Difference between revisions of "City of Overland Park Standard Specifications - 2020"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
 
(24 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''<big>This page is under construction. The below specification documents are under review and are not approved for use at this time. 4/21/2020</big>
 
'''
{| class="wikitable sortable" style="width: 1000px;"
{| class="wikitable sortable"
|- style="vertical-align: top;"
|-
! scope="column"style="width: 16%;" | SECTION NUMBER
! SECTION NUMBER
! scope="column"style="width: 170%;" | TITLE
! TITLE
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec10.pdf|'''10''']]
| style="text-align: center;" | [[Media:Sec100.pdf|'''100''']] || GENERAL REQUIREMENTS
| GENERAL CONDITIONS (PRIVATE DEVELOPMENT)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec101.pdf|'''101]] || MAINTENANCE BOND
! scope="row" | [[Media:Sec11.pdf|'''11''']]
|-
| BASIC REQUIREMENTS (PRIVATE DEVELOPMENT)
| style="text-align: center;" | [[Media:Sec102.pdf|'''102''']] || CONSTRUCTION VIDEO AND PHOTOGRAPHY
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec12.pdf|'''12''']]
| style="text-align: center;" | [[Media:Sec103.pdf|'''103''']] || PRE CONSTRUCTION SURVEY
| ABBREVIATIONS AND DEFINITIONS (PRIVATE DEVELOPMENT)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec104.pdf|'''104''']] || FORCE ACCOUNT
! scope="row" | [[Media:Sec13.pdf|'''13''']]
|-
| SHOP DRAWING SUBMITTAL REQUIREMENTS (PRIVATE DEVELOPMENT)
| style="text-align: center;" | [[Media:Sec201.pdf|'''201''']] || CLEARING AND GRUBBING
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec14.pdf|'''14''']]
| style="text-align: center;" | [[Media:Sec202.pdf|'''202''']] || REMOVAL OF EXISTING STRUCTURES
| CERTIFICATION, TESTING AND INSPECTION SERVICES (PRIVATE DEVELOPMENT)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec203.pdf|'''203''']] || TREE REMOVAL
! scope="row" | [[Media:Sec15.pdf|'''15''']]
|-
| TRAFFIC CONTROL (PRIVATE DEVELOPMENT)
| style="text-align: center;" | [[Media:Sec204.pdf|'''204''']] || EXCAVATION AND BACKFILL FOR STRUCTURES
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec16.pdf|'''16''']]
| style="text-align: center;" | [[Media:Sec205.pdf|'''205''']] || EXCAVATION
| USE AND OCCUPANCY OF THE PUBLIC RIGHT OF WAY (PRIVATE DEVELOPMENT)
[[Media:Sec205.1.pdf|'''205.1''']] - EXCAVATION (6/16/2020)
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec17.pdf|'''17''']]
| style="text-align: center;" | [[Media:Sec206.pdf|'''206''']] || EMBANKMENT (CONTRACTOR FURNISHED)
| ROCK EXCAVATION AND BLASTING (PRIVATE DEVELOPMENT)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | || [[Media:Sec206.1.pdf|'''206.1''']] - EMBANKMENT (CONTRACTOR FURNISHED)
! scope="row" | [[Media:Sec100.pdf|'''100''']]
|-
| GENERAL REQUIREMENTS
| style="text-align: center;" | [[Media:Sec207.pdf|'''207''']] || COMPACTION OF EARTHWORK
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec101.pdf|'''101]]
| style="text-align: center;" | [[Media:Sec208.pdf|'''208''']] || LINEAR GRADING AND SUBGRADE STABILIZATION
| MAINTENANCE BOND
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec209.pdf|'''209''']] || ROCK EXCAVATION AND BLASTING
! scope="row" | [[Media:Sec102.pdf|'''102''']]
|-
| CONSTRUCTION VIDEO AND PHOTOGRAPHY
| style="text-align: center;" | [[Media:Sec211.pdf|'''211''']] || GRADING OF SWALES
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec103.pdf|'''103''']]
