Difference between revisions of "Introduction"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(Created page with ' Project Procedures Manual Introduction October 10, 1997 This Project Procedures Manual provides relevant, pertinent and timely information concerning City of Overland Pa…')
 
Line 1: Line 1:


Project Procedures Manual
== Project Procedures Manual ==


 
'''Introduction'''
 
Introduction


October 10, 1997   
October 10, 1997   
Line 24: Line 22:


•      Phase VI - Retrospect
•      Phase VI - Retrospect




Within each phase is a phase description, flowchart, phase/task checklist, task descriptions, list of exhibits and exhibits.
Within each phase is a phase description, flowchart, phase/task checklist, task descriptions, list of exhibits and exhibits.


The flowcharts provide "Easy to Read" task titles per phase and are arranged in sequential order. The flowcharts have descriptive legends along the bottom of each sheet. Decision nodes (circles) signify optional tasks which may be applicable depending on the type of project.
The flowcharts provide "Easy to Read" task titles per phase and are arranged in sequential order. The flowcharts have descriptive legends along the bottom of each sheet. Decision nodes (circles) signify optional tasks which may be applicable depending on the type of project.


The checklists will permit Administrators and Project Managers to record the status of projects within their assigned responsibilities. Task Descriptions and references to exhibits are provided in the primary text of the manual. A list of exhibits follow each "Exhibit Tab" and the exhibits are identified according to the relevant phase and task (III-9).
The checklists will permit Administrators and Project Managers to record the status of projects within their assigned responsibilities. Task Descriptions and references to exhibits are provided in the primary text of the manual. A list of exhibits follow each "Exhibit Tab" and the exhibits are identified according to the relevant phase and task (III-9).


This manual shall be used as a guide to plan, administer, design and inspect all City projects. It is not intended to preclude or substitute for good engineering judgment and practices.
This manual shall be used as a guide to plan, administer, design and inspect all City projects. It is not intended to preclude or substitute for good engineering judgment and practices.


It is important that the assigned Public Works employee keep the manual updated as changes occur. The manual is to be placed in electronic format to provide easy access and up-do-date information for tracking projects.
It is important that the assigned Public Works employee keep the manual updated as changes occur. The manual is to be placed in electronic format to provide easy access and up-do-date information for tracking projects.


The Public Works staff acknowledges and appreciates the cooperation of the Finance, Legal, and Parks Departments for providing valuable input into the manual. It is our hope that the manual will enhance coordination between each of the departments. Staff would also like to acknowledge the work of the HNTB Corporation in preparing this manual and especially the efforts of HNTB employees, Joe Brand, P.E. and Dennis Garrett, P.E.
The Public Works staff acknowledges and appreciates the cooperation of the Finance, Legal, and Parks Departments for providing valuable input into the manual. It is our hope that the manual will enhance coordination between each of the departments. Staff would also like to acknowledge the work of the HNTB Corporation in preparing this manual and especially the efforts of HNTB employees, Joe Brand, P.E. and Dennis Garrett, P.E.

Revision as of 09:08, 5 April 2010

Project Procedures Manual

Introduction

October 10, 1997


This Project Procedures Manual provides relevant, pertinent and timely information concerning City of Overland Park projects. It identifies and describes the possible phases/tasks associated with various types of City projects, from project conception, through design, construction and project close-out. Specifically, the manual is separated into six phases as follows:


• Phase I - Vision

• Phase II - Preliminary Design

• Phase III - Final Design

• Phase IV - Pre-Construction

• Phase V - Construction

• Phase VI - Retrospect


Within each phase is a phase description, flowchart, phase/task checklist, task descriptions, list of exhibits and exhibits.

The flowcharts provide "Easy to Read" task titles per phase and are arranged in sequential order. The flowcharts have descriptive legends along the bottom of each sheet. Decision nodes (circles) signify optional tasks which may be applicable depending on the type of project.

The checklists will permit Administrators and Project Managers to record the status of projects within their assigned responsibilities. Task Descriptions and references to exhibits are provided in the primary text of the manual. A list of exhibits follow each "Exhibit Tab" and the exhibits are identified according to the relevant phase and task (III-9).

This manual shall be used as a guide to plan, administer, design and inspect all City projects. It is not intended to preclude or substitute for good engineering judgment and practices.

It is important that the assigned Public Works employee keep the manual updated as changes occur. The manual is to be placed in electronic format to provide easy access and up-do-date information for tracking projects.

The Public Works staff acknowledges and appreciates the cooperation of the Finance, Legal, and Parks Departments for providing valuable input into the manual. It is our hope that the manual will enhance coordination between each of the departments. Staff would also like to acknowledge the work of the HNTB Corporation in preparing this manual and especially the efforts of HNTB employees, Joe Brand, P.E. and Dennis Garrett, P.E.

I want to especially thank Amy Rosewicz, P.E. for her effort in coordinating the preparation of this manual.

Robert D. Lowry, P.E.

Director of Public Works


P.S. This manual is being submitted to KDOT as a prerequisite for the City's Public Works staff to administer federally funded projects. Those items unique to KDOT projects are clearly identified by bold text in the manual.