Recent changes

Jump to navigation Jump to search

Track the most recent changes to the wiki on this page.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 12:02, 19 April 2024
   
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

10 April 2024

 m   08:14  Approved Materials - Specialty Items diffhist +27 Brian Geiger talk contribs →‎Soffit Lights: Added bird shroud.
     08:13  (Upload log) [Brian Geiger‎ (2×)]
     
08:13 Brian Geiger talk contribs uploaded a new version of File:TRF PQL SI CAT Holophane SoffitMountLED.pdf(File uploaded with MsUpload)
     
08:13 Brian Geiger talk contribs uploaded a new version of File:TRF PQL SI MEM Holophane SoffitMountLED.pdf(File uploaded with MsUpload)

8 April 2024

     16:38  Pavement Marking Design Manual diffhist +11 Brian Geiger talk contribs →‎Broken White Lane Lines: Clarified breaking for private streets as well.

3 April 2024

     10:09  Phase II - Preliminary Design diffhist +1 Alisha Holcomb talk contribs →‎Task No. 3 - Consultant Selection/Certification
     10:09  (Upload log) [Alisha Holcomb‎ (11×)]
     
10:09 Alisha Holcomb talk contribs uploaded File:II-3o CONSULTING FIRMS 3-28-24.xlsx
     
10:08 Alisha Holcomb talk contribs uploaded File:IV-2a MATERIAL TESTING 4-3-24.docx
     
10:07 Alisha Holcomb talk contribs uploaded File:IV-5a STREETS AND BRIDGES 3-29-24.docx
     
10:06 Alisha Holcomb talk contribs uploaded File:IV-5b STORM SEWER 3-29-24.docx
     
10:05 Alisha Holcomb talk contribs uploaded File:IV-5c SIDEWALK AND CURB 3-29-24.docx
     
10:05 Alisha Holcomb talk contribs uploaded File:IV-5d Streetlighting-Construction 3-29-24.docx
     
10:03 Alisha Holcomb talk contribs uploaded File:IV-5e Traffic Signal construction 3-29-24.docx
     
10:02 Alisha Holcomb talk contribs uploaded File:IV-5f Traffic Signal Streetlight-Fiber Equipment 3-29-24.docx
     
10:00 Alisha Holcomb talk contribs uploaded File:IV-5g Fiber Optic Construction 3-29-24.docx
     
09:57 Alisha Holcomb talk contribs uploaded File:IV-5i Buildings 4-3-24.docx
     
09:56 Alisha Holcomb talk contribs uploaded File:IV-5m EVSE Contractors 3-29-24.docx
     10:08  Phase IV - Pre-Construction‎‎ 10 changes history +14 [Alisha Holcomb‎ (10×)]
     
10:08 (cur | prev) +15 Alisha Holcomb talk contribs →‎Task No. 2 - Selection of Material Testing Firm
     
10:07 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:07 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:06 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:05 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:03 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:03 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
10:01 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
09:58 (cur | prev) −1 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms
     
09:56 (cur | prev) 0 Alisha Holcomb talk contribs →‎Task No. 5 - Notice to Contractors/DBE Firms