- 08:37, 12 April 2010 diff hist +175 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 08:23, 12 April 2010 diff hist −98 Phase II - Preliminary Design →Task No. 32 - Submit R/W Plans/Legal Descriptions
- 08:23, 12 April 2010 diff hist +28 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 08:21, 12 April 2010 diff hist +170 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 08:16, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Hire Appraiser
- 08:15, 12 April 2010 diff hist +34 N File:II-34i appraisal review.dot is a copy of Appraisal Review form
- 08:15, 12 April 2010 diff hist +82 N File:II-32g.dot sample Intra City memorandum to the Selection Committee with staff recommendations
- 08:15, 12 April 2010 diff hist +105 N File:II-32f.dot sample Intra City memorandum to the Selection Committee with proposals from appraisers and ranking sheet.
- 08:15, 12 April 2010 diff hist +41 N File:II-32e.dot Appraiser Agreement for fee over $10,000.
- 08:12, 12 April 2010 diff hist +114 Phase II - Preliminary Design →Task No. 33 - Hire Appraiser
- 08:12, 12 April 2010 diff hist +29 N File:Ii-33h.dot copy of Appraisal Review form
- 08:12, 12 April 2010 diff hist +82 N File:Ii-33g.dot sample Intra City memorandum to the Selection Committee with staff recommendations
- 08:12, 12 April 2010 diff hist +104 N File:Ii-33f.dot sample Intra City memorandum to the Selection Committee with proposals from appraisers and ranking sheet
- 08:12, 12 April 2010 diff hist +49 N File:Ii-33e.dot copy of Appraiser Agreement for fee over $10,000.
- 08:12, 12 April 2010 diff hist +49 N File:II-32d.dot opy of Appraiser Agreement for fee under $10,000.
- 08:12, 12 April 2010 diff hist +41 N File:II-33c.xlt list of the project right-of-way takings.
- 08:12, 12 April 2010 diff hist +49 N File:II-32b.dot copy of City's Request for Proposal (RFP) letter.
- 08:12, 12 April 2010 diff hist +33 N File:II-33a.dot list of City qualified appraisers
- 08:02, 12 April 2010 diff hist +6 Phase II - Preliminary Design →Task No. 20 - Prepare Field Check Plans
- 08:02, 12 April 2010 diff hist +63 Phase II - Preliminary Design →Task No. 19 - Begin Geotechnical Report Process
- 08:02, 12 April 2010 diff hist +53 N File:BLP-Memo-05-15.pdf Geotechnical Bridge Foundation Investigation Practice
- 07:59, 12 April 2010 diff hist +43 Phase II - Preliminary Design →Task No. 20 - Prepare Field Check Plans
- 07:59, 12 April 2010 diff hist +53 N File:Blp-memo-03-12.pdf Memo regarding Engineers Seal and Signature on plans.
- 07:56, 12 April 2010 diff hist +154 Phase II - Preliminary Design →Task No. 32 - Submit R/W Plans/Legal Descriptions
- 07:53, 12 April 2010 diff hist +97 N File:II-33c.pdf Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents
- 07:53, 12 April 2010 diff hist +90 N File:II-33b.pdf Memorandum from the Register of Deeds, Johnson County, regarding legal description format
- 07:53, 12 April 2010 diff hist +90 N File:II-33a.pdf Memorandum from the Register of Deeds, Johnson County, regarding legal description format
- 07:53, 12 April 2010 diff hist +43 N File:II-31.pdf example of legal descriptions and tract map
- 07:50, 12 April 2010 diff hist +6 Phase II - Preliminary Design →Task No. 27 - Prepare Preliminary Cash Flow Projection (update)
- 07:50, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 30 - Execute Official Agreement with KDOT
- 07:49, 12 April 2010 diff hist +29 Phase II - Preliminary Design →Task No. 30 - Execute Official Agreement with KDOT
- 07:49, 12 April 2010 diff hist +93 N File:II-28a.dot sample Resolution to be used when KDOT's City/State Agreement is sent to Council for approval
- 07:48, 12 April 2010 diff hist +93 N File:Ii-30a.dot sample Resolution to be used when KDOT's City/State Agreement is sent to Council for approval
- 07:47, 12 April 2010 diff hist +74 N File:II-28.pdf sample of KDOT's official a2007 KDOT Utility Accommodation Policygreement.