| style="text-align: center;" | [[Media:Sec303.pdf|'''303''']] || FLY ASH TREATED SUBGRADE
| PRE CONSTRUCTION SURVEY
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec304.pdf|'''304''']] || AGGREGATE BASE COURSE (OP SPECIAL)
! scope="row" | [[Media:Sec104.pdf|'''104''']]
|-
| FORCE ACCOUNT
| style="text-align: center;" | [[Media:Sec305.pdf|'''305''']] || AGGREGATE BASE AND AGGREGATE SHOULDERS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec201.pdf|'''201''']]
| style="text-align: center;" | [[Media:Sec309.pdf|'''309''']] || FOUNDATION STABILIZATION
| CLEARING AND GRUBBING
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec315.pdf|'''315''']] || TYPE I STREET REPAIR
! scope="row" | [[Media:Sec202.pdf|'''202''']]
|-
| REMOVAL OF EXISTING STRUCTURES
| style="text-align: center;" | [[Media:Sec316.pdf|'''316''']] || TYPE II STREET REPAIR
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec203.pdf|'''203''']]
| style="text-align: center;" | [[Media:Sec401.pdf|'''401''']] || CONCRETE CONSTRUCTION
| TREE REMOVAL
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec502.pdf|'''502''']] || PORTLAND CEMENT CONCRETE PAVEMENT
! scope="row" | [[Media:Sec204.pdf|'''204''']]
|-
| EXCAVATION AND BACKFILL FOR STRUCTURES
| style="text-align: center;" | [[Media:Sec503.pdf|'''503''']] || CONCRETE COLLAR
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec205.pdf|'''205''']]
| style="text-align: center;" | [[Media:Sec600.pdf|'''600''']] || OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE
| EXCAVATION
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec608.pdf|'''608''']] || BITUMINOUS SURFACE TREATMENT
! scope="row" | [[Media:Sec207.pdf|'''207''']]
|-
| EMBANKMENT AND COMPACTION OF EARTHWORK
| style="text-align: center;" | [[Media:Sec612.pdf|'''612''']] || METHODS OF MILLING OPERATIONS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec208.pdf|'''208''']]
| style="text-align: center;" | [[Media:Sec613.pdf|'''613''']] || ULTRATHIN BONDED ASPHALT SURFACE (UBAS)
| LINEAR GRADING AND SUBGRADE STABILIZATION
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec614.pdf|'''614''']] || ASPHALTIC CONCRETE OVERLAY OPERATIONS
! scope="row" | [[Media:Sec209.pdf|'''209''']]
|-
| ROCK EXCAVATION AND BLASTING
| style="text-align: center;" | [[Media:Sec615.pdf|'''615''']] || STREET SWEEPING
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec211.pdf|'''211''']]
| style="text-align: center;" | [[Media:Sec616.pdf|'''616''']] || POTHOLE REPAIR
| GRADING OF SWALES
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec617.pdf|'''617''']] || METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED)
! scope="row" | [[Media:Sec301.pdf|'''301''']]
|-
| SUBGRADE CONSTRUCTION
| style="text-align: center;" | [[Media:Sec618.pdf|'''618''']] || ASPHALTIC BASE REPAIR
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec304.pdf|'''304''']]
| style="text-align: center;" | [[Media:Sec619.pdf|'''619''']] || ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING
| AGGREGATE BASE COURSE (OP SPECIAL)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec620.pdf|'''620''']] || ASPHALT SIDEWALK CONSTRUCTION
! scope="row" | [[Media:Sec305.pdf|'''305''']]
|-
| AGGREGATE BASE AND AGGREGATE SHOULDERS
| style="text-align: center;" | [[Media:Sec703.pdf|'''703''']] || DRILLED SHAFTS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec309.pdf|'''309''']]
| style="text-align: center;" | [[Media:Sec704.pdf|'''704''']] || STEEL PILES
| FOUNDATION STABILIZATION
