Recent changes

Jump to navigation Jump to search

Track the most recent changes to the wiki on this page.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Show my edits | Hide bots | Show minor edits
Show new changes starting from 22:45, 22 June 2024
   
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

18 June 2024

     13:26  Phase III - Final Design‎‎ 2 changes history +25 [Alisha Holcomb‎ (2×)]
     
13:26 (cur | prev) +16 Alisha Holcomb talk contribs →‎City's Standard Contract Documents:
     
13:23 (cur | prev) +9 Alisha Holcomb talk contribs →‎City's Standard Contract Documents:
     13:25  (Upload log) [Alisha Holcomb‎ (3×)]
     
13:25 Alisha Holcomb talk contribs uploaded File:07 III-11a-1 Agreement-KDOT Fed funds clean 1-5-22.docx
     
13:23 Alisha Holcomb talk contribs uploaded File:05 III-11a-1 Agreement clean.docx
     
08:45 Alisha Holcomb talk contribs uploaded File:II-3a Engineering Architectural Services Agreement rev 5-29-24.docx
     08:46  Phase II - Preliminary Design diffhist 0 Alisha Holcomb talk contribs →‎Task No. 3 - Consultant Selection/Certification

7 June 2024

     11:35  Approved Materials - Traffic Signals diffhist −94 Brian Geiger talk contribs →‎Power Transfer Switches: Updated from SPH-302 to SPH-303 bypass switch.
     11:34  (Upload log) [Brian Geiger‎ (2×)]
     
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS MEM Clary PowerTransferSwitch.pdf(File uploaded with MsUpload)
     
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS CAT Clary PowerTransferSwitch.pdf(File uploaded with MsUpload)

6 June 2024

     15:29 User rights log Dan Hurley talk contribs changed group membership for Tiesha Morgan from (none) to administrator and bureaucrat ‎
     15:14 User creation log User account Tiesha Morgan talk contribs was created by Dan Hurley talk contribs

31 May 2024

     14:59  Phase V - Construction diffhist +12 Alisha Holcomb talk contribs →‎Task No. 14 - On-Going Contractor Payments
     10:17  Phase IV - Pre-Construction diffhist +1 Alisha Holcomb talk contribs →‎Task No. 2 - Selection of Material Testing Firm
     10:17 Upload log Alisha Holcomb talk contribs uploaded File:IV-2g Testing Services Agreement - rev 5-31-24.docx

29 May 2024

     15:27  Phase IV - Pre-Construction diffhist 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     15:23 Upload log Alisha Holcomb talk contribs uploaded File:IV-5f Traffic Signal Streetlight-Fiber Equipment 5-29-24.docx