User contributions for Mike Ross
Jump to navigation
Jump to search
- 16:44, 1 October 2013 diff hist +287 Approved Materials - Traffic Signals →HDPE Signal Conduit
- 16:43, 1 October 2013 diff hist +287 Approved Materials - Traffic Signals →HDPE Couplings
- 16:33, 1 October 2013 diff hist +734 Approved Materials - Traffic Signals →Electrical Service Cable
- 16:29, 1 October 2013 diff hist +300 Approved Materials - Traffic Signals →#6 AWG Equipment Ground Wire
- 16:28, 1 October 2013 diff hist +668 Approved Materials - Traffic Signals →Ground Wire and Tracer Wire
- 16:24, 1 October 2013 diff hist +367 Approved Materials - Traffic Signals →Shielded Detector Lead-in 2c#14
- 16:21, 1 October 2013 diff hist +127 Approved Materials - Traffic Signals →Radar Detector Harness Cable
- 16:20, 1 October 2013 diff hist +179 Approved Materials - Traffic Signals →Radar Detector Home Run Cable
- 16:19, 1 October 2013 diff hist +62 Approved Materials - Traffic Signals →Emergency Vehicle Pre-emption (EVP) Detector Cable
- 16:18, 1 October 2013 diff hist +55 Approved Materials - Traffic Signals →Loop Home Run Cable
- 16:17, 1 October 2013 diff hist −16 Approved Materials - Traffic Signals →Micro loop Home Run
- 16:16, 1 October 2013 diff hist +422 Approved Materials - Traffic Signals →Multi-conductor 7c#14 and 2c#14
- 16:14, 1 October 2013 diff hist +2 Approved Materials - Traffic Signals →Induction Loop Cable 1c#14
- 16:13, 1 October 2013 diff hist +355 Approved Materials - Traffic Signals →Induction Loop Cable 1c#14
- 16:08, 1 October 2013 diff hist +150 Approved Materials - Traffic Signals →CNG Power Cable 1-3c #2AWG
- 16:06, 1 October 2013 diff hist +103 Approved Materials - Traffic Signals →CNG Monitoring Cable/Illuminated Street Name Sign Cable
- 16:05, 1 October 2013 diff hist +256 Approved Materials - Traffic Signals →CCTV Camera Power Cable
- 16:03, 1 October 2013 diff hist +4 Approved Materials - Traffic Signals →CCTV Camera Pan-Tilt-Zoom Cable
- 16:02, 1 October 2013 diff hist +64 Approved Materials - Traffic Signals →CCTV Camera Pan-Tilt-Zoom Cable
- 16:01, 1 October 2013 diff hist +31 Approved Materials - Traffic Signals →CCTV Camera Communication Cable
- 16:00, 1 October 2013 diff hist +108 Approved Materials - Traffic Signals →CCTV Camera Communication Cable
- 15:58, 1 October 2013 diff hist +150 Approved Materials - Traffic Signals →CCTV Camera Cat 5e Cable
- 15:57, 1 October 2013 diff hist +126 Approved Materials - Traffic Signals →Video Detection Cable
- 15:29, 1 October 2013 diff hist +621 Approved Materials - Traffic Signals →Backplates (Vehicular)
- 15:26, 1 October 2013 diff hist +37,365 Approved Materials - Traffic Signals
- 15:23, 1 October 2013 diff hist +1,624 Approved Materials - Traffic Signals →Miscellaneous Controller Equipment
- 15:14, 1 October 2013 diff hist +19,548 Approved Materials - Traffic Signals
- 14:52, 1 October 2013 diff hist +189 N Approved Materials - Traffic Signals Created page with "<font size="4">Return to Complete Preapproved Materials Page</font> {{PQLDisclaimer}} <u>{{PQL-CSF|TRF-PQL-TS-CSF.docx}}</u> <div class="noautonum"..."
