Difference between revisions of "City of Overland Park Standard Specifications - 2020"
Jump to navigation
Jump to search
Joe Archer (talk | contribs) |
Joe Archer (talk | contribs) |
||
Line 2: | Line 2: | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
| style="text-align: center; width: 90pt;" | '''SECTION NUMBER''' | |||
| style="text-align: center;" | '''TITLE''' | |||
|- | |- | ||
| [[Media:100.pdf|'''100''']] || GENERAL REQUIREMENTS | | style="text-align: center;" | [[Media:100.pdf|'''100''']] || GENERAL REQUIREMENTS | ||
|- | |- | ||
| [[Media:101.pdf|'''101]] || MAINTENANCE BOND | | style="text-align: center;" | [[Media:101.pdf|'''101]] || MAINTENANCE BOND | ||
|- | |- | ||
| [[Media:102.pdf|'''102''']] || CONSTRUCTION VIDEO AND PHOTOGRAPHY | | style="text-align: center;" | [[Media:102.pdf|'''102''']] || CONSTRUCTION VIDEO AND PHOTOGRAPHY | ||
|- | |- | ||
| [[Media:103.pdf|'''103''']] || PRE CONSTRUCTION SURVEY | | style="text-align: center;" | [[Media:103.pdf|'''103''']] || PRE CONSTRUCTION SURVEY | ||
|- | |- | ||
| [[Media:104.pdf|'''104''']] || FORCE ACCOUNT | | style="text-align: center;" | [[Media:104.pdf|'''104''']] || FORCE ACCOUNT | ||
|- | |- | ||
| [[Media:201.pdf|'''201''']] || CLEARING AND GRUBBING | | style="text-align: center;" | [[Media:201.pdf|'''201''']] || CLEARING AND GRUBBING | ||
|- | |- | ||
| [[Media:202.pdf|'''202''']] || REMOVAL OF EXISTING STRUCTURES | | style="text-align: center;" | [[Media:202.pdf|'''202''']] || REMOVAL OF EXISTING STRUCTURES | ||
|- | |- | ||
| [[Media:203.pdf|'''203''']] || TREE REMOVAL | | style="text-align: center;" | [[Media:203.pdf|'''203''']] || TREE REMOVAL | ||
|- | |- | ||
| [[Media:204.pdf|'''204''']] || EXCAVATION AND BACKFILL FOR STRUCTURES | | style="text-align: center;" | [[Media:204.pdf|'''204''']] || EXCAVATION AND BACKFILL FOR STRUCTURES | ||
|- | |- | ||
| [[Media:205.pdf|'''205''']] || EXCAVATION | | style="text-align: center;" | [[Media:205.pdf|'''205''']] || EXCAVATION | ||
|- | |- | ||
| [[Media:206.pdf|'''206''']] || EMBANKMENT (CONTRACTOR FURNISHED) | | style="text-align: center;" | [[Media:206.pdf|'''206''']] || EMBANKMENT (CONTRACTOR FURNISHED) | ||
|- | |- | ||
| [[Media:207.pdf|'''207''']] || COMPACTION OF EARTHWORK | | style="text-align: center;" | [[Media:207.pdf|'''207''']] || COMPACTION OF EARTHWORK | ||
|- | |- | ||
| [[Media:208.pdf|'''208''']] || LINEAR GRADING AND SUBGRADE STABILIZATION | | style="text-align: center;" | [[Media:208.pdf|'''208''']] || LINEAR GRADING AND SUBGRADE STABILIZATION | ||
|- | |- | ||
| [[Media:209.pdf|'''209''']] || ROCK EXCAVATION AND BLASTING | | style="text-align: center;" | [[Media:209.pdf|'''209''']] || ROCK EXCAVATION AND BLASTING | ||
|- | |- | ||
| [[Media:211.pdf|'''211''']] || GRADING OF SWALES | | style="text-align: center;" | [[Media:211.pdf|'''211''']] || GRADING OF SWALES | ||
|- | |- | ||
| [[Media:303.pdf|'''303''']] || FLY ASH TREATED SUBGRADE | | style="text-align: center;" | [[Media:303.pdf|'''303''']] || FLY ASH TREATED SUBGRADE | ||
