200

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search

EARTHWORK

201 CLEARING AND GRUBBING
202 REMOVAL OF EXISTING STRUCTURES
15-02001 - REMOVAL OF EXISTING STRUCTURES
203K RESETTING EXISTING CULVERTS
203OP TREE REMOVAL
204 EXCAVATION AND BACKFILL FOR STRUCTURES
205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS
15-ER-1-22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOON FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
206 SELECT SOIL
207K OVERHAUL
207OP EMBANKMENT AND COMPACTION OF EARTHWORK
208 LINEAR GRADING & SUBGRADE STABILIZATION
209K SPECIAL FILL
209OP ROCK EXCAVATION & BLASTING
210 SALVAGING, STOCKPILING AND PLACING TOPSOIL
211K GEOFOAM LIGHTWEIGHT EMBANKMENT FILL
211OP GRADING OF SWALES
212 GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL
213 PREFABRICATED VERTICAL DRAIN
214 MECHANICALLY STABILIZED EARTH FILL
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
215 GRANULAR DRAINAGE BLANKET