- 14:52, 1 October 2013 diff hist +60 Approved Materials
- 14:47, 1 October 2013 diff hist +46 Approved Materials - Traffic Control →Warning Lights
- 14:46, 1 October 2013 diff hist −16 Approved Materials - Traffic Control →Non-removable Tape
- 14:46, 1 October 2013 diff hist −10 Approved Materials - Traffic Control →Removable Tape
- 14:45, 1 October 2013 diff hist −7 Approved Materials - Traffic Control →Waterborne Paint
- 14:44, 1 October 2013 diff hist +272 Approved Materials - Traffic Control →Sign Stands
- 14:42, 1 October 2013 diff hist +217 Approved Materials - Traffic Control →Sign Sheeting
- 14:41, 1 October 2013 diff hist +43 Approved Materials - Traffic Control →Sand Barrels
- 14:41, 1 October 2013 diff hist +179 Approved Materials - Traffic Control →Drums
- 14:39, 1 October 2013 diff hist +284 Approved Materials - Traffic Control →Conical Delineator/Trim Line Cone
- 14:38, 1 October 2013 diff hist +156 Approved Materials - Traffic Control →Changeable Message Signs
- 14:37, 1 October 2013 diff hist +79 Approved Materials - Traffic Control →ADA Pedestrian Barricades
- 14:36, 1 October 2013 diff hist +104 Approved Materials - Traffic Control →ADA Pedestrian Barricades
- 14:35, 1 October 2013 diff hist +203 Approved Materials - Traffic Control →Type III Barricades
- 14:34, 1 October 2013 diff hist −4 Approved Materials - Traffic Control →Type II Barricades
- 14:34, 1 October 2013 diff hist −43 Approved Materials - Traffic Control →Type I Barricades
- 14:33, 1 October 2013 diff hist +39 Approved Materials - Traffic Control →Type I Barricades
- 14:33, 1 October 2013 diff hist +322 Approved Materials - Traffic Control →Arrow Panels
- 14:31, 1 October 2013 diff hist +8,256 Approved Materials - Traffic Control
- 14:26, 1 October 2013 diff hist +189 N Approved Materials - Traffic Control Created page with "<font size="4">Return to Complete Preapproved Materials Page</font> {{PQLDisclaimer}} <u>{{PQL-CSF|TRF-PQL-TC-CSF.docx}}</u> <div class="noautonum"..."
- 14:26, 1 October 2013 diff hist +60 Approved Materials
- 14:03, 1 October 2013 diff hist +36 Approved Materials - Pavement Marking
- 14:02, 1 October 2013 diff hist +747 Approved Materials - Streetlighting →Screw-In Pole Foundations
- 13:32, 1 October 2013 diff hist +410 Approved Materials - Streetlighting →Aluminum Poles 14' Mounting Heights
- 13:31, 1 October 2013 diff hist −3 Approved Materials - Streetlighting →Aluminum Street Light Bracket Arms
- 13:31, 1 October 2013 diff hist +12 Approved Materials - Streetlighting →Aluminum Street Light Bracket Arms
- 13:30, 1 October 2013 diff hist +475 Approved Materials - Streetlighting →Aluminum Street Light Bracket Arms
- 13:27, 1 October 2013 diff hist +1,304 Approved Materials - Streetlighting →Aluminum Poles 40' Mounting Heights
- 13:24, 1 October 2013 diff hist +30 Approved Materials - Streetlighting →Aluminum Poles 30' Mounting Heights
- 13:23, 1 October 2013 diff hist +1,038 Approved Materials - Streetlighting →Aluminum Poles 30' Mounting Heights
- 13:20, 1 October 2013 diff hist +1 Approved Materials - Streetlighting →System Photocell
- 13:20, 1 October 2013 diff hist +51 Approved Materials - Streetlighting →System Photocell
- 13:19, 1 October 2013 diff hist +298 Approved Materials - Streetlighting →Residential Post Top
- 13:17, 1 October 2013 diff hist +42 Approved Materials - Streetlighting →Highway Luminaire
- 13:16, 1 October 2013 diff hist +2 Approved Materials - Streetlighting →Cobra-Head Luminaire
- 13:16, 1 October 2013 diff hist +811 Approved Materials - Streetlighting →Cobra-Head Luminaire
- 13:12, 1 October 2013 diff hist +4 Approved Materials - Streetlighting →High Pressure Sodium
- 13:10, 1 October 2013 diff hist +12 Approved Materials - Streetlighting →High Pressure Sodium
- 13:09, 1 October 2013 diff hist +667 Approved Materials - Streetlighting →High Pressure Sodium
- 13:07, 1 October 2013 diff hist +886 Approved Materials - Streetlighting →Type II Junction Box
- 13:03, 1 October 2013 diff hist +937 Approved Materials - Streetlighting →Type I Junction Box
- 13:00, 1 October 2013 diff hist +226 Approved Materials - Streetlighting →Ground Rod Clamp
- 12:58, 1 October 2013 diff hist +72 Approved Materials - Streetlighting →Ground Rod
- 12:57, 1 October 2013 diff hist +222 Approved Materials - Streetlighting →Ground Rod
- 12:55, 1 October 2013 diff hist +25 Approved Materials - Streetlighting →Control Centers (Single-Circuit)
- 12:55, 1 October 2013 diff hist +256 Approved Materials - Streetlighting →Control Centers (Single-Circuit)
- 12:53, 1 October 2013 diff hist +214 Approved Materials - Streetlighting →Control Centers (Four-Circuit)
- 12:51, 1 October 2013 diff hist −43 Approved Materials - Streetlighting →Splice Kits
- 12:51, 1 October 2013 diff hist +12 Approved Materials - Streetlighting →Splice Kits
- 12:51, 1 October 2013 diff hist +476 Approved Materials - Streetlighting →Splice Kits
- 12:48, 1 October 2013 diff hist +122 Approved Materials - Streetlighting →Fuses
- 12:47, 1 October 2013 diff hist +3 Approved Materials - Streetlighting →Un-Fused Fuse Holders
- 12:47, 1 October 2013 diff hist +141 Approved Materials - Streetlighting →Fused Fuse Holders
- 12:45, 1 October 2013 diff hist +154 Approved Materials - Streetlighting →Un-Fused Fuse Holders
- 12:44, 1 October 2013 diff hist −43 Approved Materials - Streetlighting →Multi-tap Connectors
- 12:44, 1 October 2013 diff hist +414 Approved Materials - Streetlighting →Multi-tap Connectors
- 12:39, 1 October 2013 diff hist +611 Approved Materials - Streetlighting →HDPE Couplings
- 12:35, 1 October 2013 diff hist +130 Approved Materials - Specialty Items →Street Lighting Items
- 12:34, 1 October 2013 diff hist +5 Approved Materials - Specialty Items →Signal Speciality Items
- 12:33, 1 October 2013 diff hist +30 Approved Materials - Specialty Items →Signal Speciality Items
- 12:32, 1 October 2013 diff hist +96 Approved Materials - Specialty Items →Signal Speciality Items
- 12:30, 1 October 2013 diff hist +24 Approved Materials - Specialty Items
- 12:28, 1 October 2013 diff hist +28 Approved Materials - Specialty Items →Decorative Signal Poles
- 12:26, 1 October 2013 diff hist +36 Approved Materials - Specialty Items
- 12:26, 1 October 2013 diff hist +36 Approved Materials - Signing
- 12:26, 1 October 2013 diff hist +36 Approved Materials - ITS
- 12:26, 1 October 2013 diff hist +36 Approved Materials - Fiber Optics
- 08:20, 1 October 2013 diff hist +165 Approved Materials - Streetlighting →HDPE Service Conduit
- 08:18, 1 October 2013 diff hist +159 Approved Materials - Streetlighting →HDPE Conduit
- 08:16, 1 October 2013 diff hist +96 Approved Materials - Streetlighting →PVC Fittings
- 08:14, 1 October 2013 diff hist +62 Approved Materials - Streetlighting →PVC Fittings
- 08:13, 1 October 2013 diff hist +1,014 Approved Materials - Streetlighting →PVC Fittings
- 08:09, 1 October 2013 diff hist +168 Approved Materials - Streetlighting →PVC Fittings
- 08:05, 1 October 2013 diff hist +974 Approved Materials - Streetlighting →PVC Fittings
- 08:03, 1 October 2013 diff hist −15 Approved Materials - Streetlighting →PVC Fittings
- 08:02, 1 October 2013 diff hist +54 Approved Materials - Streetlighting →PVC Fittings
- 08:00, 1 October 2013 diff hist +502 Approved Materials - Streetlighting →PVC Fittings
- 07:54, 1 October 2013 diff hist +444 Approved Materials - Streetlighting →PVC Conduit
- 07:52, 1 October 2013 diff hist +2 Approved Materials - Streetlighting →PVC Conduit
- 07:52, 1 October 2013 diff hist +664 Approved Materials - Streetlighting →PVC Conduit
- 07:48, 1 October 2013 diff hist +733 Approved Materials - Streetlighting →Electrical Service Cable
- 07:45, 1 October 2013 diff hist −2 Approved Materials - Streetlighting →Pole Cable
- 07:44, 1 October 2013 diff hist +749 Approved Materials - Streetlighting →Pole Cable
- 07:40, 1 October 2013 diff hist +733 Approved Materials - Streetlighting →Distribution Cable
- 07:36, 1 October 2013 diff hist +2 Approved Materials - Streetlighting →Ground Wire
- 07:36, 1 October 2013 diff hist +293 Approved Materials - Streetlighting →Ground Wire
- 07:34, 1 October 2013 diff hist −76 Approved Materials - Streetlighting →Breakaway Pole Devices
- 07:31, 1 October 2013 diff hist +16,575 Approved Materials - Streetlighting
- 07:09, 1 October 2013 diff hist +7 Approved Materials - Streetlighting
- 06:59, 1 October 2013 diff hist +37 Approved Materials - Streetlighting
- 06:58, 1 October 2013 diff hist +36 Approved Materials - Streetlighting
- 06:56, 1 October 2013 diff hist +163 Approved Materials - Streetlighting
- 06:54, 1 October 2013 diff hist +1,131 N Approved Materials - Streetlighting Created page with "<font size="4">Return to Complete Preapproved Materials Page</font> {{PQLDisclaimer}} {{PQL-CSF|TRF-PQL-SL-CSF.docx}} == Breakaway Pole Devices ==..."
- 06:45, 1 October 2013 diff hist +61 Approved Materials
- 06:40, 1 October 2013 diff hist +90 Approved Materials - Specialty Items →Screw-In Foundations for Downtown OP Pole
- 06:39, 1 October 2013 diff hist +137 Approved Materials - Specialty Items →Pole Base Cover
- 06:38, 1 October 2013 diff hist +14 Approved Materials - Specialty Items →Pedestrian Pushbutton Pole and Foundation
- 06:38, 1 October 2013 diff hist +156 Approved Materials - Specialty Items →Pedestrian Pushbutton Pole and Foundation
- 06:36, 1 October 2013 diff hist −574 Approved Materials - Specialty Items →Special Screw-In Foundations
- 06:36, 1 October 2013 diff hist −64 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:35, 1 October 2013 diff hist −108 Approved Materials - Specialty Items →Pedestrian Pushbutton Pole
- 06:32, 1 October 2013 diff hist +349 Approved Materials - Specialty Items →Special Pole for Warp9 Bolt Pattern Quivira Rd (99th to 95th)
- 06:30, 1 October 2013 diff hist −615 Approved Materials - Specialty Items →Light Poles
- 06:28, 1 October 2013 diff hist +413 Approved Materials - Specialty Items →Special Pole for Era Lantern Bolt Pattern 127th St (Metcalf to Nall)
- 06:26, 1 October 2013 diff hist −64 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:25, 1 October 2013 diff hist −4 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:25, 1 October 2013 diff hist +217 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:23, 1 October 2013 diff hist +552 Approved Materials - Specialty Items →Special Pole for Era Lantern Bolt Pattern 127th St (Metcalf to Nall)
- 06:23, 1 October 2013 diff hist −64 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:23, 1 October 2013 diff hist +551 Approved Materials - Specialty Items →Screw-In Foundations for Downtown OP Pole
- 06:23, 1 October 2013 diff hist +1,654 Approved Materials - Specialty Items →Pedestrian Pushbutton Pole
- 06:22, 1 October 2013 diff hist +551 Approved Materials - Specialty Items →Special Pole for Warp9 Bolt Pattern Quivira Rd (99th to 95th)
- 06:22, 1 October 2013 diff hist +552 Approved Materials - Specialty Items →Special Pole for Era Lantern Bolt Pattern 127th St (Metcalf to Nall)
- 06:22, 1 October 2013 diff hist +552 Approved Materials - Specialty Items →Special Pole for 159th Street Bridge over US-69 Highway
- 06:21, 1 October 2013 diff hist +547 Approved Materials - Specialty Items →Decorative Poles for Downtown OP and 132nd Street Bridge over US-69 Highway
- 15:43, 30 September 2013 diff hist −46 Approved Materials - Specialty Items →Light Poles
- 15:43, 30 September 2013 diff hist −2 Approved Materials - Specialty Items →110th Street & Roundabout Square Pole
- 15:42, 30 September 2013 diff hist +636 Approved Materials - Specialty Items →Community Center (Downtown) Parking Lot Pole
- 15:41, 30 September 2013 diff hist +562 Approved Materials - Specialty Items →110th Street & Roundabout Square Pole
- 15:39, 30 September 2013 diff hist −1 Approved Materials - Specialty Items →LED Light Fixtures
- 15:39, 30 September 2013 diff hist −53 Approved Materials - Specialty Items →LED Light Fixtures
- 15:38, 30 September 2013 diff hist +6 Approved Materials - Specialty Items →LED Light Fixtures
- 15:11, 30 September 2013 diff hist +764 Approved Materials - Specialty Items →LED Light Fixtures
- 13:14, 30 September 2013 diff hist +6 Approved Materials - Specialty Items →95th St & Nall Ave71st St & Metcalf Ave75th St & Metcalf Ave87th St & Metcalf Ave
- 13:12, 30 September 2013 diff hist +4 Approved Materials - Specialty Items →Quivira Road: 95th St. to 99th St.
- 13:12, 30 September 2013 diff hist +814 Approved Materials - Specialty Items →95th St: Quivira Rd to Nieman Rd
- 13:09, 30 September 2013 diff hist +3 Approved Materials - Specialty Items →95th St: Quivira Rd to Nieman Rd
- 13:09, 30 September 2013 diff hist +697 Approved Materials - Specialty Items →95th St: Quivira Rd to Nieman RdQuivira Road: 95th St to 99th St
- 13:05, 30 September 2013 diff hist +812 Approved Materials - Specialty Items →127th Street (Metcalf Ave to Nall Ave)
- 13:04, 30 September 2013 diff hist +795 Approved Materials - Specialty Items →159th Street Bridge Over US-69 Highway
- 13:02, 30 September 2013 diff hist +4 Approved Materials - Specialty Items →79th St & Metcalf Ave
- 13:02, 30 September 2013 diff hist +4 Approved Materials - Specialty Items →95th St & Nall Ave71st St & Metcalf Ave75th St & Metcalf Ave87th St & Metcalf Ave
- 13:02, 30 September 2013 diff hist +872 Approved Materials - Specialty Items →79th St & Metcalf Ave
- 13:00, 30 September 2013 diff hist +923 Approved Materials - Specialty Items →95th St & Nall Ave71st St & Metcalf Ave75th St & Metcalf Ave87th St & Metcalf Ave
- 12:55, 30 September 2013 diff hist +603 Approved Materials - Specialty Items →Downtown OP
- 12:54, 30 September 2013 diff hist +5 Approved Materials - Specialty Items →Downtown OP
- 12:54, 30 September 2013 diff hist +12 Approved Materials - Specialty Items →Community Center (Downtown) Parking Lot Fixture
- 12:54, 30 September 2013 diff hist +814 Approved Materials - Specialty Items →Community Center (Downtown) Parking Lot Fixture
- 12:52, 30 September 2013 diff hist +173 Approved Materials - Specialty Items
- 12:48, 30 September 2013 diff hist +837 Approved Materials - Specialty Items →133rd & Lamar; 132nd Street & US-69 Overpass; Vineyards and Mills Farm Roundabouts
- 12:46, 30 September 2013 diff hist +642 Approved Materials - Specialty Items →Antioch & I-435 Bicycle Tunnel Light FixtureIndian Creek Bicycle Trail under I-435
- 12:45, 30 September 2013 diff hist +37 Approved Materials - Specialty Items →110th Street & Lamar Roundabout Decorative Fixture
- 12:44, 30 September 2013 diff hist +592 Approved Materials - Specialty Items →110th & Lamar Roundabout Landscape Fixture
- 12:43, 30 September 2013 diff hist +592 Approved Materials - Specialty Items →110th Street & Lamar Roundabout Decorative Fixture
- 12:42, 30 September 2013 diff hist +2 Approved Materials - Specialty Items →Antioch & I-435 Bridge Decorative Fixture
- 12:41, 30 September 2013 diff hist +621 Approved Materials - Specialty Items →Antioch & I-435 Bridge Decorative Fixture
- 12:40, 30 September 2013 diff hist +1,161 Approved Materials - Specialty Items →Decorative Bases for Pedestrian Poles
- 12:36, 30 September 2013 diff hist −6 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:35, 30 September 2013 diff hist +1,202 Approved Materials - Specialty Items →Decorative Bases for Mast Arm Poles
- 12:32, 30 September 2013 diff hist +1,196 Approved Materials - Specialty Items →Pedestal Poles
- 12:28, 30 September 2013 diff hist +11 Approved Materials - Specialty Items →Mast Arm Poles
- 12:27, 30 September 2013 diff hist +2 Approved Materials - Specialty Items →Mast Arm Poles
- 12:26, 30 September 2013 diff hist +6 Approved Materials - Specialty Items →Mast Arm Poles
- 12:26, 30 September 2013 diff hist +877 Approved Materials - Specialty Items →Mast Arm Poles
- 12:22, 30 September 2013 diff hist +519 Approved Materials - Specialty Items →Mast Arm Poles
- 12:20, 30 September 2013 diff hist +114 Approved Materials - Specialty Items
- 11:24, 30 September 2013 diff hist +633 Approved Materials - Specialty Items
- 11:18, 30 September 2013 diff hist +209 Approved Materials - Specialty Items
- 11:15, 30 September 2013 diff hist +536 N Approved Materials - Specialty Items Created page with "== Decorative Signal Poles == === Mast Arm Poles === === Pedestal Poles === === Decorative Bases for Mast Arm Poles === === Decorative Bases for Pedestrian Poles === == Lig..."
- 11:09, 30 September 2013 diff hist +60 Approved Materials
- 11:06, 30 September 2013 diff hist +36 Approved Materials - Signing
- 11:05, 30 September 2013 diff hist +33 Approved Materials - Pavement Marking
- 11:05, 30 September 2013 diff hist +34 Approved Materials - ITS
- 11:03, 30 September 2013 diff hist +2 Template:PQL-CSF
- 11:03, 30 September 2013 diff hist +56 N Template:PQL-CSF Created page with "[[Media:{{1}}|Click me for a contractor submittal form]]"
- 11:02, 30 September 2013 diff hist +33 Approved Materials - Fiber Optics
- 11:01, 30 September 2013 diff hist +40 N File:TRF-PQL-TS-CSF.docx Traffic Signal contractor submittal form
- 11:00, 30 September 2013 diff hist +41 N File:TRF-PQL-TC-CSF.docx Traffic Control contractor submittal form
- 10:59, 30 September 2013 diff hist +40 N File:TRF-PQL-SL-CSF.docx Streetlighting contractor submittal form
- 10:58, 30 September 2013 diff hist +43 N File:TRF-PQL-SGN-CSF.docx Permanent Signing contractor submittal form
- 10:56, 30 September 2013 diff hist +42 N File:TRF-PQL-PM-CSF.docx Pavement Marking contractor submittal form
- 10:54, 30 September 2013 diff hist +39 N File:TRF-PQL-ITS-CSF.docx ITS Equipment contractor submittal form
- 10:53, 30 September 2013 diff hist +30 N File:TRF-PQL-FO-CSF.docx Fiber Optic PQL submittal form
- 10:27, 30 September 2013 diff hist +51 Approved Materials
- 08:20, 30 September 2013 diff hist +292 Approved Materials - Signing →Electronic Cuttable Film
- 08:18, 30 September 2013 diff hist +667 Approved Materials - Signing →Type XI Diamond Grade "Full Cube" Sheeting
- 08:13, 30 September 2013 diff hist −7 Approved Materials - Signing →Round Pedestal Pole
- 08:12, 30 September 2013 diff hist +132 Approved Materials - Signing →Screw-In Foundation
- 08:11, 30 September 2013 diff hist −4 Approved Materials - Signing →Solar Cabinet
- 08:11, 30 September 2013 diff hist +87 Approved Materials - Signing →Flasher
- 08:10, 30 September 2013 diff hist +21 Approved Materials - Signing →Solar Flasher Panel
- 08:09, 30 September 2013 diff hist +38 Approved Materials - Signing →Solar Panel
- 08:09, 30 September 2013 diff hist −7 Approved Materials - Signing →Side-of-Pole Bracket
- 08:08, 30 September 2013 diff hist +21 Approved Materials - Signing →Vehicular Signal Head
- 08:07, 30 September 2013 diff hist +70 Approved Materials - Signing →Yellow Ball LED
- 08:06, 30 September 2013 diff hist +83 Approved Materials - Signing →Time Switch
- 08:05, 30 September 2013 diff hist +46 Approved Materials - Signing →Surge Protector Polyphaser
- 08:04, 30 September 2013 diff hist +40 Approved Materials - Signing →Remote Radio
- 08:03, 30 September 2013 diff hist +238 Approved Materials - Signing →Master Radio Assembly
- 08:02, 30 September 2013 diff hist +162 Approved Materials - Signing →2 ¼” x 2 ¼” Sleeves
- 08:00, 30 September 2013 diff hist +161 Approved Materials - Signing →2” x 2” Anchor
- 07:59, 30 September 2013 diff hist +7 Approved Materials - Signing →1 ¾” x 1 ¾” Posts
- 07:58, 30 September 2013 diff hist +195 Approved Materials - Signing →1 ¾” x 1 ¾” Posts
- 07:57, 30 September 2013 diff hist +207 Approved Materials - Signing →Banding Buckle
- 07:55, 30 September 2013 diff hist +2 Approved Materials - Signing →Sign Banding
- 07:55, 30 September 2013 diff hist +189 Approved Materials - Signing →Sign Banding
- 07:53, 30 September 2013 diff hist +116 Approved Materials - Signing →Round Pole Mounting Bracket
- 07:51, 30 September 2013 diff hist +65 Approved Materials - Signing →Wing Mounting Brackets
- 07:49, 30 September 2013 diff hist +4 Approved Materials - Signing →Aluminum Sign Mast Arm Brackets
- 07:49, 30 September 2013 diff hist +6 Approved Materials - Signing →Illuminated Street Name Sign Brackets
- 07:39, 30 September 2013 diff hist +39 Approved Materials - Signing →Illuminated Street Name Sign Brackets
- 07:37, 30 September 2013 diff hist +49 Approved Materials - Signing →Aluminum Sign Mast Arm Brackets
- 07:36, 30 September 2013 diff hist +27 Approved Materials - Signing →Aluminum Sign Mast Arm Brackets
- 07:36, 30 September 2013 diff hist +10 Approved Materials - Signing →Aluminum Sign Mast Arm Brackets
- 07:35, 30 September 2013 diff hist +1 Approved Materials - Signing →Aluminum Sign Mast Arm Brackets
- 07:34, 30 September 2013 diff hist −449 Approved Materials - Signing →Mounting Brackets
- 07:32, 30 September 2013 diff hist +32 Approved Materials - Signing →Illuminated Street Name Signs
- 07:31, 30 September 2013 diff hist +289 Approved Materials - Signing →Illuminated Street Name Signs
- 07:29, 30 September 2013 diff hist +96 Approved Materials - Signing →Driver Feedback Signs
- 07:28, 30 September 2013 diff hist +109 Approved Materials - Signing →Driver Feedback Signs
- 07:26, 30 September 2013 diff hist +33 Approved Materials - Signing →Sign Power Cable
- 07:25, 30 September 2013 diff hist +35 Approved Materials - Signing →Sign Power Cable
- 07:24, 30 September 2013 diff hist +116 Approved Materials - Signing →Cable for Illuminated Street Name Signs & Blank-out Signs
- 07:22, 30 September 2013 diff hist +25 Approved Materials - Signing →R1-11 "No Turn on Red" Ball symbol
- 07:21, 30 September 2013 diff hist +111 Approved Materials - Signing →Blank-Out Signs
- 07:18, 30 September 2013 diff hist +43 Approved Materials - Signing →Overhead Street Name Signs
- 07:18, 30 September 2013 diff hist +43 Approved Materials - Signing →Standard Signs
- 07:16, 30 September 2013 diff hist +30 Approved Materials - Signing →Overhead Street Name Signs
- 07:15, 30 September 2013 diff hist +30 Approved Materials - Signing →Standard Signs
- 07:12, 30 September 2013 diff hist +28 Approved Materials - Signing →Overhead Street Name Signs
- 07:12, 30 September 2013 diff hist +28 Approved Materials - Signing →Standard Signs
- 07:11, 30 September 2013 diff hist +30 Approved Materials - Signing →Overhead Street Name Signs