From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation
Jump to search
EARTHWORK
| 201
|
CLEARING AND GRUBBING
|
| 202
|
REMOVAL OF EXISTING STRUCTURES
|
|
|
15-02001 - REMOVAL OF EXISTING STRUCTURES
|
| 203K
|
RESETTING EXISTING CULVERTS
|
| 203OP
|
TREE REMOVAL
|
| 204
|
EXCAVATION AND BACKFILL FOR STRUCTURES
|
| 205
|
EXCAVATION AND EMBANKMENT FOR HIGHWAYS
|
|
|
15-ER-1-22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOON FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
|
| 206
|
SELECT SOIL
|
| 207K
|
OVERHAUL
|
| 207OP
|
EMBANKMENT AND COMPACTION OF EARTHWORK
|
| 208
|
LINEAR GRADING & SUBGRADE STABILIZATION
|
| 209
|
SPECIAL FILL
|
| 210
|
SALVAGING, STOCKPILING AND PLACING TOPSOIL
|
| 211
|
GEOFOAM LIGHTWEIGHT EMBANKMENT FILL
|
| 212
|
GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL
|
| 213
|
PREFABRICATED VERTICAL DRAIN
|
| 214
|
MECHANICALLY STABILIZED EARTH FILL
|
|
|
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
|
| 215
|
GRANULAR DRAINAGE BLANKET
|