Difference between revisions of "Approved Materials - Bridge Items"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
Line 6: Line 6:


== Bridge Backwall Protection System ==
== Bridge Backwall Protection System ==
{{Specification|SPEC=Overland Park Specification: Bridge Backwall Protection System<br>refers to<br>[http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/1708.pdf KDOT Section 1708]}}
{{Specification|SPEC=Overland Park Specification: Bridge Backwall Protection System<br>refers to[http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/1708.pdf KDOT Section 1708]}}
*This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-33-0.pdf PQL-33].
*This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-33-0.pdf PQL-33].

Revision as of 09:26, 13 February 2017

Return to Preapproved Materials

Abutment Strip Drain

Applicable Specification:

Overland Park Specification: Abutment Strip Drain
refers to KDOT Section 1706
  • This item is covered under the KDOT Materials List as PQL-42.

Bridge Backwall Protection System

Applicable Specification:

Overland Park Specification: Bridge Backwall Protection System
refers toKDOT Section 1708
  • This item is covered under the KDOT Materials List as PQL-33.