Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Hide bots | Hide minor edits
Show new changes starting from 10:49, 5 December 2021
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

3 December 2021

     15:42  Phase II - Preliminary Design‎‎ 3 changes history+1,004[Joe Archer‎ (3×)]
     
15:42 (cur | prev) +1 Joe Archer talk contribs →‎Task No. 9 - Design Criteria
     
15:33 (cur | prev) +830 Joe Archer talk contribs →‎Task No. 9 - Design Criteria
     
15:10 (cur | prev) +173 Joe Archer talk contribs →‎Task No. 9 - Design Criteria

19 November 2021

  b  10:50  Phase III - Final Design diffhist -95 Irina Idelson talk contribs →‎Task No. 14 - Submit PS&E Package
  b  10:19  Phase IV - Pre-Construction diffhist +15 Irina Idelson talk contribs →‎Task No. 8 - Determine Contractor Qualifications - KDOT Projects

17 November 2021

  b  08:55  Phase IV - Pre-Construction diffhist +11 Irina Idelson talk contribs →‎Task No. 8 - Determine Contractor Qualifications - KDOT Projects
  b  08:04  Phase III - Final Design diffhist +2 Irina Idelson talk contribs →‎Task No. 14 - Submit PS&E Package
  b  07:55  Phase II - Preliminary Design diffhist -3 Irina Idelson talk contribs →‎Task No. 31 - Complete Public Interest Finding

16 November 2021

  b  16:51  Phase V - Construction‎‎ 5 changes history+107[Irina Idelson‎ (5×)]
  b  
16:51 (cur | prev) -13 Irina Idelson talk contribs →‎Task No. 14 - On-Going Contractor Payments
  b  
16:50 (cur | prev) 0 Irina Idelson talk contribs →‎Task No. 4 - Distribute Executed Contract Documents
  b  
16:49 (cur | prev) +4 Irina Idelson talk contribs →‎Task No. 4 - Distribute Executed Contract Documents
  b  
16:48 (cur | prev) +58 Irina Idelson talk contribs →‎Task No. 4 - Distribute Executed Contract Documents
  b  
16:44 (cur | prev) +58 Irina Idelson talk contribs →‎Task No. 4 - Distribute Executed Contract Documents
  b  10:29  Phase II - Preliminary Design diffhist +3 Irina Idelson talk contribs →‎Task No. 31 - Complete Public Interest Finding

10 November 2021

  b  07:31  Phase V - Construction diffhist +33 Irina Idelson talk contribs →‎Task No. 12 - On-Going Inspections

8 November 2021

     07:49  Phase II - Preliminary Design diffhist +5 Joe Archer talk contribs →‎Task No. 9 - Design Criteria