|- | |- | ||
| [[Media:304.pdf|'''304''']] || AGGREGATE BASE COURSE (OP SPECIAL) | | style="text-align: center;" | [[Media:304.pdf|'''304''']] || AGGREGATE BASE COURSE (OP SPECIAL) | ||
|- | |- | ||
| [[Media:305.pdf|'''305''']] || AGGREGATE BASE AND AGGREGATE SHOULDERS | | style="text-align: center;" | [[Media:305.pdf|'''305''']] || AGGREGATE BASE AND AGGREGATE SHOULDERS | ||
|- | |- | ||
| [[Media:309.pdf|'''309''']] || FOUNDATION STABILIZATION | | style="text-align: center;" | [[Media:309.pdf|'''309''']] || FOUNDATION STABILIZATION | ||
|- | |- | ||
| [[Media:315.pdf|'''315''']] || TYPE I STREET REPAIR | | style="text-align: center;" | [[Media:315.pdf|'''315''']] || TYPE I STREET REPAIR | ||
|- | |- | ||
| [[Media:316.pdf|'''316''']] || TYPE II STREET REPAIR | | style="text-align: center;" | [[Media:316.pdf|'''316''']] || TYPE II STREET REPAIR | ||
|- | |- | ||
| [[Media:401.pdf|'''401''']] || CONCRETE CONSTRUCTION | | style="text-align: center;" | [[Media:401.pdf|'''401''']] || CONCRETE CONSTRUCTION | ||
|- | |- | ||
| [[Media:502.pdf|'''502''']] || PORTLAND CEMENT CONCRETE PAVEMENT | | style="text-align: center;" | [[Media:502.pdf|'''502''']] || PORTLAND CEMENT CONCRETE PAVEMENT | ||
|- | |- | ||
| [[Media:503.pdf|'''503''']] || CONCRETE COLLAR | | style="text-align: center;" | [[Media:503.pdf|'''503''']] || CONCRETE COLLAR | ||
|- | |- | ||
| [[Media:600.pdf|'''600''']] || OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE | | style="text-align: center;" | [[Media:600.pdf|'''600''']] || OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE | ||
|- | |- | ||
| [[Media:608.pdf|'''608''']] || BITUMINOUS SURFACE TREATMENT | | style="text-align: center;" | [[Media:608.pdf|'''608''']] || BITUMINOUS SURFACE TREATMENT | ||
|- | |- | ||
| [[Media:612.pdf|'''612''']] || METHODS OF MILLING OPERATIONS | | style="text-align: center;" | [[Media:612.pdf|'''612''']] || METHODS OF MILLING OPERATIONS | ||
|- | |- | ||
| [[Media:613.pdf|'''613''']] || ULTRATHIN BONDED ASPHALT SURFACE (UBAS) | | style="text-align: center;" | [[Media:613.pdf|'''613''']] || ULTRATHIN BONDED ASPHALT SURFACE (UBAS) | ||
|- | |- | ||
| [[Media:614.pdf|'''614''']] || ASPHALTIC CONCRETE OVERLAY OPERATIONS | | style="text-align: center;" | [[Media:614.pdf|'''614''']] || ASPHALTIC CONCRETE OVERLAY OPERATIONS | ||
|- | |- | ||
| [[Media:615.pdf|'''615''']] || STREET SWEEPING | | style="text-align: center;" | [[Media:615.pdf|'''615''']] || STREET SWEEPING | ||
|- | |- | ||
| [[Media:615.pdf|'''616''']] || POTHOLE REPAIR | | style="text-align: center;" | [[Media:615.pdf|'''616''']] || POTHOLE REPAIR | ||
|- | |- | ||
| [[Media:617.pdf|'''617''']] || METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED) | | style="text-align: center;" | [[Media:617.pdf|'''617''']] || METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED) | ||
|- | |- | ||
| [[Media:618.pdf|'''618''']] || ASPHALTIC BASE REPAIR | | style="text-align: center;" | [[Media:618.pdf|'''618''']] || ASPHALTIC BASE REPAIR | ||
|- | |- | ||
| [[Media:619.pdf|'''619''']] || ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING | | style="text-align: center;" | [[Media:619.pdf|'''619''']] || ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING | ||
|- | |- | ||
| [[Media:620.pdf|'''620''']] || ASPHALT SIDEWALK CONSTRUCTION | | style="text-align: center;" | [[Media:620.pdf|'''620''']] || ASPHALT SIDEWALK CONSTRUCTION | ||
|- | |- | ||
| [[Media:703.pdf|'''703''']] || DRILLED SHAFTS | | style="text-align: center;" | [[Media:703.pdf|'''703''']] || DRILLED SHAFTS | ||
|- | |- | ||
| [[Media:704.pdf|'''704''']] || STEEL PILES | | style="text-align: center;" | [[Media:704.pdf|'''704''']] || STEEL PILES | ||
|- | |- | ||
| [[Media:711.pdf|'''711''']] || REINFORCING STEEL | | style="text-align: center;" | [[Media:711.pdf|'''711''']] || REINFORCING STEEL | ||
|- | |- | ||
| [[Media:715.pdf|'''715''']] || PRESTRESSED CONCRETE BEAMS | | style="text-align: center;" | [[Media:715.pdf|'''715''']] || PRESTRESSED CONCRETE BEAMS | ||
|- | |- | ||
| [[Media:721.pdf|'''721''']] || HANDRAIL | | style="text-align: center;" | [[Media:721.pdf|'''721''']] || HANDRAIL | ||
|- | |- | ||
| [[Media:724.pdf|'''724''']] || BRIDGE BACKWALL PROTECTION SYSTEM | | style="text-align: center;" | [[Media:724.pdf|'''724''']] || BRIDGE BACKWALL PROTECTION SYSTEM | ||
|- | |- | ||
| [[Media:725.pdf|'''725''']] || ABUTMENT DRAINAGE SYSTEMS | | style="text-align: center;" | [[Media:725.pdf|'''725''']] || ABUTMENT DRAINAGE SYSTEMS | ||
|- | |- | ||
| [[Media:726.pdf|'''726''']] || CONCRETE MASONRY COATING | | style="text-align: center;" | [[Media:726.pdf|'''726''']] || CONCRETE MASONRY COATING | ||
|- | |- | ||
| [[Media:735.pdf|'''735''']] || PRECAST REINFORCED CONCRETE BOX CULVERT | | style="text-align: center;" | [[Media:735.pdf|'''735''']] || PRECAST REINFORCED CONCRETE BOX CULVERT | ||
|- | |- | ||
| [[Media:745.pdf|'''745''']] || BRIDGE NUMBER PLAQUE | | style="text-align: center;" | [[Media:745.pdf|'''745''']] || BRIDGE NUMBER PLAQUE | ||
|- | |- | ||
| [[Media:746.pdf|'''746''']] || BRIDGE DECK CONSTRUCTION | | style="text-align: center;" | [[Media:746.pdf|'''746''']] || BRIDGE DECK CONSTRUCTION | ||
|- | |- | ||
| [[Media:802.pdf|'''802''']] || CONTRACTOR CONSTRUCTION STAKING | | style="text-align: center;" | [[Media:802.pdf|'''802''']] || CONTRACTOR CONSTRUCTION STAKING | ||
|- | |- | ||
| [[Media:805.pdf|'''805''']] || TRAFFIC CONTROL | | style="text-align: center;" | [[Media:805.pdf|'''805''']] || TRAFFIC CONTROL | ||
|- | |- | ||
| [[Media:809.pdf|'''809''']] || CONCRETE SAFETY BARRIER | | style="text-align: center;" | [[Media:809.pdf|'''809''']] || CONCRETE SAFETY BARRIER | ||
|- | |- | ||
| [[Media:815.pdf|'''815''']] || STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES | | style="text-align: center;" | [[Media:815.pdf|'''815''']] || STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES | ||
|- | |- | ||
| [[Media:816.pdf|'''816''']] || ADJUSTMENT OF MANHOLE AND VALVES | | style="text-align: center;" | [[Media:816.pdf|'''816''']] || ADJUSTMENT OF MANHOLE AND VALVES | ||
|- | |- | ||
| [[Media:817.pdf|'''817''']] || STORM SEWERS | | style="text-align: center;" | [[Media:817.pdf|'''817''']] || STORM SEWERS | ||
|- | |- | ||
| [[Media:822.pdf|'''822''']] || PIPE UNDERDRAIN | | style="text-align: center;" | [[Media:822.pdf|'''822''']] || PIPE UNDERDRAIN | ||
|- | |- | ||
| [[Media:824.pdf|'''824''']] || CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION | | style="text-align: center;" | [[Media:824.pdf|'''824''']] || CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION | ||
|- | |- | ||
| [[Media:825.pdf|'''825''']] || CONCRETE CURB CONSTRUCTION | | style="text-align: center;" | [[Media:825.pdf|'''825''']] || CONCRETE CURB CONSTRUCTION | ||
|- | |- | ||
| [[Media:827.pdf|'''827''']] || GUARDRAIL, STEEL PLATE (GALVANIZED) | | style="text-align: center;" | [[Media:827.pdf|'''827''']] || GUARDRAIL, STEEL PLATE (GALVANIZED) | ||
|- | |- | ||
| [[Media:828.pdf|'''828''']] || FENCING | | style="text-align: center;" | [[Media:828.pdf|'''828''']] || FENCING | ||
|- | |- | ||
| [[Media:829.pdf|'''829''']] || STONE RIPRAP | | style="text-align: center;" | [[Media:829.pdf|'''829''']] || STONE RIPRAP | ||
|- | |- | ||
| [[Media:831.pdf|'''831''']] || CONCRETE DITCH LINING | | style="text-align: center;" | [[Media:831.pdf|'''831''']] || CONCRETE DITCH LINING | ||
|- | |- | ||
| [[Media:833.pdf|'''833''']] || CONCRETE PAVEMENT PATCHING | | style="text-align: center;" | [[Media:833.pdf|'''833''']] || CONCRETE PAVEMENT PATCHING | ||
|- | |- | ||
| [[Media:835.pdf|'''835''']] || RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP | | style="text-align: center;" | [[Media:835.pdf|'''835''']] || RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP | ||
|- | |- | ||
| [[Media:836.pdf|'''836''']] || DRIVEWAYS | | style="text-align: center;" | [[Media:836.pdf|'''836''']] || DRIVEWAYS | ||
|- | |- | ||
| [[Media:840.pdf|'''840''']] || TEMPORARY SURFACING MATERIAL | | style="text-align: center;" | [[Media:840.pdf|'''840''']] || TEMPORARY SURFACING MATERIAL | ||
|- | |- | ||
| [[Media:843.pdf|'''843''']] || FLOWABLE FILL | | style="text-align: center;" | [[Media:843.pdf|'''843''']] || FLOWABLE FILL | ||
|- | |- | ||
| [[Media:847.pdf|'''847''']] || MAILBOX ADJUSTMENTS | | style="text-align: center;" | [[Media:847.pdf|'''847''']] || MAILBOX ADJUSTMENTS | ||
|- | |- | ||
| [[Media:850.pdf|'''850''']] || GEOTEXTILE | | style="text-align: center;" | [[Media:850.pdf|'''850''']] || GEOTEXTILE | ||
|- | |- | ||
| [[Media:855.pdf|'''855''']] || CONCRETE PAVER STONES | | style="text-align: center;" | [[Media:855.pdf|'''855''']] || CONCRETE PAVER STONES | ||
|- | |- | ||
| [[Media:856.pdf|'''856''']] || BRICK PAVERS | | style="text-align: center;" | [[Media:856.pdf|'''856''']] || BRICK PAVERS | ||