- 07:46, 12 April 2010 diff hist +14 Phase II - Preliminary Design →Task No. 29 - Schedule Field Check Meeting
- 07:44, 12 April 2010 diff hist +88 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 07:44, 12 April 2010 diff hist +39 N File:Sample Letter to KCP&L Requesting Power - Preliminary Plans - Task 28.pdf Sample Letter to KCP&L requesting power
- 07:42, 12 April 2010 diff hist −44 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 07:41, 12 April 2010 diff hist +98 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 07:38, 12 April 2010 diff hist +60 N File:Exhibit G KCP&L Electrical Service Application.pdf KCP&L Commercial & Industrial Electrical Service Application
- 07:35, 12 April 2010 diff hist +91 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 07:29, 12 April 2010 diff hist +52 Phase II - Preliminary Design →Task No. 28 - Begin Field Check Plan Review
- 07:28, 12 April 2010 diff hist +8 Phase II - Preliminary Design →Task No. 27 - Prepare Preliminary Cash Flow Projection (update)
- 07:27, 12 April 2010 diff hist +11 Phase II - Preliminary Design →Task No. 27 - Prepare Preliminary Cash Flow Projection (update)
- 07:25, 12 April 2010 diff hist +188 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 07:22, 12 April 2010 diff hist +54 N File:Plugging packet.pdf KDHE's requirements for plugging abandoned water wells
- 07:18, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 07:18, 12 April 2010 diff hist +3 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 07:18, 12 April 2010 diff hist +78 N File:II-24f.pdf sample letter requesting a project be reviewed for nationwide permit coverage.
- 07:16, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 07:14, 12 April 2010 diff hist +213 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 07:06, 12 April 2010 diff hist 0 File:IV-2a.dot uploaded a new version of "File:IV-2a.dot": list of materials testing / geotechnical service companies.
- 07:05, 12 April 2010 diff hist +65 N File:KDOT Forms Instructions.pdf instructions on preparation of KDOT Forms 304, 308, 309 and 334.
- 07:05, 12 April 2010 diff hist +52 N File:II-24n.dot KDOT Form 334, Access Application Information Sheet.
- 07:05, 12 April 2010 diff hist +84 N File:II-24m.pdf KDOT Form 310, Highway Permit Agreement Attachments to Bridges and Other Structures.
- 07:05, 12 April 2010 diff hist +49 N File:II-24l.dot KDOT Form 309, Highway Permit for Highway Access.
- 07:05, 12 April 2010 diff hist +41 N File:II-24k.dot KDOT Form 308, Cased Utility Line Waiver.
- 07:05, 12 April 2010 diff hist +60 N File:II-24j.pdf KDOT Form 304, Highway Permit Agreement Use of Right of Way.
- 07:05, 12 April 2010 diff hist +65 N File:II-24f.dot listing of contact information and addresses for the ECA agencies
- 07:05, 12 April 2010 diff hist +54 N File:II-24d.pdf DWR application for permit for Obstruction in Streams.
- 07:05, 12 April 2010 diff hist +46 N File:II-24c.pdf FEMA's Procedures for "No Rise" Certifications
- 07:05, 12 April 2010 diff hist +54 N File:II-24a.pdf memo of the steps to be taken on Public Works projects
- 07:05, 12 April 2010 diff hist +27 N File:II-24b.pdf project schedule/checklist.
- 07:05, 12 April 2010 diff hist +159 N File:II-17.dot sample RFP letter to geotechnical firms, proposal format, summary of pay items (Attachment A), detailed description and description of services (Attachment B).