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec711.pdf|'''711''']] || REINFORCING STEEL
! scope="row" | [[Media:Sec315.pdf|'''315''']]
|-
| TYPE I STREET REPAIR
| style="text-align: center;" | [[Media:Sec715.pdf|'''715''']] || PRESTRESSED CONCRETE BEAMS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec316.pdf|'''316''']]
| style="text-align: center;" | [[Media:Sec721.pdf|'''721''']] || HANDRAIL
| TYPE II STREET REPAIR
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec724.pdf|'''724''']] || BRIDGE BACKWALL PROTECTION SYSTEM
! scope="row" | [[Media:Sec401.pdf|'''401''']]
|-
| CONCRETE CONSTRUCTION
| style="text-align: center;" | [[Media:Sec725.pdf|'''725''']] || ABUTMENT DRAINAGE SYSTEMS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec502.pdf|'''502''']]
| style="text-align: center;" | [[Media:Sec726.pdf|'''726''']] || CONCRETE MASONRY COATING
| PORTLAND CEMENT CONCRETE PAVEMENT
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec735.pdf|'''735''']] || PRECAST REINFORCED CONCRETE BOX CULVERT
! scope="row" | [[Media:Sec503.pdf|'''503''']]
|-
| CONCRETE COLLAR
| style="text-align: center;" | [[Media:Sec745.pdf|'''745''']] || BRIDGE NUMBER PLAQUE
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec600.pdf|'''600''']]
| style="text-align: center;" | [[Media:Sec746.pdf|'''746''']] || BRIDGE DECK CONSTRUCTION
| OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec802.pdf|'''802''']] || CONTRACTOR CONSTRUCTION STAKING
! scope="row" | [[Media:Sec608.pdf|'''608''']]
|-
| BITUMINOUS SURFACE TREATMENT
| style="text-align: center;" | [[Media:Sec805.pdf|'''805''']] || TRAFFIC CONTROL
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec612.pdf|'''612''']]
| style="text-align: center;" | [[Media:Sec809.pdf|'''809''']] || CONCRETE SAFETY BARRIER
| METHODS OF MILLING OPERATIONS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec815.pdf|'''815''']] || STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES
! scope="row" | [[Media:Sec613.pdf|'''613''']]
|-
| ULTRATHIN BONDED ASPHALT SURFACE (UBAS)
| style="text-align: center;" | [[Media:Sec816.pdf|'''816''']] || ADJUSTMENT OF MANHOLE AND VALVES
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec614.pdf|'''614''']]
| style="text-align: center;" | [[Media:Sec817.pdf|'''817''']] || STORM SEWERS
| ASPHALTIC CONCRETE OVERLAY OPERATIONS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec820.pdf|'''820''']] || SLOPE DRAIN
! scope="row" | [[Media:Sec615.pdf|'''615''']]
|-
| STREET SWEEPING
| style="text-align: center;" | [[Media:Sec822.pdf|'''822''']] || PIPE UNDERDRAIN
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec616.pdf|'''616''']]
| style="text-align: center;" | [[Media:Sec824.pdf|'''824''']] || CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION
| POTHOLE REPAIR
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec825.pdf|'''825''']] || CONCRETE CURB CONSTRUCTION
! scope="row" | [[Media:Sec617.pdf|'''617''']]
|-
| METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED)
| style="text-align: center;" | [[Media:Sec827.pdf|'''827''']] || GUARDRAIL, STEEL PLATE (GALVANIZED)
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec618.pdf|'''618''']]
| style="text-align: center;" | [[Media:Sec828.pdf|'''828''']] || FENCING
| ASPHALTIC BASE REPAIR
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec829.pdf|'''829''']] || STONE RIPRAP
! scope="row" | [[Media:Sec619.pdf|'''619''']]
|-
| ASPHALTIC PATCHING / PARTIAL DEPTH PATCHING
| style="text-align: center;" | [[Media:Sec831.pdf|'''831''']] || CONCRETE DITCH LINING
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec620.pdf|'''620''']]
| style="text-align: center;" | [[Media:Sec833.pdf|'''833''']] || CONCRETE PAVEMENT PATCHING
| ASPHALT SIDEWALK CONSTRUCTION
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec835.pdf|'''835''']] || RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP
! scope="row" | [[Media:Sec703.pdf|'''703''']]
|-
| DRILLED SHAFTS
| style="text-align: center;" | [[Media:Sec836.pdf|'''836''']] || DRIVEWAYS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec704.pdf|'''704''']]
| style="text-align: center;" | [[Media:Sec840.pdf|'''840''']] || TEMPORARY SURFACING MATERIAL
| STEEL PILES
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec843.pdf|'''843''']] || FLOWABLE FILL
! scope="row" | [[Media:Sec711.pdf|'''711''']]
|-
| REINFORCING STEEL
| style="text-align: center;" | [[Media:Sec847.pdf|'''847''']] || MAILBOX ADJUSTMENTS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec715.pdf|'''715''']]
| style="text-align: center;" | [[Media:Sec850.pdf|'''850''']] || GEOTEXTILE
| PRESTRESSED CONCRETE BEAMS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec855.pdf|'''855''']] || CONCRETE PAVER STONES
! scope="row" | [[Media:Sec721.pdf|'''721''']]
|-
| HANDRAIL
| style="text-align: center;" | [[Media:Sec856.pdf|'''856''']] || BRICK PAVERS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec724.pdf|'''724''']]
| style="text-align: center;" | [[Media:Sec860.pdf|'''860''']] || CONCRETE MEDIAN NOSE
| BRIDGE BACKWALL PROTECTION SYSTEM
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec861.pdf|'''861''']] || SAWING
! scope="row" | [[Media:Sec725.pdf|'''725''']]
|-
| ABUTMENT DRAINAGE SYSTEMS
| style="text-align: center;" | [[Media:Sec863.pdf|'''863''']] || SERVICE WATER LINE RELOCATION
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec726.pdf|'''726''']]
| style="text-align: center;" | [[Media:Sec864.pdf|'''864''']] || STORMWATER TREATMENT UNITS
| CONCRETE MASONRY COATING
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec865.pdf|'''865''']] || SANITARY SEWERS
! scope="row" | [[Media:Sec735.pdf|'''735''']]
|-
| PRECAST REINFORCED CONCRETE BOX CULVERT
| style="text-align: center;" | [[Media:Sec866.pdf|'''866''']] || SANITARY SEWER ENCASEMENT
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec745.pdf|'''745''']]
| style="text-align: center;" | [[Media:Sec868.pdf|'''868''']] || PROJECT SIGN
| BRIDGE NUMBER PLAQUE
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec869.pdf|'''869''']] || LAND CORNER MONUMENT BOX
! scope="row" | [[Media:Sec746.pdf|'''746''']]
|-
| BRIDGE DECK CONSTRUCTION
| style="text-align: center;" | [[Media:Sec870.pdf|'''870''']] || BENCHMARK MONUMENT
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec802.pdf|'''802''']]
| style="text-align: center;" | [[Media:Sec871.pdf|'''871''']] || PROPERTY CORNERS
| CONTRACTOR CONSTRUCTION STAKING
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec878.pdf|'''878''']] || CRACK SEALING
! scope="row" | [[Media:Sec805.pdf|'''805''']]
|-
| TRAFFIC CONTROL
| style="text-align: center;" | [[Media:Sec879.pdf|'''879''']] || PEDESTRIAN PUSH BUTTON MODIFICATION
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec809.pdf|'''809''']]
| style="text-align: center;" | [[Media:Sec880.pdf|'''880''']] || GUARDRAIL MODIFICATIONS
| CONCRETE SAFETY BARRIER
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec882.pdf|'''882''']] || INTEGRAL SIDEWALK RETAINING WALL
! scope="row" | [[Media:Sec815.pdf|'''815''']]
|-
| STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES
| style="text-align: center;" | [[Media:Sec883.pdf|'''883''']] || WALL FORM LINER TREATMENT
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec816.pdf|'''816''']]
| style="text-align: center;" | [[Media:Sec884.pdf|'''884''']] || CONCRETE PATCHING
| ADJUSTMENT OF MANHOLE AND VALVES
|-
[[Media:Sec816-R01.pdf|'''20-0816-R01''']] ADJUSTMENT OF MANHOLE AND VALVES (Effective 11-18-2020)
| style="text-align: center;" | [[Media:Sec885.pdf|'''885''']] || RESIDENT TRANSPORTATION SERVICE
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec817.pdf|'''817''']]
| style="text-align: center;" | [[Media:Sec901.pdf|'''901''']] || STORMWATER POLLUTION MANAGEMENT
| STORM SEWERS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec902.pdf|'''902''']] || TEMPORARY EROSION AND POLLUTION CONTROL
! scope="row" | [[Media:Sec818.pdf|'''818''']]
|-
| HDPE STORM SEWERS (PRIVATE)
| style="text-align: center;" | [[Media:Sec904.pdf|'''904''']] || SEEDING
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec820.pdf|'''820''']]
| style="text-align: center;" | [[Media:Sec906.pdf|'''906''']] || TOPSOIL
| SLOPE DRAIN
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec907.pdf|'''907''']] || SODDING
! scope="row" | [[Media:Sec822.pdf|'''822''']]
|-
| PIPE UNDERDRAIN
| style="text-align: center;" | [[Media:Sec908.pdf|'''908''']] || TREE AND SHRUB PLANTING AND MAINTENANCE
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec824.pdf|'''824''']]
| style="text-align: center;" | [[Media:Sec914.pdf|'''914''']] || LAWN SPRINKLER SYSTEM
| CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec917.pdf|'''917''']] || PRUNING
! scope="row" | [[Media:Sec825.pdf|'''825''']]
|-
| CONCRETE CURB CONSTRUCTION
| style="text-align: center;" | [[Media:Sec1000.pdf|'''1000''']] || STREETLIGHTING INSTALLATION
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec827.pdf|'''827''']]
| style="text-align: center;" | [[Media:Sec1020.pdf|'''1020''']] || TRAFFIC SIGNAL INSTALLATION
| GUARDRAIL, STEEL PLATE (GALVANIZED)
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1021.pdf|'''1021''']] || LOOP DETECTOR
! scope="row" | [[Media:Sec828.pdf|'''828''']]
|-
| FENCING
| style="text-align: center;" | [[Media:Sec1040.pdf|'''1040''']] || FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec829.pdf|'''829''']]
| style="text-align: center;" | [[Media:Sec1060.pdf|'''1060''']] || PERMANENT TRAFFIC CONTROL SIGNING
| STONE RIPRAP
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1061.pdf|'''1061''']] || ILLUMINATED OVERHEAD STREET NAME SIGNS
! scope="row" | [[Media:Sec831.pdf|'''831''']]
|-
| CONCRETE DITCH LINING
| style="text-align: center;" | [[Media:Sec1062.pdf|'''1062''']] || ARTERIAL DYNAMIC MESSAGE SIGNS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec833.pdf|'''833''']]
| style="text-align: center;" | [[Media:Sec1063.pdf|'''1063''']] || RECTANGULAR RAPID FLASHING BEACON INSTALLATION
| CONCRETE PAVEMENT PATCHING
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1064.pdf|'''1064''']] || TUBULAR DELINEATOR
! scope="row" | [[Media:Sec835.pdf|'''835''']]
|-
| RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP
| style="text-align: center;" | [[Media:Sec1080.pdf|'''1080''']] || TEMPORARY PAVEMENT MARKINGS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec836.pdf|'''836''']]
| style="text-align: center;" | [[Media:Sec1081.pdf|'''1081''']] || INTERIM PAVEMENT MARKINGS
| DRIVEWAYS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1082.pdf|'''1082''']] || COLD PLASTIC PAVEMENT MARKINGS
! scope="row" | [[Media:Sec837.pdf|'''837''']]
|-
| PRIVATE DRIVES AND PARKING AREAS OUTSIDE OF PUBLIC RIGHT-OF-WAY (PRIVATE DEVELOPMENT)
| style="text-align: center;" | [[Media:Sec1083.pdf|'''1083''']] || METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec840.pdf|'''840''']]
| style="text-align: center;" | [[Media:Sec1084.pdf|'''1084''']] || PATTERNED COLD PLASTIC PAVEMENT MARKINGS
| TEMPORARY SURFACING MATERIAL
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1085.pdf|'''1085''']] || PREFORMED THERMOPLASTIC PAVEMENT MARKINGS
! scope="row" | [[Media:Sec843.pdf|'''843''']]
|-
| FLOWABLE FILL
| style="text-align: center;" | [[Media:Sec1086.pdf|'''1086''']] || THERMOPLASTIC PAVEMENT MARKINGS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec847.pdf|'''847''']]
| style="text-align: center;" | [[Media:Sec1087.pdf|'''1087''']] || URETHANE ACRYLATE PAVEMENT MARKINGS
| MAILBOX ADJUSTMENTS
|-
|- style="vertical-align: top;"
| style="text-align: center;" | [[Media:Sec1088.pdf|'''1088''']] || WATERBORNE PAINT PAVEMENT MARKINGS
! scope="row" | [[Media:Sec850.pdf|'''850''']]
|-
| GEOTEXTILE
| style="text-align: center;" | [[Media:Sec1089.pdf|'''1089''']] || INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS
|- style="vertical-align: top;"
|-
! scope="row" | [[Media:Sec855.pdf|'''855''']]
| style="text-align: center;" | [[Media:Sec1104.pdf|'''1104''']] || AB-3 OVERLAND PARK MODIFIED
| CONCRETE PAVER STONES
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec856.pdf|'''856''']]
| BRICK PAVERS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec860.pdf|'''860''']]
| CONCRETE MEDIAN NOSE
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec861.pdf|'''861''']]
| SAWING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec863.pdf|'''863''']]
| SERVICE WATER LINE RELOCATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec864.pdf|'''864''']]
| STORMWATER TREATMENT UNITS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec865.pdf|'''865''']]
| SANITARY SEWERS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec866.pdf|'''866''']]
| SANITARY SEWER ENCASEMENT
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec868.pdf|'''868''']]
| PROJECT SIGN
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec869.pdf|'''869''']]
| LAND CORNER MONUMENT BOX
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec870.pdf|'''870''']]
| BENCHMARK MONUMENT
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec871.pdf|'''871''']]
| PROPERTY CORNERS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec878.pdf|'''878''']]
| CRACK SEALING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec879.pdf|'''879''']]
| PEDESTRIAN PUSH BUTTON MODIFICATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec880.pdf|'''880''']]
| GUARDRAIL MODIFICATIONS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec882.pdf|'''882''']]
| INTEGRAL SIDEWALK RETAINING WALL
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec883.pdf|'''883''']]
| WALL FORM LINER TREATMENT
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec885.pdf|'''885''']]
| RESIDENT TRANSPORTATION SERVICE
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec886.pdf|'''886''']]
| PRIVATE DRAINAGE SYSTEM CONNECTION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec901.pdf|'''901''']]
| STORMWATER POLLUTION MANAGEMENT
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec902.pdf|'''902''']]
