|[[208]] | |[[208]] | ||
|LINEAR GRADING | |LINEAR GRADING & SUBGRADE STABILIZATION | ||
|- | |- | ||
|[[209]] | |[[209|209K]] | ||
|SPECIAL FILL | |SPECIAL FILL | ||
|- | |||
|[[209OP]] | |||
|ROCK EXCAVATION & BLASTING | |||
|- | |- | ||
|[[210]] | |[[210]] | ||
|SALVAGING, STOCKPILING AND PLACING TOPSOIL | |SALVAGING, STOCKPILING AND PLACING TOPSOIL | ||
|- | |- | ||
|[[211]] | |[[211|211K]] | ||
|GEOFOAM LIGHTWEIGHT EMBANKMENT FILL | |GEOFOAM LIGHTWEIGHT EMBANKMENT FILL | ||
|- | |||
|[[211OP]] | |||
|GRADING OF SWALES | |||
|- | |- | ||
|[[212]] | |[[212]] |
Latest revision as of 15:55, 16 January 2024
EARTHWORK
201 | CLEARING AND GRUBBING |
202 | REMOVAL OF EXISTING STRUCTURES |
15-02001 - REMOVAL OF EXISTING STRUCTURES | |
203K | RESETTING EXISTING CULVERTS |
203OP | TREE REMOVAL |
204 | EXCAVATION AND BACKFILL FOR STRUCTURES |
205 | EXCAVATION AND EMBANKMENT FOR HIGHWAYS |
15-ER-1-22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOON FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |
206 | SELECT SOIL |
207K | OVERHAUL |
207OP | EMBANKMENT AND COMPACTION OF EARTHWORK |
208 | LINEAR GRADING & SUBGRADE STABILIZATION |
209K | SPECIAL FILL |
209OP | ROCK EXCAVATION & BLASTING |
210 | SALVAGING, STOCKPILING AND PLACING TOPSOIL |
211K | GEOFOAM LIGHTWEIGHT EMBANKMENT FILL |
211OP | GRADING OF SWALES |
212 | GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL |
213 | PREFABRICATED VERTICAL DRAIN |
214 | MECHANICALLY STABILIZED EARTH FILL |
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |
215 | GRANULAR DRAINAGE BLANKET |