Difference between revisions of "500"
Jump to navigation
Jump to search
m |
m (→RIGID PAVEMENT) |
||
Line 19: | Line 19: | ||
|[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/PDF/15-ER-1-r22.pdf 15-ER-1-R22] - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |[https://www.ksdot.gov/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/PDF/15-ER-1-r22.pdf 15-ER-1-R22] - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | ||
|- | |- | ||
|503OP | |[[503OP]] | ||
|CONCRETE COLLAR | |CONCRETE COLLAR | ||
|- | |- |
Latest revision as of 15:03, 16 January 2024
RIGID PAVEMENT
501 | PORTLAND CEMENT CONCRETE PAVEMENT (QC/QA) |
15-05003 - PORTLAND CEMENT PAVEMENT (QC/QA) | |
502 | PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) |
15-05002-R01 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) | |
503K | PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS |
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015 | |
503OP | CONCRETE COLLAR |
504 | DOWEL BAR RETROFIT-REPAIR |
505 | TIE BAR INSERTION-REPAIR |
15-PS0012-R1 - PCCP JOINTS (For Use in Local Authority Projects) | |