| TEMPORARY EROSION AND POLLUTION CONTROL
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec904.pdf|'''904''']]
| SEEDING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec906.pdf|'''906''']]
| TOPSOIL
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec907.pdf|'''907''']]
| SODDING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec908.pdf|'''908''']]
| TREE AND SHRUB PLANTING AND MAINTENANCE
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec914.pdf|'''914''']]
| LAWN SPRINKLER SYSTEM
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec915.pdf|'''915''']]
| LAWN SPRINKLER SYSTEM REPAIR
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec917.pdf|'''917''']]
| PRUNING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1000.pdf|'''1000''']]
| STREETLIGHTING INSTALLATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1020.pdf|'''1020''']]
| TRAFFIC SIGNAL INSTALLATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1021.pdf|'''1021''']]
| LOOP DETECTOR
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1040.pdf|'''1040''']]
| FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1060.pdf|'''1060''']]
| PERMANENT TRAFFIC CONTROL SIGNING
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1061.pdf|'''1061''']]
| ILLUMINATED OVERHEAD STREET NAME SIGNS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1062.pdf|'''1062''']]
| ARTERIAL DYNAMIC MESSAGE SIGNS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1063.pdf|'''1063''']]
| RECTANGULAR RAPID FLASHING BEACON INSTALLATION
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1064.pdf|'''1064''']]
| TUBULAR DELINEATOR
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1080.pdf|'''1080''']]
| TEMPORARY PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1081.pdf|'''1081''']]
| INTERIM PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1082.pdf|'''1082''']]
| COLD PLASTIC PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1083.pdf|'''1083''']]
| METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1084.pdf|'''1084''']]
| PATTERNED COLD PLASTIC PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1085.pdf|'''1085''']]
| PREFORMED THERMOPLASTIC PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1086.pdf|'''1086''']]
| THERMOPLASTIC PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1087.pdf|'''1087''']]
| URETHANE ACRYLATE PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1088.pdf|'''1088''']]
| WATERBORNE PAINT PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1089.pdf|'''1089''']]
| INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS
|- style="vertical-align: top;"
! scope="row" | [[Media:Sec1104.pdf|'''1104''']]
| AB-3 OVERLAND PARK MODIFIED
|}
|}

Latest revision as of 12:32, 25 November 2020

SECTION NUMBER TITLE
10 GENERAL CONDITIONS (PRIVATE DEVELOPMENT)
11 BASIC REQUIREMENTS (PRIVATE DEVELOPMENT)
12 ABBREVIATIONS AND DEFINITIONS (PRIVATE DEVELOPMENT)
13 SHOP DRAWING SUBMITTAL REQUIREMENTS (PRIVATE DEVELOPMENT)
14 CERTIFICATION, TESTING AND INSPECTION SERVICES (PRIVATE DEVELOPMENT)
15 TRAFFIC CONTROL (PRIVATE DEVELOPMENT)
16 USE AND OCCUPANCY OF THE PUBLIC RIGHT OF WAY (PRIVATE DEVELOPMENT)
17 ROCK EXCAVATION AND BLASTING (PRIVATE DEVELOPMENT)
100 GENERAL REQUIREMENTS
101 MAINTENANCE BOND
102 CONSTRUCTION VIDEO AND PHOTOGRAPHY
103 PRE CONSTRUCTION SURVEY
104 FORCE ACCOUNT
201 CLEARING AND GRUBBING
202 REMOVAL OF EXISTING STRUCTURES
203 TREE REMOVAL
204 EXCAVATION AND BACKFILL FOR STRUCTURES
205 EXCAVATION