- 06:58, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 21 - Distribute Plans
- 06:57, 12 April 2010 diff hist +13 Phase II - Preliminary Design →Task No. 21 - Distribute Plans
- 06:52, 12 April 2010 diff hist +85 Phase II - Preliminary Design →Task No. 18 - Begin Title Report Process
- 06:48, 12 April 2010 diff hist +70 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:46, 12 April 2010 diff hist +8 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:45, 12 April 2010 diff hist +66 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:42, 12 April 2010 diff hist +102 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:40, 12 April 2010 diff hist +82 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:38, 12 April 2010 diff hist +12 Phase II - Preliminary Design →Task No. 16 - Begin Environmental Process
- 06:35, 12 April 2010 diff hist −69 Phase II - Preliminary Design →Task No. 25 - Submit Required Permit Applications
- 06:33, 12 April 2010 diff hist +49 Phase II - Preliminary Design →Task No. 24 - Schedule Second Utility Meeting
- 06:32, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 24 - Schedule Second Utility Meeting
- 06:32, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 22 - Distribute Plans for Field Check
- 06:31, 12 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Begin Title Report Process
- 06:30, 12 April 2010 diff hist +3 Phase II - Preliminary Design →Task No. 17 - Schedule First Public Information Meeting
- 06:28, 12 April 2010 diff hist +2 Phase II - Preliminary Design →Task No. 16 - Begin Environmental Process
- 06:28, 12 April 2010 diff hist +36 Phase II - Preliminary Design →Task No. 15 - Conduct Field Surveys
- 06:27, 12 April 2010 diff hist +70 Phase II - Preliminary Design →Task No. 14 - Agency Agreement (if Applicable)
- 06:25, 12 April 2010 diff hist +77 Phase II - Preliminary Design →Task No. 13
- 06:23, 12 April 2010 diff hist −1 Phase II - Preliminary Design →Task No. 34 - Prepare R/W and Easement Documents
- 06:22, 12 April 2010 diff hist +13,040 Phase II - Preliminary Design →Task No. 22 - Distribute Plans for Field Check
- 06:16, 12 April 2010 diff hist +2,798 Phase II - Preliminary Design →Task No. 18 - Begin Title Report Process
- 06:14, 12 April 2010 diff hist +5,379 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:13, 12 April 2010 diff hist +50 N File:II-16e.dot sample letter to land title companies not selected
- 06:13, 12 April 2010 diff hist +44 N File:II-16d.dot sample letter to selected land title company
- 06:13, 12 April 2010 diff hist +69 N File:II-16c.pdf sample location map with parcel numbers and a parcel ownership report
- 06:13, 12 April 2010 diff hist +28 N File:II-16b.dot sample land title RFP letter
- 06:13, 12 April 2010 diff hist +61 N File:II-16a.xlt list of land title companies to be considered in RFP requests
- 06:13, 12 April 2010 diff hist +21 N File:II-15c.dot public meeting agenda
- 06:13, 12 April 2010 diff hist +28 N File:II-15b.dot public meeting sign in sheet
- 06:13, 12 April 2010 diff hist +45 N File:II-15a.dot example Notice of Public Information Meeting.
- 06:13, 12 April 2010 diff hist +44 N File:II-15.dot example Invitation Letter to property owners
- 06:13, 12 April 2010 diff hist +69 N File:II-14.xlt spreadsheet KDOT uses in tracking Overland Park administered projects
- 06:13, 12 April 2010 diff hist +64 N File:II-9d.pdf Memo from JCW on existing brick manholes with new cone sections.
- 06:13, 12 April 2010 diff hist +65 N File:II-9c.pdf Designers Checklist for City Streets and Stormwater Improvements.
- 06:13, 12 April 2010 diff hist +72 N File:II-9b.pdf Public Works Department Bridge Asset Inventory Procedure (January 2007).
