Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • File:V-15c.dot
    sample completed change order form.
    (31 KB) - 11:27, 12 September 2012
  • File:V-15d.dot
    sample change order transmittal letter.
    (33 KB) - 11:27, 12 September 2012
  • File:V-15a.dot
    blank change order form. (Word Format)
    (21 KB) - 09:17, 23 July 2012
  • File:V-15b.xlt
    blank change order form. (Excel Format)
    (21 KB) - 07:49, 28 October 2011
  • == Task No. 15 - On-Going Change Orders == ...act time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Ref
    47 KB (7,234 words) - 09:01, 16 June 2023
  • <li>To change the color of text, you need to use HTML font color tags. The following exam ...izing your signature|Customizing your signature]] in this guide for how to change your signature from your username to a preferred name.
    21 KB (3,776 words) - 13:17, 4 October 2012
  • ...ltiplying factor included in the calculations to account for factors which change in time after the initial installation of the streetlighting system. This ...the control center can be relocated to a better position, make the design change. If not, ask KCP&L to provide an estimate to the City for the cost associa
    134 KB (20,478 words) - 12:33, 13 December 2023