Recent changes

Jump to navigation Jump to search

Track the most recent changes to the wiki on this page.

Recent changes options Below are the changes since 22 May 2024, 22:05 (up to 50 shown). (Reset date selection)
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 15:50, 15 June 2024
   
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

7 June 2024

     11:35  Approved Materials - Traffic Signals diffhist −94 Brian Geiger talk contribs →‎Power Transfer Switches: Updated from SPH-302 to SPH-303 bypass switch.
     11:34  (Upload log) [Brian Geiger‎ (2×)]
     
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS MEM Clary PowerTransferSwitch.pdf(File uploaded with MsUpload)
     
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS CAT Clary PowerTransferSwitch.pdf(File uploaded with MsUpload)

6 June 2024

     15:29 User rights log Dan Hurley talk contribs changed group membership for Tiesha Morgan from (none) to administrator and bureaucrat ‎
     15:14 User creation log User account Tiesha Morgan talk contribs was created by Dan Hurley talk contribs
 m   09:48  Approved Materials - Traffic Signals diffhist +85 Brian Geiger talk contribs →‎Power Transfer Switches: Notes about discontinuation of SPH-302 with Jim Cole on a phone call with Hightower.

31 May 2024

     14:59  Phase V - Construction diffhist +12 Alisha Holcomb talk contribs →‎Task No. 14 - On-Going Contractor Payments
     10:17  Phase IV - Pre-Construction diffhist +1 Alisha Holcomb talk contribs →‎Task No. 2 - Selection of Material Testing Firm
     10:17 Upload log Alisha Holcomb talk contribs uploaded File:IV-2g Testing Services Agreement - rev 5-31-24.docx

29 May 2024

     15:27  Phase IV - Pre-Construction diffhist 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     15:23 Upload log Alisha Holcomb talk contribs uploaded File:IV-5f Traffic Signal Streetlight-Fiber Equipment 5-29-24.docx