Difference between revisions of "Revision History"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(Created page with '{| class="wikitable" border="2" !width="100" align="center"|Date !width="600"|Revision !width="100"|By |- |align="center"|4/5/2010 |Wiki was moved to the MediaWiki wiki |align="c…')
 
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Navbar}}
{| class="wikitable" border="2"
{| class="wikitable" border="2"
!width="100" align="center"|Date
!width="100" align="center"|Date
!width="600"|Revision
!width="600"|Revision
!width="100"|By
!width="100"|By
|-
|align="center"|5/1/2012
|Wiki software upgraded to 1.19
|align="center"|Keith Diehl
|-
|-
|align="center"|4/5/2010
|align="center"|4/5/2010
Line 8: Line 17:
|align="center"|MSR
|align="center"|MSR
|-
|-
|align="center"|8/26/2008
|Phase III - Final Design<br>
Task No. 7 - Submit Final Plans for Review Submittal<br>
Added link to the Maintenance Plan Review Process
|align="center"|JEA
|-
|align="center"|8/26/2008
|Phase II - Preliminary Design<br>
Task No. 22 - Distribute Plans for Field Check<br>
Added link to the Maintenance Plan Review Process
|align="center"|JEA
|-
|align="center"|8/6/2008
|Phase V - Construction<br>
Task No. 12 - On-Going Inspections<br>
Added Electrical Service Address Procedures and links.
|align="center"|JEA
|-
|align="center"|8/6/2008
|Phase II - Preliminary Design<br>
Task No. 28 - Begin Field Check Plan Review<br>
Added Electrical Service Address Procedures and links.
|align="center"|JEA
|-
|align="center"|7/15/2008
|Project Procedures Manual was moved to the MS Sharepoint Wiki.
|align="center"|JEA
|}

Latest revision as of 14:34, 27 October 2015


Home I-Vision II-Preliminary Design III-Final Design IV-Pre-Construction V-Construction VI-Retrospect
Date Revision By
5/1/2012 Wiki software upgraded to 1.19 Keith Diehl
4/5/2010 Wiki was moved to the MediaWiki wiki MSR