- 06:00, 12 April 2010 diff hist +33 N File:II-9a.dot list of bridge design information
- 16:41, 9 April 2010 diff hist +55 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 16:39, 9 April 2010 diff hist +67 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 16:38, 9 April 2010 diff hist +865 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 16:33, 9 April 2010 diff hist +4 Phase II - Preliminary Design →Task No. 9 - Schedule First Utility Meeting
- 16:32, 9 April 2010 diff hist +101 Phase II - Preliminary Design →Task No. 9 - Schedule First Utility Meeting
- 16:29, 9 April 2010 diff hist +52 N File:II-7n.pdf Service Territory Map Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +55 N File:II-7l.pdf Encroachment Guidelines. Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +54 N File:II-7k.pdf Right-Of -Way Agreement Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +92 N File:II-7j.xlt Payment invoice to JCW for reimbursement of relocation costs. Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +72 N File:II-7i.pdf Right-Of-Way Agreement, Project Checklist Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +70 N File:II-7h.pdf Right-Of-Way Agreement, Reference Sheet Category:Phase II Exhibits
- 16:29, 9 April 2010 diff hist +53 N File:II-7g.pdf Right-Of-Way Agreement Category:Phase II Exhibits
- 16:23, 9 April 2010 diff hist +83 Phase II - Preliminary Design →Task No. 9 - Schedule First Utility Meeting
- 16:20, 9 April 2010 diff hist +78 N File:II-7f.dot sample of utility coordination meeting minutes. Category:Phase II Exhibits
- 16:20, 9 April 2010 diff hist +53 N File:II-7e.dot meeting sign in sheet. Category:Phase II Exhibits
- 16:20, 9 April 2010 diff hist +78 N File:II-7d.dot sample agenda for Utility Coordination Meeting. Category:Phase II Exhibits
- 16:20, 9 April 2010 diff hist +89 N File:II-7b.dot sample invitation letter for Utility Coordination Meeting. Category:Phase II Exhibits
- 16:20, 9 April 2010 diff hist +80 N File:II-7a.dot copy of the City's Utility Relocation Guidelines. Category:Phase II Exhibits
- 16:20, 9 April 2010 diff hist +130 N File:II-9.dot list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.Category:Phase II Exhibits
- 14:43, 9 April 2010 diff hist +1 Phase II - Preliminary Design →Task No. 5 - Submit Project Description to Law Department
- 14:43, 9 April 2010 diff hist +26 Phase II - Preliminary Design →Task No. 5 - Submit Project Description to Law Department
- 14:42, 9 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 7 - Submit Cash Flow Projections (Engineering Cost)
- 14:41, 9 April 2010 diff hist +6 Phase II - Preliminary Design →Task No. 5 - Submit Project Description to Law Department
- 14:40, 9 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 14:40, 9 April 2010 diff hist +179 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 14:34, 9 April 2010 diff hist +35 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 14:30, 9 April 2010 diff hist +95 N File:II-3e(2).dot City’s standard Scope of Services for a Traffic Signal project.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +55 N File:II-6.xlt standard cash flow form. Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +56 N File:II-3-4o.xlt list of Consulting Firms. Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +77 N File:II-3n.dot sample letter to Consulting Firms not selected.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +72 N File:II-3m.dot sample letter to selected Consulting Firm.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +97 N File:II-3l.dot sample letter requesting interview of short list Consulting Firms. Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +65 N File:II-3k.xlt sample of a compiled Ranking Sheet.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +87 N File:II-3j.dot sample Interview Memo to Consultant Selection Committee. Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +106 N File:II-3i.xlt sample Ranking Sheet to be completed by the Consultant Selection Committee. Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +78 N File:II-3h.dot Ranking Memo to Consultant Selection Committee.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +68 N File:II-3g.dot sample RFP letter to Consulting Firms.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +96 N File:II-3f.xlt City’s standard fee schedule for engineering services agreement.Category:Phase II Exhibits
