Difference between revisions of "Contractor Submittal Forms"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
m (Changed print to download.)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
Print out the following forms and select items for approval.
Download the following forms and fill out items for approval.


=== Roadway Construction ===
=== Roadway Construction ===
Line 9: Line 9:
*[[media:Project Submittal Form storm drainage.pdf|'''Storm Drainage''']]
*[[media:Project Submittal Form storm drainage.pdf|'''Storm Drainage''']]
*[[media:Project Submittal Form geotextile.pdf|'''Geotextile''']]
*[[media:Project Submittal Form geotextile.pdf|'''Geotextile''']]
*[[media:Project Submittal Form sediment control.pdf|'''Sediment Control''']]
*[[media:Project Submittal Form sediment control.pdf|'''Erosion and Sediment Control''']]


=== Traffic Materials: ===
=== Traffic Materials: ===
Line 35: Line 35:


[[Approved Materials|'''Return to Approved Materials''']]
[[Approved Materials|'''Return to Approved Materials''']]
[[Category:Approved Materials]]

Latest revision as of 10:09, 25 January 2023