Template:Wage Determinations - CDBG projects: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{| style="background:#D4FFD4; color:#002AFF" border="0" cellpadding="5" width="100%" | {| style="background:#D4FFD4; color:#002AFF" border="0" cellpadding="5" width="100%" | ||
|- | |- | ||
|[[Image:GeekNotesIcon.png|50px]]||'''Note''': The list of current [https://beta.sam.gov/search?index=wd&keywords=KS20190005&date_filter_index=0&date_rad_selection=date&wdType=dbra&page=1 '''Wage Determinations'''] | |[[Image:GeekNotesIcon.png|50px]]||'''Note''': The list of current [https://beta.sam.gov/search?index=wd&keywords=KS20190005&date_filter_index=0&date_rad_selection=date&wdType=dbra&page=1 '''Wage Determinations'''] is to be obtained from SAM.Gov and inserted into the Contract Documents just before advertisement of the project. The Wage Determinations shall be rechecked for modifications ten days prior to bid opening. If modifications have been made since advertisement, an addendum showing the current Wage Determinations shall be issued. If a contract has been awarded but construction has not yet begun within 90 days of the award, the City must determine if any modifications have been issued to the wage decision. If so, a Change Order shall be prepared in order that the contractor adhere to the modified wage decision. | ||
|} | |} |
Revision as of 09:09, 22 October 2019
![]() |
Note: The list of current Wage Determinations is to be obtained from SAM.Gov and inserted into the Contract Documents just before advertisement of the project. The Wage Determinations shall be rechecked for modifications ten days prior to bid opening. If modifications have been made since advertisement, an addendum showing the current Wage Determinations shall be issued. If a contract has been awarded but construction has not yet begun within 90 days of the award, the City must determine if any modifications have been issued to the wage decision. If so, a Change Order shall be prepared in order that the contractor adhere to the modified wage decision. |