|- | |- | ||
| [[Media:860.pdf|'''860''']] || CONCRETE MEDIAN NOSE | | style="text-align: center;" | [[Media:860.pdf|'''860''']] || CONCRETE MEDIAN NOSE | ||
|- | |- | ||
| [[Media:861.pdf|'''861''']] || SAWING | | style="text-align: center;" | [[Media:861.pdf|'''861''']] || SAWING | ||
|- | |- | ||
| [[Media:863.pdf|'''863''']] || SERVICE WATER LINE RELOCATION | | style="text-align: center;" | [[Media:863.pdf|'''863''']] || SERVICE WATER LINE RELOCATION | ||
|- | |- | ||
| [[Media:864.pdf|'''864''']] || STORMWATER TREATMENT UNITS | | style="text-align: center;" | [[Media:864.pdf|'''864''']] || STORMWATER TREATMENT UNITS | ||
|- | |- | ||
| [[Media:865.pdf|'''865''']] || SANITARY SEWERS | | style="text-align: center;" | [[Media:865.pdf|'''865''']] || SANITARY SEWERS | ||
|- | |- | ||
| [[Media:866.pdf|'''866''']] || SANITARY SEWER ENCASEMENT | | style="text-align: center;" | [[Media:866.pdf|'''866''']] || SANITARY SEWER ENCASEMENT | ||
|- | |- | ||
| [[Media:868.pdf|'''868''']] || PROJECT SIGN | | style="text-align: center;" | [[Media:868.pdf|'''868''']] || PROJECT SIGN | ||
|- | |- | ||
| [[Media:869.pdf|'''869''']] || LAND CORNER MONUMENT BOX | | style="text-align: center;" | [[Media:869.pdf|'''869''']] || LAND CORNER MONUMENT BOX | ||
|- | |- | ||
| [[Media:870.pdf|'''870''']] || BENCHMARK MONUMENT | | style="text-align: center;" | [[Media:870.pdf|'''870''']] || BENCHMARK MONUMENT | ||
|- | |- | ||
| [[Media:871.pdf|'''871''']] || PROPERTY CORNERS | | style="text-align: center;" | [[Media:871.pdf|'''871''']] || PROPERTY CORNERS | ||
|- | |- | ||
| [[Media:878.pdf|'''878''']] || CRACK SEALING | | style="text-align: center;" | [[Media:878.pdf|'''878''']] || CRACK SEALING | ||
|- | |- | ||
| [[Media:879.pdf|'''879''']] || PEDESTRIAN PUSH BUTTON MODIFICATION | | style="text-align: center;" | [[Media:879.pdf|'''879''']] || PEDESTRIAN PUSH BUTTON MODIFICATION | ||
|- | |- | ||
| [[Media:880.pdf|'''880''']] || GUARDRAIL MODIFICATIONS | | style="text-align: center;" | [[Media:880.pdf|'''880''']] || GUARDRAIL MODIFICATIONS | ||
|- | |- | ||
| [[Media:882.pdf|'''882''']] || INTEGRAL SIDEWALK RETAINING WALL | | style="text-align: center;" | [[Media:882.pdf|'''882''']] || INTEGRAL SIDEWALK RETAINING WALL | ||
|- | |- | ||
| [[Media:883.pdf|'''883''']] || WALL FORM LINER TREATMENT | | style="text-align: center;" | [[Media:883.pdf|'''883''']] || WALL FORM LINER TREATMENT | ||
|- | |- | ||
| [[Media:884.pdf|'''884''']] || CONCRETE PATCHING | | style="text-align: center;" | [[Media:884.pdf|'''884''']] || CONCRETE PATCHING | ||
|- | |- | ||
| [[Media:885.pdf|'''885''']] || RESIDENT TRANSPORTATION SERVICE | | style="text-align: center;" | [[Media:885.pdf|'''885''']] || RESIDENT TRANSPORTATION SERVICE | ||
|- | |- | ||
| [[Media:901.pdf|'''901''']] || STORMWATER POLLUTION MANAGEMENT | | style="text-align: center;" | [[Media:901.pdf|'''901''']] || STORMWATER POLLUTION MANAGEMENT | ||
|- | |- | ||
