900

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Revision as of 09:07, 16 January 2024 by Dpevans (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

ROADSIDE IMPROVEMENT, PLANTING & SEEDING

901 STORMWATER POLLUTION MANAGEMENT
15-09002-R05 - STORMWATER POLLUTION MANAGEMENT
902 TEMPORARY EROSION AND SEDIMENT CONTROL
15-09004-R01 - TEMPORARY EROSION AND SEDIMENT CONTROL
903 FERTILIZER, AGRICULTURAL LIMESTONE AND PEAT MOSS
904 SEEDING
15-09004-R01 - SEEDING
905 MULCHING
15-09003-R01 - MULCHING
906 TOPSOIL
907 SODDING
15-09005 - SODDING
908 TREES, SHRUBS AND OTHER PLANTS
909 MOWING
910 SOIL COMPOST
911 STONE MASONRY TREE WELLS
912 PARK STRUCTURES
913 WATER SYSTEMS
15-09001 - ROADSIDE IMPROVEMENT
914 LAWN SPRINKLER SYSTEM
915 LAWN SPRINKLER SYSTEM REPAIR
917 PRUNING