- 14:30, 9 April 2010 diff hist +96 N File:II-3e(1).dot City’s standard Scope of Services for a Street Lighting project.Category:Phase II Exhibits
- 11:01, 9 April 2010 diff hist 0 File:II-3-4b.dot
- 11:00, 9 April 2010 diff hist +1 File:II-3-4b(1).dot
- 11:00, 9 April 2010 diff hist +1 m File:II-3-4b(1).dot
- 10:59, 9 April 2010 diff hist +56 Main Page →Phases
- 10:57, 9 April 2010 diff hist +54 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 10:48, 9 April 2010 diff hist +1 Phase I - Vision →All Phase I Exhibits
- 10:47, 9 April 2010 diff hist +9 Phase I - Vision →All Phase I Exhibits
- 10:45, 9 April 2010 diff hist +31 File:II-3-4c.dot
- 10:44, 9 April 2010 diff hist +1 File:II-3-4b.dot
- 10:42, 9 April 2010 diff hist +17 N Category:Phase II Exhibits Created page with 'Phase II Exhibits' current
- 10:41, 9 April 2010 diff hist +49 N File:II-3-4c.dot Std. Consultant Agreement for non-design projects
- 10:41, 9 April 2010 diff hist +92 N File:II-3-4b(1).dot Std. Supplemental Agreement Professional Engineering Services Category:Phase II Exhibits
- 09:57, 9 April 2010 diff hist +30 File:I-11b.pdf
- 09:57, 9 April 2010 diff hist +30 File:I-11a.pdf
- 09:56, 9 April 2010 diff hist +30 File:I-10d.pdf
- 09:56, 9 April 2010 diff hist +30 File:I-10c.pdf
- 09:55, 9 April 2010 diff hist +30 File:I-10b.pdf
- 09:55, 9 April 2010 diff hist +30 File:I-10a.pdf
- 09:55, 9 April 2010 diff hist +30 File:I-1.pdf
- 09:54, 9 April 2010 diff hist +31 File:I-12.pdf
- 09:53, 9 April 2010 diff hist +30 File:1-2a.dot current
- 09:52, 9 April 2010 diff hist +27 N Category:Phase I Exhibits Created page with 'Exhibits for Phase I Vision' current
- 07:26, 9 April 2010 diff hist +49 Phase I - Vision →Task 27 - Submit City Request to KDOT to Administer Federal Funded Projects
- 07:24, 9 April 2010 diff hist −1 m Phase I - Vision →Task 21 - Receive HUD Approval
- 07:23, 9 April 2010 diff hist −1 m Phase I - Vision →Task 4 - Obtain City Council Approval-Preliminary Plans
- 07:23, 9 April 2010 diff hist +13 Phase I - Vision →Task 27 - Submit City Request to KDOT to Administer Federal Funded Projects
- 07:22, 9 April 2010 diff hist +12 Phase I - Vision →Task 26 - Receive Project Authorization from KDOT
- 07:22, 9 April 2010 diff hist +71 N File:I-14.pdf sample KDOT project authorization form with a typical project schedule.
- 07:21, 9 April 2010 diff hist +28 Phase I - Vision →Task 25 Submit KDOT Form 1302 for Project Request
- 07:18, 9 April 2010 diff hist +7 Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 07:18, 9 April 2010 diff hist +5 Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 07:18, 9 April 2010 diff hist +14 Phase I - Vision →Task 23 - Execute Local Project Agreement - City
- 07:13, 9 April 2010 diff hist 0 m Phase I - Vision →Task 23 Execute Local Project Agreement - SMAC
- 07:12, 9 April 2010 diff hist +28 Phase I - Vision →Task 23 Execute Local Project Agreement - SMAC
- 07:12, 9 April 2010 diff hist +64 N File:I-11c.pdf example of a previously executed SMAC Agreement for construction
- 07:11, 9 April 2010 diff hist +59 N File:I-11b.pdf example of a previously executed SMAC Agreement for design.
- 07:11, 9 April 2010 diff hist +15 Phase I - Vision →Task 23 - Execute Local Project Agreement - CARS
- 07:10, 9 April 2010 diff hist +48 N File:I-11a.pdf example of a previously executed CARS Agreement.
- 07:09, 9 April 2010 diff hist +84 Phase I - Vision →Task 22 - Submit CARS Five Year Plan to County
- 07:06, 9 April 2010 diff hist +165 N File:I-10d.pdf example of CARS packet with instructions for submitting CARS Five-Year program to the Board of County Commissioners. A new packet will be sent by CARS each January.
- 07:05, 9 April 2010 diff hist +60 N File:I-10c.pdf map of CARS eligible routes current as of Resolution 082-04.
- 07:05, 9 April 2010 diff hist +140 N File:I-10b.pdf copy of Resolutions 44-90, 058-94 and 082-04 which define the Major Collectors eligible for County's participation through the CARS program.
- 07:04, 9 April 2010 diff hist +168 N File:I-10a.pdf copy of CARS Program Policies and Administrative Procedures, adopted on March 22, 2001, and a copy of Resolution No. 019-01, which approved the Policies and Procedures.