| [[Media:902.pdf|'''902''']] || TEMPORARY EROSION AND POLLUTION CONTROL | | style="text-align: center;" | [[Media:902.pdf|'''902''']] || TEMPORARY EROSION AND POLLUTION CONTROL | ||
|- | |- | ||
| [[Media:904.pdf|'''904''']] || SEEDING | | style="text-align: center;" | [[Media:904.pdf|'''904''']] || SEEDING | ||
|- | |- | ||
| [[Media:906.pdf|'''906''']] || TOPSOIL | | style="text-align: center;" | [[Media:906.pdf|'''906''']] || TOPSOIL | ||
|- | |- | ||
| [[Media:907.pdf|'''907''']] || SODDING | | style="text-align: center;" | [[Media:907.pdf|'''907''']] || SODDING | ||
|- | |- | ||
| [[Media:908.pdf|'''908''']] || TREE AND SHRUB PLANTING AND MAINTENANCE | | style="text-align: center;" | [[Media:908.pdf|'''908''']] || TREE AND SHRUB PLANTING AND MAINTENANCE | ||
|- | |- | ||
| [[Media:914.pdf|'''914''']] || LAWN SPRINKLER SYSTEM | | style="text-align: center;" | [[Media:914.pdf|'''914''']] || LAWN SPRINKLER SYSTEM | ||
|- | |- | ||
| [[Media:917.pdf|'''917''']] || PRUNING | | style="text-align: center;" | [[Media:917.pdf|'''917''']] || PRUNING | ||
|- | |- | ||
| [[Media:1000.pdf|'''1000''']] || STREETLIGHTING INSTALLATION | | style="text-align: center;" | [[Media:1000.pdf|'''1000''']] || STREETLIGHTING INSTALLATION | ||
|- | |- | ||
| [[Media:1020.pdf|'''1020''']] || TRAFFIC SIGNAL INSTALLATION | | style="text-align: center;" | [[Media:1020.pdf|'''1020''']] || TRAFFIC SIGNAL INSTALLATION | ||
|- | |- | ||
| [[Media:1021.pdf|'''1021''']] || LOOP DETECTOR | | style="text-align: center;" | [[Media:1021.pdf|'''1021''']] || LOOP DETECTOR | ||
|- | |- | ||
| [[Media:1040.pdf|'''1040''']] || FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION | | style="text-align: center;" | [[Media:1040.pdf|'''1040''']] || FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION | ||
|- | |- | ||
| [[Media:1060.pdf|'''1060''']] || PERMANENT TRAFFIC CONTROL SIGNING | | style="text-align: center;" | [[Media:1060.pdf|'''1060''']] || PERMANENT TRAFFIC CONTROL SIGNING | ||
|- | |- | ||
| [[Media:1061.pdf|'''1061''']] || ILLUMINATED OVERHEAD STREET NAME SIGNS | | style="text-align: center;" | [[Media:1061.pdf|'''1061''']] || ILLUMINATED OVERHEAD STREET NAME SIGNS | ||
|- | |- | ||
| [[Media:1062.pdf|'''1062''']] || ARTERIAL DYNAMIC MESSAGE SIGNS | | style="text-align: center;" | [[Media:1062.pdf|'''1062''']] || ARTERIAL DYNAMIC MESSAGE SIGNS | ||
|- | |- | ||
| [[Media:1063.pdf|'''1063''']] || RECTANGULAR RAPID FLASHING BEACON INSTALLATION | | style="text-align: center;" | [[Media:1063.pdf|'''1063''']] || RECTANGULAR RAPID FLASHING BEACON INSTALLATION | ||
|- | |- | ||
| [[Media:1064.pdf|'''1064''']] || TUBULAR DELINEATOR | | style="text-align: center;" | [[Media:1064.pdf|'''1064''']] || TUBULAR DELINEATOR | ||
|- | |- | ||
