500

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Revision as of 12:40, 12 January 2024 by Dpevans (talk | contribs) (Created page with "== '''<u>RIGID PAVEMENT</u>''' == {| class="wikitable" |501 |PORTLAND CEMENT CONCRETE PAVEMENT (QC/QA) |- | |15-05003 - PORTLAND CEMENT PAVEMENT (QC/QA) |- |502 |PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) |- | |15-05002-R01 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) |- |503 |PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS |- | |15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 |- |504 |DOWEL BAR RETR...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

RIGID PAVEMENT

501 PORTLAND CEMENT CONCRETE PAVEMENT (QC/QA)
15-05003 - PORTLAND CEMENT PAVEMENT (QC/QA)
502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)
15-05002-R01 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)
503 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
504 DOWEL BAR RETROFIT-REPAIR
505 TIE BAR INSERTION-REPAIR
15-PS0012-R1 -  PCCP JOINTS (For Use in Local Authority Projects)