Difference between revisions of "200"
Jump to navigation
Jump to search
m |
m (→EARTHWORK) |
||
Line 10: | Line 10: | ||
|[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/PDF/15-02001.pdf 15-02001] - REMOVAL OF EXISTING STRUCTURES | |[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/PDF/15-02001.pdf 15-02001] - REMOVAL OF EXISTING STRUCTURES | ||
|- | |- | ||
|[[203]] | |[[203|203K]] | ||
|RESETTING EXISTING CULVERTS | |RESETTING EXISTING CULVERTS | ||
|- | |||
|[[203OP]] | |||
|TREE REMOVAL | |||
|- | |- | ||
|[[204]] | |[[204]] |
Revision as of 15:42, 16 January 2024
EARTHWORK
201 | CLEARING AND GRUBBING |
202 | REMOVAL OF EXISTING STRUCTURES |
15-02001 - REMOVAL OF EXISTING STRUCTURES | |
203K | RESETTING EXISTING CULVERTS |
203OP | TREE REMOVAL |
204 | EXCAVATION AND BACKFILL FOR STRUCTURES |
205 | EXCAVATION AND EMBANKMENT FOR HIGHWAYS |
15-ER-1-22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOON FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |
206 | SELECT SOIL |
207 | OVERHAUL |
208 | LINEAR GRADING |
209 | SPECIAL FILL |
210 | SALVAGING, STOCKPILING AND PLACING TOPSOIL |
211 | GEOFOAM LIGHTWEIGHT EMBANKMENT FILL |
212 | GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL |
213 | PREFABRICATED VERTICAL DRAIN |
214 | MECHANICALLY STABILIZED EARTH FILL |
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |
215 | GRANULAR DRAINAGE BLANKET |