| [[Media:1080.pdf|'''1080''']] || TEMPORARY PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1080.pdf|'''1080''']] || TEMPORARY PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1081.pdf|'''1081''']] || INTERIM PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1081.pdf|'''1081''']] || INTERIM PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1082.pdf|'''1082''']] || COLD PLASTIC PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1082.pdf|'''1082''']] || COLD PLASTIC PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1083.pdf|'''1083''']] || METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1083.pdf|'''1083''']] || METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1084.pdf|'''1084''']] || PATTERNED COLD PLASTIC PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1084.pdf|'''1084''']] || PATTERNED COLD PLASTIC PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1085.pdf|'''1085''']] || PREFORMED THERMOPLASTIC PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1085.pdf|'''1085''']] || PREFORMED THERMOPLASTIC PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1086.pdf|'''1086''']] || THERMOPLASTIC PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1086.pdf|'''1086''']] || THERMOPLASTIC PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1087.pdf|'''1087''']] || URETHANE ACRYLATE PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1087.pdf|'''1087''']] || URETHANE ACRYLATE PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1088.pdf|'''1088''']] || WATERBORNE PAINT PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1088.pdf|'''1088''']] || WATERBORNE PAINT PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1089.pdf|'''1089''']] || INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS | | style="text-align: center;" | [[Media:1089.pdf|'''1089''']] || INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS | ||
|- | |- | ||
| [[Media:1104.pdf|'''1104''']] || AB-3 OVERLAND PARK MODIFIED | | style="text-align: center;" | [[Media:1104.pdf|'''1104''']] || AB-3 OVERLAND PARK MODIFIED | ||
|} | |} |
Revision as of 15:50, 9 April 2020
SECTION NUMBER | TITLE |
100 | GENERAL REQUIREMENTS |
101 | MAINTENANCE BOND |
102 | CONSTRUCTION VIDEO AND PHOTOGRAPHY |
103 | PRE CONSTRUCTION SURVEY |
104 | FORCE ACCOUNT |
201 | CLEARING AND GRUBBING |
202 | REMOVAL OF EXISTING STRUCTURES |
203 | TREE REMOVAL |
204 | EXCAVATION AND BACKFILL FOR STRUCTURES |
205 | EXCAVATION |
206 | EMBANKMENT (CONTRACTOR FURNISHED) |
207 | COMPACTION OF EARTHWORK |
208 | LINEAR GRADING AND SUBGRADE STABILIZATION |
209 | ROCK EXCAVATION AND BLASTING |
211 | GRADING OF SWALES |
303 | FLY ASH TREATED SUBGRADE |
304 | AGGREGATE BASE COURSE (OP SPECIAL) |
305 | AGGREGATE BASE AND AGGREGATE SHOULDERS |
309 | FOUNDATION STABILIZATION |
315 | TYPE I STREET REPAIR |
316 | TYPE II STREET REPAIR |
401 | CONCRETE CONSTRUCTION |
502 | PORTLAND CEMENT CONCRETE PAVEMENT |
503 | CONCRETE COLLAR |
600 | OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE |
608 | BITUMINOUS SURFACE TREATMENT |
612 | METHODS OF MILLING OPERATIONS |
613 | ULTRATHIN BONDED ASPHALT SURFACE (UBAS) |
614 | ASPHALTIC CONCRETE OVERLAY OPERATIONS |
615 | STREET SWEEPING |
616 | POTHOLE REPAIR |
617 | METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED) |
618 | ASPHALTIC BASE REPAIR |
619 | ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING |
620 | ASPHALT SIDEWALK CONSTRUCTION |
703 | DRILLED SHAFTS |
704 | STEEL PILES |
711 | REINFORCING STEEL |
715 | PRESTRESSED CONCRETE BEAMS |
721 | HANDRAIL |
724 | BRIDGE BACKWALL PROTECTION SYSTEM |
725 | ABUTMENT DRAINAGE SYSTEMS |
726 | CONCRETE MASONRY COATING |
735 | PRECAST REINFORCED CONCRETE BOX CULVERT |
745 | BRIDGE NUMBER PLAQUE |
746 | BRIDGE DECK CONSTRUCTION |
802 | CONTRACTOR CONSTRUCTION STAKING |
805 | TRAFFIC CONTROL |
809 | CONCRETE SAFETY BARRIER |
815 | STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES |
816 | ADJUSTMENT OF MANHOLE AND VALVES |
817 | STORM SEWERS |
822 | PIPE UNDERDRAIN |
824 | CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION |
825 | CONCRETE CURB CONSTRUCTION |
827 | GUARDRAIL, STEEL PLATE (GALVANIZED) |
828 | FENCING |
829 | STONE RIPRAP |
831 | CONCRETE DITCH LINING |
833 | CONCRETE PAVEMENT PATCHING |
835 | RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP |
836 | DRIVEWAYS |
840 | TEMPORARY SURFACING MATERIAL |
843 | FLOWABLE FILL |
847 | MAILBOX ADJUSTMENTS |
850 | GEOTEXTILE |
855 | CONCRETE PAVER STONES |
856 | BRICK PAVERS |
860 | CONCRETE MEDIAN NOSE |
861 | SAWING |
863 | SERVICE WATER LINE RELOCATION |
864 | STORMWATER TREATMENT UNITS |
865 | SANITARY SEWERS |
866 | SANITARY SEWER ENCASEMENT |
868 | PROJECT SIGN |
869 | LAND CORNER MONUMENT BOX |
870 | BENCHMARK MONUMENT |
871 | PROPERTY CORNERS |
878 | CRACK SEALING |
879 | PEDESTRIAN PUSH BUTTON MODIFICATION |
880 | GUARDRAIL MODIFICATIONS |
882 | INTEGRAL SIDEWALK RETAINING WALL |
883 | WALL FORM LINER TREATMENT |
884 | CONCRETE PATCHING |
885 | RESIDENT TRANSPORTATION SERVICE |
901 | STORMWATER POLLUTION MANAGEMENT |
902 | TEMPORARY EROSION AND POLLUTION CONTROL |
904 | SEEDING |
906 | TOPSOIL |
907 | SODDING |
908 | TREE AND SHRUB PLANTING AND MAINTENANCE |
914 | LAWN SPRINKLER SYSTEM |
917 | PRUNING |
1000 | STREETLIGHTING INSTALLATION |
1020 | TRAFFIC SIGNAL INSTALLATION |
1021 | LOOP DETECTOR |
1040 | FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION |
1060 | PERMANENT TRAFFIC CONTROL SIGNING |
1061 | ILLUMINATED OVERHEAD STREET NAME SIGNS |
1062 | ARTERIAL DYNAMIC MESSAGE SIGNS |
1063 | RECTANGULAR RAPID FLASHING BEACON INSTALLATION |
1064 | TUBULAR DELINEATOR |
1080 | TEMPORARY PAVEMENT MARKINGS |
1081 | INTERIM PAVEMENT MARKINGS |
1082 | COLD PLASTIC PAVEMENT MARKINGS |
1083 | METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS |
1084 | PATTERNED COLD PLASTIC PAVEMENT MARKINGS |
1085 | PREFORMED THERMOPLASTIC PAVEMENT MARKINGS |
1086 | THERMOPLASTIC PAVEMENT MARKINGS |
1087 | URETHANE ACRYLATE PAVEMENT MARKINGS |
1088 | WATERBORNE PAINT PAVEMENT MARKINGS |
1089 | INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS |
1104 | AB-3 OVERLAND PARK MODIFIED |