- 07:03, 9 April 2010 diff hist +15 Phase I - Vision →Task 16-20 - Submit Application to HUD
- 07:01, 9 April 2010 diff hist +12 Phase I - Vision →Task 12 - Submit MARC Five Year Plan
- 07:00, 9 April 2010 diff hist +197 N File:I-12.pdf MARC's call for projects and TIP updates. It provides instructions on applying for 2009-2010 STP/BR Funding, instructions on updating the current TIP and instructions on adding projects to the TIP.
- 06:58, 9 April 2010 diff hist −1 Phase I - Vision →Task 5-11 - Obtain City Council Approval - CIP
- 06:57, 9 April 2010 diff hist +13 Phase I - Vision →Task 5-11 - Obtain City Council Approval - CIP
- 06:57, 9 April 2010 diff hist +51 Phase I - Vision →Task 5-11 - Obtain City Council Approval - CIP
- 06:55, 9 April 2010 diff hist +26 N File:I-5-11c.xlt CIP project addition form.
- 06:54, 9 April 2010 diff hist +25 N File:I-5-11b.xlt CIP project revision form
- 06:54, 9 April 2010 diff hist +35 File:I-5a.pdf
- 06:53, 9 April 2010 diff hist +26 N File:I-5a.pdf CIP project revision form.
- 06:51, 9 April 2010 diff hist +55 Phase I - Vision →Task 3 - Prepare SMAC Project Addition Study (Form)
- 06:49, 9 April 2010 diff hist +74 N File:I-3d.dot sample project addition request letter to the Stormwater Program Manager.
- 06:48, 9 April 2010 diff hist +92 N File:I-3c.pdf copy of the Johnson County, Administrative Procedures for the Stormwater Management Program.
- 06:47, 9 April 2010 diff hist +76 N File:I-3b.pdf copy of the Johnson County, Stormwater Management Advisory Council, By Laws.
- 06:46, 9 April 2010 diff hist +65 N File:I-3a.pdf copy of the Johnson County, Stormwater Management Program Policy.
- 06:43, 9 April 2010 diff hist +27 Phase I - Vision →Task 1 - Prepare Preliminary Plans/Cost Estimate
- 06:40, 9 April 2010 diff hist +14 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:40, 9 April 2010 diff hist +112 N File:I-2f.dot copy of the City’s petition form for IDs and informal petition forms for streetlights, drainage and sidewalks.
- 06:39, 9 April 2010 diff hist +14 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:38, 9 April 2010 diff hist +89 N File:I-2e.pdf copy of City Resolution 3326 establishing a policy of creating ID's for drainage projects
- 06:37, 9 April 2010 diff hist −32 m Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:37, 9 April 2010 diff hist +22 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:36, 9 April 2010 diff hist +28 N File:I-2d.pdf Copy of City Resolution 2395
- 06:35, 9 April 2010 diff hist −8 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:34, 9 April 2010 diff hist +9 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:30, 9 April 2010 diff hist 0 Template:Exhibit current
- 06:29, 9 April 2010 diff hist 0 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:26, 9 April 2010 diff hist +2 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:24, 9 April 2010 diff hist +22 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:23, 9 April 2010 diff hist +54 N File:I-1.pdf Sample Feasibility Report TC-4C Storm Drainage Project
- 06:18, 9 April 2010 diff hist +14 Introduction →Project Procedures Manual current
- 06:16, 9 April 2010 diff hist −14 Phase II - Preliminary Design
- 06:15, 9 April 2010 diff hist −2 Phase II - Preliminary Design →Task No. 6 - Prepare Project Schedule
- 06:15, 9 April 2010 diff hist −1 Phase II - Preliminary Design →Task No. 5 - Submit Project Description to Law Department
- 06:15, 9 April 2010 diff hist −11 Phase II - Preliminary Design →Task No. 3-4 - Hire Consultant
- 06:15, 9 April 2010 diff hist −1 Phase II - Preliminary Design →Task No. 2 - Decide if City Staff to Design
