Difference between revisions of "File:V-13f.xlt"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.)
(No difference)

Revision as of 07:23, 15 April 2010

spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current15:42, 3 June 2014 (45 KB)Joe Archer (talk | contribs)Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
08:12, 19 April 2011 (33 KB)Joe Archer (talk | contribs)Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
07:23, 15 April 2010 (35 KB)Mike Ross (talk | contribs)spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.

There are no pages that use this file.