Difference between revisions of "200"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(Created page with "'''<u>EARTHWORK</u>''' {| class="wikitable" |201 |CLEARING AND GRUBBING |- |202 |REMOVAL OF EXISTING STRUCTURES |- | |[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/PDF/15-02001.pdf 15-02001] - REMOVAL OF EXISTING STRUCTURES |- |203 |RESETTING EXISTING CULVERTS |- |204 |EXCAVATION AND BACKFILL FOR STRUCTURES |- |205 |EXCAVATION AND EMBANKMENT FOR HIGHWAYS |- | |[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMai...")
 
m
Line 1: Line 1:
'''<u>EARTHWORK</u>'''
== '''<u>EARTHWORK</u>''' ==
{| class="wikitable"
{| class="wikitable"
|[[201]]
|[[201]]

Revision as of 11:38, 12 January 2024

EARTHWORK

201 CLEARING AND GRUBBING
202 REMOVAL OF EXISTING STRUCTURES
15-02001 - REMOVAL OF EXISTING STRUCTURES
203 RESETTING EXISTING CULVERTS
204 EXCAVATION AND BACKFILL FOR STRUCTURES
205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS
15-ER-1-22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOON FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
206 SELECT SOIL
207 OVERHAUL
208 LINEAR GRADING
209 SPECIAL FILL
210 SALVAGING, STOCKPILING AND PLACING TOPSOIL
211 GEOFOAM LIGHTWEIGHT EMBANKMENT FILL
212 GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL
213 PREFABRICATED VERTICAL DRAIN
214 MECHANICALLY STABILIZED EARTH FILL
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
215 GRANULAR DRAINAGE BLANKET