File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
15:40, 16 April 2020 | Sec829.pdf (file) | 106 KB | Joe Archer | STONE RIPRAP | 1 | |
15:40, 16 April 2020 | Sec828.pdf (file) | 117 KB | Joe Archer | FENCING | 1 | |
15:39, 16 April 2020 | Sec827.pdf (file) | 102 KB | Joe Archer | GUARDRAIL, STEEL PLATE (GALVANIZED) | 1 | |
15:39, 16 April 2020 | Sec825.pdf (file) | 145 KB | Joe Archer | CONCRETE CURB CONSTRUCTION | 1 | |
15:38, 16 April 2020 | Sec824.pdf (file) | 179 KB | Joe Archer | CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION | 1 | |
15:38, 16 April 2020 | Sec822.pdf (file) | 152 KB | Joe Archer | PIPE UNDERDRAIN | 1 | |
15:37, 16 April 2020 | Sec820.pdf (file) | 91 KB | Joe Archer | SLOPE DRAIN | 1 | |
15:32, 16 April 2020 | Sec815.pdf (file) | 142 KB | Joe Archer | STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES | 1 | |
15:32, 16 April 2020 | Sec809.pdf (file) | 94 KB | Joe Archer | CONCRETE SAFETY BARRIER | 1 | |
15:31, 16 April 2020 | Sec805.pdf (file) | 113 KB | Joe Archer | TRAFFIC CONTROL | 1 | |
15:31, 16 April 2020 | Sec802.pdf (file) | 120 KB | Joe Archer | CONTRACTOR CONSTRUCTION STAKING | 1 | |
15:30, 16 April 2020 | Sec746.pdf (file) | 103 KB | Joe Archer | BRIDGE DECK CONSTRUCTION | 1 | |
15:30, 16 April 2020 | Sec745.pdf (file) | 87 KB | Joe Archer | BRIDGE NUMBER PLAQUE | 1 | |
15:29, 16 April 2020 | Sec735.pdf (file) | 111 KB | Joe Archer | PRECAST REINFORCED CONCRETE BOX CULVERT | 1 | |
15:28, 16 April 2020 | Sec726.pdf (file) | 101 KB | Joe Archer | CONCRETE MASONRY COATING | 1 | |
15:28, 16 April 2020 | Sec725.pdf (file) | 94 KB | Joe Archer | ABUTMENT DRAINAGE SYSTEMS | 1 | |
15:07, 16 April 2020 | Sec724.pdf (file) | 93 KB | Joe Archer | BRIDGE BACKWALL PROTECTION SYSTEM | 1 | |
15:06, 16 April 2020 | Sec721.pdf (file) | 91 KB | Joe Archer | HANDRAIL | 1 | |
15:06, 16 April 2020 | Sec715.pdf (file) | 105 KB | Joe Archer | PRESTRESSED CONCRETE BEAMS | 1 | |
15:06, 16 April 2020 | Sec711.pdf (file) | 97 KB | Joe Archer | REINFORCING STEEL | 1 | |
15:05, 16 April 2020 | Sec704.pdf (file) | 102 KB | Joe Archer | STEEL PILES | 1 | |
15:05, 16 April 2020 | Sec703.pdf (file) | 103 KB | Joe Archer | DRILLED SHAFTS | 1 | |
15:04, 16 April 2020 | Sec620.pdf (file) | 111 KB | Joe Archer | ASPHALT SIDEWALK CONSTRUCTION | 1 | |
15:03, 16 April 2020 | Sec618.pdf (file) | 100 KB | Joe Archer | ASPHALTIC BASE REPAIR | 1 | |
15:02, 16 April 2020 | Sec616.pdf (file) | 105 KB | Joe Archer | POTHOLE REPAIR | 1 | |
14:59, 16 April 2020 | Sec615.pdf (file) | 97 KB | Joe Archer | STREET SWEEPING | 1 | |
14:58, 16 April 2020 | Sec614.pdf (file) | 103 KB | Joe Archer | ASPHALTIC CONCRETE OVERLAY OPERATIONS | 1 | |
14:57, 16 April 2020 | Sec612.pdf (file) | 140 KB | Joe Archer | METHODS OF MILLING OPERATIONS | 1 | |
14:57, 16 April 2020 | Sec608.pdf (file) | 203 KB | Joe Archer | BITUMINOUS SURFACE TREATMENT | 1 | |
14:55, 16 April 2020 | Sec600.pdf (file) | 460 KB | Joe Archer | OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE | 2 | |
14:55, 16 April 2020 | Sec503.pdf (file) | 97 KB | Joe Archer | CONCRETE COLLAR | 2 | |
14:54, 16 April 2020 | Sec502.pdf (file) | 178 KB | Joe Archer | PORTLAND CEMENT CONCRETE PAVEMENT | 2 | |
14:53, 16 April 2020 | Sec316.pdf (file) | 103 KB | Joe Archer | TYPE II STREET REPAIR | 2 | |
14:53, 16 April 2020 | Sec315.pdf (file) | 104 KB | Joe Archer | TYPE I STREET REPAIR | 2 | |
14:51, 16 April 2020 | Sec309.pdf (file) | 94 KB | Joe Archer | FOUNDATION STABILIZATION | 2 | |
14:51, 16 April 2020 | Sec305.pdf (file) | 100 KB | Joe Archer | AGGREGATE BASE AND AGGREGATE SHOULDERS | 2 | |
14:50, 16 April 2020 | Sec304.pdf (file) | 180 KB | Joe Archer | AGGREGATE BASE COURSE (OP SPECIAL) | 2 | |
14:50, 16 April 2020 | Sec303.pdf (file) | 103 KB | Joe Archer | FLY ASH TREATED SUBGRADE | 2 | |
14:49, 16 April 2020 | Sec211.pdf (file) | 94 KB | Joe Archer | GRADING OF SWALES | 2 | |
14:49, 16 April 2020 | Sec209.pdf (file) | 101 KB | Joe Archer | ROCK EXCAVATION AND BLASTING | 2 | |
14:48, 16 April 2020 | Sec204.pdf (file) | 110 KB | Joe Archer | EXCAVATION AND BACKFILL FOR STRUCTURES | 2 | |
14:47, 16 April 2020 | Sec203.pdf (file) | 92 KB | Joe Archer | TREE REMOVAL | 2 | |
14:47, 16 April 2020 | Sec202.pdf (file) | 101 KB | Joe Archer | REMOVAL OF EXISTING STRUCTURES | 2 | |
14:46, 16 April 2020 | Sec201.pdf (file) | 102 KB | Joe Archer | CLEARING AND GRUBBING | 2 | |
14:46, 16 April 2020 | Sec104.pdf (file) | 95 KB | Joe Archer | FORCE ACCOUNT | 2 | |
14:45, 16 April 2020 | Sec103.pdf (file) | 115 KB | Joe Archer | PRE CONSTRUCTION SURVEY | 2 | |
14:44, 16 April 2020 | Sec102.pdf (file) | 148 KB | Joe Archer | CONSTRUCTION VIDEO AND PHOTOGRAPHY | 2 | |
14:44, 16 April 2020 | Sec101.pdf (file) | 96 KB | Joe Archer | MAINTENANCE BOND | 2 | |
08:56, 15 April 2020 | TRF PQL PM MEM OzarkMaterials Thermoplastic.pdf (file) | 84 KB | Bruce Wacker | 1 | ||
08:47, 15 April 2020 | TRF PQL PM CAT OzarkMaterials Thermoplastic.pdf (file) | 150 KB | Bruce Wacker | 1 |