- 06:11, 9 April 2010 diff hist +7 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:10, 9 April 2010 diff hist +12 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:09, 9 April 2010 diff hist 0 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:08, 9 April 2010 diff hist −10 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:07, 9 April 2010 diff hist −19 Phase II - Preliminary Design →Task No. 11 - Design Criteria
- 06:06, 9 April 2010 diff hist −7 Phase II - Preliminary Design →Task No. 10 - Pre-Design Meeting
- 06:06, 9 April 2010 diff hist −4 Phase II - Preliminary Design →Task No. 9 - Schedule First Utility Meeting
- 06:05, 9 April 2010 diff hist −7 Phase I - Vision →Task 2 - Prepare Feasibility Report
- 06:04, 9 April 2010 diff hist −16 Phase VI - Retrospect →Task No. 5 - Update City Historical Records
- 06:03, 9 April 2010 diff hist 0 Phase VI - Retrospect →Task No. 3 - Conduct Post-Project Conference
- 06:03, 9 April 2010 diff hist +2 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 06:01, 9 April 2010 diff hist +98 N Flow Chart Phase VI Created page with '{{NavReturn |ReturnLink=Phase_VI_-_Retrospect |ReturnMsg=Return to Phase VI}} image:Phase6.gif' current
- 06:01, 9 April 2010 diff hist +19 N File:Phase6.gif Phase VI Flow Chart current
- 05:59, 9 April 2010 diff hist +32 N Flow Chart Phase V moved Flow Chart Phase V to Phase V Flow Chart: wrong format current
- 05:59, 9 April 2010 diff hist 0 m Phase V Flow Chart moved Flow Chart Phase V to Phase V Flow Chart: wrong format current
- 05:57, 9 April 2010 diff hist 0 Phase V - Construction →Flow Chart
- 05:56, 9 April 2010 diff hist 0 Phase VI - Retrospect →Flow Chart
- 05:55, 9 April 2010 diff hist 0 Phase VI - Retrospect →Checklist
- 05:55, 9 April 2010 diff hist +32 N Checklist Phase IV moved Checklist Phase IV to Phase VI Checklist: wrong format and number current
- 05:55, 9 April 2010 diff hist 0 m Phase VI Checklist moved Checklist Phase IV to Phase VI Checklist: wrong format and number
- 05:54, 9 April 2010 diff hist +13,894 N Phase VI Checklist Created page with '<P style="TEXT-ALIGN: center; MARGIN: 0pt 1px 0pt 0pt; FONT-FAMILY: Times New Roman,serif; FONT-SIZE: 10pt"><B><SPAN style="FONT-FAMILY: Arial,sans-serif; FONT-SIZE: 12pt">City o…'
- 05:52, 9 April 2010 diff hist +82 Phase VI - Retrospect →Task No. 1 - Procedures for Final Cost and Project Close Out
- 05:51, 9 April 2010 diff hist −84 Checklist Phase V
- 05:50, 9 April 2010 diff hist +23,383 N Checklist Phase V Created page with '<P style="TEXT-ALIGN: center; MARGIN: 0pt 1px 0pt 0pt; FONT-FAMILY: Times New Roman,serif; FONT-SIZE: 10pt"><B><SPAN style="FONT-FAMILY: Arial,sans-serif; FONT-SIZE: 12pt">City o…'
- 05:48, 9 April 2010 diff hist +98 N Phase V Flow Chart Created page with '{{NavReturn |ReturnLink=Phase_V_-_Construction |ReturnMsg=Return to Phase V}} image:Phase5.gif'
- 05:47, 9 April 2010 diff hist +18 N File:Phase5.gif Flow Chart Phase V current
- 05:47, 9 April 2010 diff hist +80 Phase V - Construction →Task No. 1 - Prepare for Temporary Financing
- 16:35, 8 April 2010 diff hist +104 N Phase IV Flow Chart Created page with '{{NavReturn |ReturnLink=Phase_IV_-_Pre-Construction |ReturnMsg=Return to Phase IV}} image:Phase4.gif' current
- 16:33, 8 April 2010 diff hist +19 N File:Phase4.gif Phase IV Flow Chart current
- 16:31, 8 April 2010 diff hist +19,280 N Phase IV Checklist Created page with '<P style="TEXT-ALIGN: center; MARGIN: 0pt 1px 0pt 0pt; FONT-FAMILY: Times New Roman,serif; FONT-SIZE: 10pt"><B><SPAN style="FONT-FAMILY: Arial,sans-serif; FONT-SIZE: 12pt">City o…'
- 16:29, 8 April 2010 diff hist +8 Phase IV - Pre-Construction →Introduction