Revision History

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Revision as of 10:05, 5 April 2010 by Mike Ross (talk | contribs) (Created page with '{| class="wikitable" border="2" !width="100" align="center"|Date !width="600"|Revision !width="100"|By |- |align="center"|4/5/2010 |Wiki was moved to the MediaWiki wiki |align="c…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Date Revision By
4/5/2010 Wiki was moved to the MediaWiki wiki MSR
8/26/2008 Phase III - Final Design

Task No. 7 - Submit Final Plans for Review Submittal
Added link to the Maintenance Plan Review Process

JEA
8/26/2008 Phase II - Preliminary Design

Task No. 22 - Distribute Plans for Field Check
Added link to the Maintenance Plan Review Process

JEA
8/6/2008 Phase V - Construction

Task No. 12 - On-Going Inspections
Added Electrical Service Address Procedures and links.

JEA
8/6/2008 Phase II - Preliminary Design

Task No. 28 - Begin Field Check Plan Review
Added Electrical Service Address Procedures and links.

JEA
7/15/2008 Project Procedures Manual was moved to the MS Sharepoint Wiki. JEA