207 EMBANKMENT AND COMPACTION OF EARTHWORK
208 LINEAR GRADING AND SUBGRADE STABILIZATION
209 ROCK EXCAVATION AND BLASTING
211 GRADING OF SWALES
301 SUBGRADE CONSTRUCTION
304 AGGREGATE BASE COURSE (OP SPECIAL)
305 AGGREGATE BASE AND AGGREGATE SHOULDERS
309 FOUNDATION STABILIZATION
315 TYPE I STREET REPAIR
316 TYPE II STREET REPAIR
401 CONCRETE CONSTRUCTION
502 PORTLAND CEMENT CONCRETE PAVEMENT
503 CONCRETE COLLAR
600 OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE
608 BITUMINOUS SURFACE TREATMENT
612 METHODS OF MILLING OPERATIONS
613 ULTRATHIN BONDED ASPHALT SURFACE (UBAS)
614 ASPHALTIC CONCRETE OVERLAY OPERATIONS
615 STREET SWEEPING
616 POTHOLE REPAIR
617 METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED)
618 ASPHALTIC BASE REPAIR
619 ASPHALTIC PATCHING / PARTIAL DEPTH PATCHING
620 ASPHALT SIDEWALK CONSTRUCTION
703 DRILLED SHAFTS
704 STEEL PILES
711 REINFORCING STEEL
715 PRESTRESSED CONCRETE BEAMS
721 HANDRAIL
724 BRIDGE BACKWALL PROTECTION SYSTEM
725 ABUTMENT DRAINAGE SYSTEMS
726 CONCRETE MASONRY COATING
735 PRECAST REINFORCED CONCRETE BOX CULVERT
745 BRIDGE NUMBER PLAQUE
746 BRIDGE DECK CONSTRUCTION
802 CONTRACTOR CONSTRUCTION STAKING
805 TRAFFIC CONTROL
809 CONCRETE SAFETY BARRIER
815 STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES
816 ADJUSTMENT OF MANHOLE AND VALVES

20-0816-R01 ADJUSTMENT OF MANHOLE AND VALVES (Effective 11-18-2020)

817 STORM SEWERS
818 HDPE STORM SEWERS (PRIVATE)
820 SLOPE DRAIN
822 PIPE UNDERDRAIN
824 CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION
825 CONCRETE CURB CONSTRUCTION
827 GUARDRAIL, STEEL PLATE (GALVANIZED)
828 FENCING
829 STONE RIPRAP
831 CONCRETE DITCH LINING
833 CONCRETE PAVEMENT PATCHING
835 RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP
836 DRIVEWAYS
837 PRIVATE DRIVES AND PARKING AREAS OUTSIDE OF PUBLIC RIGHT-OF-WAY (PRIVATE DEVELOPMENT)
840 TEMPORARY SURFACING MATERIAL
843 FLOWABLE FILL
847 MAILBOX ADJUSTMENTS
850 GEOTEXTILE
855 CONCRETE PAVER STONES
856 BRICK PAVERS
860 CONCRETE MEDIAN NOSE
861 SAWING
863 SERVICE WATER LINE RELOCATION
864 STORMWATER TREATMENT UNITS
865 SANITARY SEWERS
866 SANITARY SEWER ENCASEMENT
868 PROJECT SIGN
869 LAND CORNER MONUMENT BOX
870 BENCHMARK MONUMENT
871 PROPERTY CORNERS
878 CRACK SEALING
879 PEDESTRIAN PUSH BUTTON MODIFICATION
880 GUARDRAIL MODIFICATIONS
882 INTEGRAL SIDEWALK RETAINING WALL
883 WALL FORM LINER TREATMENT
885 RESIDENT TRANSPORTATION SERVICE
886 PRIVATE DRAINAGE SYSTEM CONNECTION
901 STORMWATER POLLUTION MANAGEMENT
902 TEMPORARY EROSION AND POLLUTION CONTROL
904 SEEDING
906 TOPSOIL
907 SODDING
908 TREE AND SHRUB PLANTING AND MAINTENANCE
914 LAWN SPRINKLER SYSTEM
915 LAWN SPRINKLER SYSTEM REPAIR
917 PRUNING
1000 STREETLIGHTING INSTALLATION
1020 TRAFFIC SIGNAL INSTALLATION
1021 LOOP DETECTOR
1040 FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION
1060 PERMANENT TRAFFIC CONTROL SIGNING
1061 ILLUMINATED OVERHEAD STREET NAME SIGNS
1062 ARTERIAL DYNAMIC MESSAGE SIGNS
1063 RECTANGULAR RAPID FLASHING BEACON INSTALLATION
1064 TUBULAR DELINEATOR
1080 TEMPORARY PAVEMENT MARKINGS
1081 INTERIM PAVEMENT MARKINGS
1082 COLD PLASTIC PAVEMENT MARKINGS
1083 METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS
1084 PATTERNED COLD PLASTIC PAVEMENT MARKINGS
1085 PREFORMED THERMOPLASTIC PAVEMENT MARKINGS
1086 THERMOPLASTIC PAVEMENT MARKINGS
1087 URETHANE ACRYLATE PAVEMENT MARKINGS
1088 WATERBORNE PAINT PAVEMENT MARKINGS
1089 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS
1104 AB-3 OVERLAND PARK MODIFIED