User contributions for Joe Archer
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:06, 5 July 2024 Dan Hurley talk contribs blocked Joe Archer talk contribs with an expiration time of indefinite (account creation disabled, autoblock disabled, email disabled, cannot edit own talk page) (No longer employed)
- 16:03, 16 April 2020 diff hist +37 N File:Sec880.pdf GUARDRAIL MODIFICATIONS current
- 16:02, 16 April 2020 diff hist +49 N File:Sec879.pdf PEDESTRIAN PUSH BUTTON MODIFICATION current
- 16:01, 16 April 2020 diff hist +30 N File:Sec871.pdf PROPERTY CORNERS current
- 16:00, 16 April 2020 diff hist +32 N File:Sec870.pdf BENCHMARK MONUMENT current
- 16:00, 16 April 2020 diff hist +38 N File:Sec869.pdf LAND CORNER MONUMENT BOX current
- 15:59, 16 April 2020 diff hist +26 N File:Sec868.pdf PROJECT SIGN current
- 15:59, 16 April 2020 diff hist +39 N File:Sec866.pdf SANITARY SEWER ENCASEMENT
- 15:58, 16 April 2020 diff hist +29 N File:Sec865.pdf SANITARY SEWERS current
- 15:49, 16 April 2020 diff hist +40 N File:Sec864.pdf STORMWATER TREATMENT UNITS current
- 15:47, 16 April 2020 diff hist +20 N File:Sec861.pdf SAWING current
- 15:47, 16 April 2020 diff hist +34 N File:Sec860.pdf CONCRETE MEDIAN NOSE current
- 15:46, 16 April 2020 diff hist +26 N File:Sec856.pdf BRICK PAVERS current
- 15:46, 16 April 2020 diff hist +35 N File:Sec855.pdf CONCRETE PAVER STONES current
- 15:45, 16 April 2020 diff hist +24 N File:Sec850.pdf GEOTEXTILE current
- 15:44, 16 April 2020 diff hist +33 N File:Sec847.pdf MAILBOX ADJUSTMENTS current
- 15:43, 16 April 2020 diff hist +27 N File:Sec843.pdf FLOWABLE FILL current
- 15:43, 16 April 2020 diff hist +42 N File:Sec840.pdf TEMPORARY SURFACING MATERIAL current
- 15:42, 16 April 2020 diff hist +23 N File:Sec836.pdf DRIVEWAYS current
- 15:42, 16 April 2020 diff hist +66 N File:Sec835.pdf RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP current
- 15:41, 16 April 2020 diff hist +40 N File:Sec833.pdf CONCRETE PAVEMENT PATCHING current
- 15:41, 16 April 2020 diff hist +35 N File:Sec831.pdf CONCRETE DITCH LINING current
- 15:40, 16 April 2020 diff hist +26 N File:Sec829.pdf STONE RIPRAP current
- 15:40, 16 April 2020 diff hist +21 N File:Sec828.pdf FENCING current
- 15:39, 16 April 2020 diff hist +49 N File:Sec827.pdf GUARDRAIL, STEEL PLATE (GALVANIZED) current
- 15:39, 16 April 2020 diff hist +40 N File:Sec825.pdf CONCRETE CURB CONSTRUCTION current
- 15:38, 16 April 2020 diff hist +62 N File:Sec824.pdf CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION current
- 15:38, 16 April 2020 diff hist +29 N File:Sec822.pdf PIPE UNDERDRAIN current
- 15:37, 16 April 2020 diff hist +25 N File:Sec820.pdf SLOPE DRAIN current
- 15:37, 16 April 2020 diff hist +81 City of Overland Park Standard Specifications - 2020
- 15:35, 16 April 2020 diff hist +26 N File:Sec817.pdf STORM SEWERS
- 15:33, 16 April 2020 diff hist +46 N File:Sec816.pdf ADJUSTMENT OF MANHOLE AND VALVES
- 15:32, 16 April 2020 diff hist +61 N File:Sec815.pdf STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES current
- 15:32, 16 April 2020 diff hist +37 N File:Sec809.pdf CONCRETE SAFETY BARRIER current
- 15:31, 16 April 2020 diff hist +29 N File:Sec805.pdf TRAFFIC CONTROL current
- 15:31, 16 April 2020 diff hist +45 N File:Sec802.pdf CONTRACTOR CONSTRUCTION STAKING current
- 15:30, 16 April 2020 diff hist +38 N File:Sec746.pdf BRIDGE DECK CONSTRUCTION current
- 15:30, 16 April 2020 diff hist +34 N File:Sec745.pdf BRIDGE NUMBER PLAQUE current
- 15:29, 16 April 2020 diff hist +53 N File:Sec735.pdf PRECAST REINFORCED CONCRETE BOX CULVERT current
- 15:28, 16 April 2020 diff hist +38 N File:Sec726.pdf CONCRETE MASONRY COATING current
- 15:28, 16 April 2020 diff hist +39 N File:Sec725.pdf ABUTMENT DRAINAGE SYSTEMS current
- 15:07, 16 April 2020 diff hist +47 N File:Sec724.pdf BRIDGE BACKWALL PROTECTION SYSTEM current
- 15:06, 16 April 2020 diff hist +22 N File:Sec721.pdf HANDRAIL current
- 15:06, 16 April 2020 diff hist +40 N File:Sec715.pdf PRESTRESSED CONCRETE BEAMS current
- 15:06, 16 April 2020 diff hist +31 N File:Sec711.pdf REINFORCING STEEL current
- 15:05, 16 April 2020 diff hist +25 N File:Sec704.pdf STEEL PILES current
- 15:05, 16 April 2020 diff hist +28 N File:Sec703.pdf DRILLED SHAFTS current
- 15:04, 16 April 2020 diff hist +43 N File:Sec620.pdf ASPHALT SIDEWALK CONSTRUCTION current
- 15:04, 16 April 2020 diff hist +73 N File:Sec619.pdf ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING
- 15:03, 16 April 2020 diff hist +35 N File:Sec618.pdf ASPHALTIC BASE REPAIR current
- 15:03, 16 April 2020 diff hist +70 N File:Sec617.pdf METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED)