streets:
- 09:0509:05, 17 June 2019 diff hist +102 Streetlight Design Manual → Intersection Lighting for Continuously Lighted Streets:: Added 5' maximum point spacing.
25 April 2019
- 16:5016:50, 25 April 2019 diff hist +53 Approved Materials - Streetlighting →HPS Residential Post Top: Contact City Staff for IES files for design work
29 March 2019
- 16:2816:28, 29 March 2019 diff hist −1 Approved Materials - Traffic Signals →Pedestrian Pushbuttons: Replaced PBF2 with PBF2C Frame
- 16:2716:27, 29 March 2019 diff hist +27 N File:TRF PQL TS CAT Polara Bulldog PBF2C REV-A.pdf File uploaded with MsUpload current
- 16:1116:11, 29 March 2019 diff hist +25 User:Brian Geiger No edit summary current
20 March 2019
- 09:2409:24, 20 March 2019 diff hist +60 Approved Materials - Traffic Control →Warning Lights: Updated Checkers Website
11 February 2019
- 16:2716:27, 11 February 2019 diff hist +45 Streetlight Design Manual →HPS Lamps:: Added 310W lamp
- 16:2116:21, 11 February 2019 diff hist +427 Streetlight Design Manual →Approved Streetlighting Equipment:: Added HPS Lamps and their Lumens
- 09:1909:19, 11 February 2019 diff hist +36 Streetlight Design Manual → HPS Fixture Operating Current:: Added 310 W HPS Amp assumption (Calculated to be 1.7675)
29 January 2019
- 16:2716:27, 29 January 2019 diff hist −233 Approved Materials - Streetlighting →Schedule 80 PVC Conduit: Removed photos that show Schedule 40 PVC for Rocky Mountain Colby Pipe
- 16:2616:26, 29 January 2019 diff hist −232 Approved Materials - Traffic Signals →Schedule 80 PVC Conduit: Update Memo and Catalog cuts from SL to TS documents and links for all five conduit products.
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS MEM RockyMountainColbyPipe Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS CAT RockyMountainColbyPipe Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS MEM PrimeConduit Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS CAT PrimeConduit Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS CAT IpexScepter Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS MEM IPEXScepter Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS MEM HeritagePlastics Schedul80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS CAT HeritagePlastics Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS CAT Cantex Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:2416:24, 29 January 2019 diff hist +27 N File:TRF PQL TS MEM Cantex Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 15:5415:54, 29 January 2019 diff hist +3,337 Approved Materials - Traffic Signals Added Schedule 80 PVC Conduit Section (Still need to update links within Schedule 80 to point to a signal cut sheet rather than streetlight cut sheet)
28 January 2019
- 16:1916:19, 28 January 2019 diff hist +31 Approved Materials - Streetlighting →Schedule 80 PVC Conduit: RockyMountainColby Updated
- 16:1916:19, 28 January 2019 diff hist +27 N File:TRF PQL SL MEM RockyMountainColbyPipe Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 16:1916:19, 28 January 2019 diff hist +27 N File:TRF PQL SL CAT RockyMountainColbyPipe Schedule80PVCConduit.pdf File uploaded with MsUpload current
23 January 2019
- 17:5717:57, 23 January 2019 diff hist −215 Approved Materials - Streetlighting →Schedule 80 PVC Conduit: Prime Conduit Update
- 17:5517:55, 23 January 2019 diff hist +27 N File:TRF PQL SL CAT PrimeConduit Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 17:5517:55, 23 January 2019 diff hist +27 N File:TRF PQL SL MEM PrimeConduit Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 17:3817:38, 23 January 2019 diff hist +19 Approved Materials - Streetlighting →Schedule 80 PVC Conduit: Ipex Scepter Update
- 17:3617:36, 23 January 2019 diff hist +27 N File:TRF PQL SL CAT IpexScepter Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 17:3617:36, 23 January 2019 diff hist +27 N File:TRF PQL SL MEM IPEXScepter Schedule80PVCConduit.pdf File uploaded with MsUpload current
- 17:1217:12, 23 January 2019 diff hist −3 Approved Materials - Streetlighting →Schedule 80 PVC Conduit: Heritage Plastics updates